PROCESS OF PROCEDURE OF FACTORY REACHING THE STANDARDS 2022

The process of making design documents for the factory plays a very important role, this directly affects the construction progress and quality of the factory construction project in particular and the construction work in general.

The process of making design documents for the factory plays a very important role, this directly affects the construction progress and quality of the factory construction project in particular and the construction work in general.

When building a factory, is it possible to maximize working efficiency? Is it possible to ensure the safe and sustainable quality of the factory over time? This issue needs to depend a lot on the professional qualifications of the factory design consultant engineers with many years of working experience.

Standard factory documentation process

Before proceeding with the establishment of design documents, the consulting contractor that needs to supervise the work is responsible for surveying, researching carefully the product and production characteristics of the investor to be able to choose. the most suitable and effective construction design solutions to ensure the factory after completing its safe operation to maximize its production capacity and bring high economic efficiency to the investor.

 

1. Main content of factory design documents
Siw the overall plan of a building, the structure of the building block, the diagram of the technology applying the supporting works.
Project perspective drawing board
Architectural design profile
Profile of electrical engineering design of the factory, fire protection and wastewater treatment for environmental protection.
The design of the underground lake, the water source near the factory
Diagram of internal road structure, factory's drainage system to the outside

2. Process of receiving factory design documents

The construction unit needs to meet the investor regularly to grasp the ideas and requirements for the desired investor's factory.

- Make a basic estimate according to the contract
- The design of the total construction site follows the applied technology diagram
- The design diagram of the total construction site and the overall perspective drawing
- Deploying to set up technical design documents: Construction structure, construction diagram of electricity, water, road, other techniques are applied
- Handing over the design documents of the workshop and construction drawings to the investor

3. Three important criteria to have in some factory design documents

- The overall design of the construction site needs to be consistent with the current technology scheme and well meet the plans for the purpose of easily expanding production in the future, in case when the investor wants to expand, they have to pedal. leave and build other extended auxiliary buildings.
- Select materials and equipment to suit different production purposes
- Offer many different drawings and different design solutions to choose the most effective factory design document in terms of usability and quality of a building.

BIC- PRESTIGE CONTRACTOR IN VIETNAM

BIC is a company specializing in the design and construction of high-quality factoriespre-engineered steel buildingsindustrial warehousesIn addition, BIC also designs and constructs office buildings, participates in surveying, testing,...

BIC has participated in many construction projects across the country. We have a lot of experience in building large-scale projects of famous investors from countries around the world such as Japan, Korean, Taiwan, America (USA), Singapore,...

BIC's reputation has been strengthened more and more as we are known more for its professional attitude, seriousness, integrity and honesty in business. BIC is now a trusted brand name for well-known investors in the Vietnamese market.

Benefits of Customer:

We have been implementing large-scale factory projects from 70,000 square meters to more than 200,000 square meters of foreign enterprises investing in Vietnam such as: Korean, Japan, Taiwan, .... We more and more efforts to become one of the leading brands in terms of prestige, project implementation capacity in Vietnam, reaching out to markets in countries in Southeast Asia and the World.

BIC is committed to providing customers with the best building service, office building, high-rise apartment building. By the enthusiasm and unrelenting efforts of all officials and employees. Especially, we have conquered many big projects and gained the confidence and satisfaction of the "Big Men" in the world who came to Vietnam to invest in the construction.

BIC is very pleased to serve you with the spirit: "COOPERATE TO DEVELOP TOGETHER"

BIC is constructing an industrial factory

BIC is constructing an industrial factory

BIC CONSTRUCTION ARCHITECTURAL JOINT STOCK COMPANY

Ho Chi Minh Branch: 7th Floor, Gia Dinh group, 566 National Highway 13, P.Hiep Binh Phuoc, Thu Duc District, Ho Chi Minh City
☎️ Hotline:
0901.815.069
Mail marketing: marketing@bicons.vn
Hanoi Branch: 4th Floor, HUD3 Tower, No. 121-123 Pho To Hieu, Ha Dong District - Hanoi.
☎️ Hotline: 0243.91.92.789
Mail: bic@bicons.vn - Fax: (028) 38 800 892
Mail marketing: marketing@bicons.vn

Website: bicons.vn - bicjsc.com

RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook