COMMON MISTAKES AND EXPERIENCES
WHEN EXCHANGING FRESH CONCRETE
Because of their subjectivity, many people skip the step of learning about how to pour fresh concrete. This has led to many technical errors during the process of concrete construction in the construction area
In particular, the most common mistakes that make the quality of works decline are:
- Poor concrete tank pouring makes the construction durability only last for a short time. After that, the area of the wall appeared a lot of extremely dangerous cracks.
- Laying of concrete layering does not ensure work safety and causes aesthetic loss. Cracks make the home less luxurious and less durable.
- Pouring concrete with excess water allowed. This mistake makes the link between concrete molecules and reinforcement become discrete, not solid.
- Pouring concrete wrongly makes the wall area become slotted due to pores. Above the wall surface, there are many ugly creases.
It can be seen that the cause of the unfortunate mistakes is due to inexperienced construction workers pouring fresh concrete. Also do not know the technical process of concreting construction works.
![]()
If you want to overcome the problem of cracked walls when pouring fresh concrete. People need to keep in mind the following secrets of concrete construction:
1. Flatten Foundation Layer Before Pouring Fresh Concrete
This is the first stage and also the most important stage for the whole concreting process. Only when people are well prepared on the foundation, the concrete surface will have an outstanding smoothness.
2. Reinforcing Steel With Rolls
rolled steel fiber for good bearing capacity and maximum support for shrinkage after casting.
It is important for people to keep in mind that the rebar is on the upper half of the surface than the concrete.
3. Steam Isolation With Plastic Films
The purpose of steam isolation by plastic film is to minimize the phenomenon of irregular dry concrete.
4. Creating Elastic Width With Standard Width
The technical dimensions of the voids must be at least 1/4 of the thickness of the concrete. The expansion joints must be separated by a distance approximately 25 to 30 times the thickness of concrete poured.
5. Protect Fresh Concrete After Pouring Done
- This is the final step to determine 80% of the aesthetic beauty of the project. It is necessary to apply measures to protect the concrete from strong winds.
- Or the sun is too harsh. Only so, after finishing works can own flawless beauty.
![]()
One of our strong points is thanks to the strong changes in the development of technology. BIC is always aiming for the best and new technologies to meet the diverse requirements in construction, from complex construction techniques to the ability to operate and execute large-scale projects.
Why choose BIC for construction to execute the condominium project?
1. Team of human resources - engineers - architects - workers with extensive experience in executing the condominium project
2. BIC always has enthusiasm and always put the mind - reputation as the top.
3. Construction process is strictly managed and safe.
4. With strict control in construction, the construction schedule should always be ensured.
5. Price is suitable for each project implemented.
6. Free and enthusiastic advice - dedicated.
Please contact BIC at hotline: 09.089.50.546 for a free consultation!
BIC is a company specializing in the design and construction of high-quality factories, pre-engineered steel buildings and industrial warehouses. In addition, BIC also designs and constructs office buildings, condominiums, participates in surveys,....
BIC has participated in many construction projects across the country. We have had many experiences in building large-scale projects of famous investors from countries around the world such as Japan, Korean, Taiwan, America (USA), Singapore, .. ..
The reputation of BIC is increasingly strengthened as we become more and more known by the compliments about the professional, serious, entrepreneurial and honest working attitude. BIC is now a trusted brand for big name investors in Vietnam market.
Benefits of customers:
We have been implementing large-scale factory projects from 70,000 square meters to more than 200,000 square meters of foreign enterprises investing in Vietnam such as:Korean, Japan, Taiwan,.... We more and more efforts to become one of the leading brands in terms of prestige, project implementation capacity in Vietnam, reaching out to markets in countries in Southeast Asia and the World.
BIC is committed to providing customers with the best building service, office building, high-rise apartment building. By the enthusiasm and unrelenting efforts of all officials and employees. Especially, we have conquered many big projects and gained the confidence and satisfaction of the "Big Men" in the world who came to Vietnam to invest in the construction.
BIC is very pleased to serve you with the spirit:"COOPERATE TO DEVELOP TOGETHER"