CONSTRUCTION PROGRESS OF INDUSTRIAL FACTORY

In order to have a favorable construction progress and avoid factors affecting the construction time as well as the quality of the factory construction schedule, it is necessary and detailed.

In order to have a favorable construction progress and avoid factors affecting the construction time as well as the quality of the factory construction schedule, it is necessary and detailed.

Setting up the factory construction schedule

The closed-door process of setting up the construction schedule of the factory is strictly implemented sequentially as follows:

Step 1: Calculate the volume of work

Declare unit works in the entire system of works, partial items of unit works, items for preparation, auxiliary and finishing work..v.v..
Then, based on the order of construction before and after and the level of relationship between them, arrange to synthesize in a reasonable and appropriate way.

Step 2: Calculate the volume of work

Based on each declared work item, the volume of primary and secondary works, preparatory works and auxiliary works shall be calculated.
Depending on each design stage that requires different levels of detail when calculating the volume, the calculation results are presented in a table.

Step 3: Preliminary construction sequence with unit works

First outline the progress for the main work items, then the secondary work items.

Step 4: Determine the methods and equipment for the main work items

Selection of construction methods and equipment must be based on actual conditions (feasibility).

Step 5: Make a plan on fuel and machinery supply

Based on the outlined preliminary total schedule and the state's targets and norms
The supply plan must be consistent with the state's distribution, supply and allocation plan and the contracts for the delivery of goods, equipment, and semi-finished products of the processing enterprises.

Step 6: Correction and adjustment of the total preliminary plan schedule

After adjusting the preliminary total schedule plan and corresponding supply plans to get a complete total schedule plan, the results should be displayed on the total schedule table and a chart of human and material supply is drawn. equipment for the whole project

 

BIC is a company specializing in the design and construction of high-quality factoriespre-engineered steel buildingsindustrial warehouses. In addition, BIC also designs and constructs office buildings, participates in surveying, testing,...

BIC has participated in many construction projects across the country. We have a lot of experience in building large-scale projects of famous investors from countries around the world such as Japan, Korean, Taiwan, America (USA), Singapore,...

BIC's reputation has been strengthened more and more as we are known more for its professional attitude, seriousness, integrity and honesty in business. BIC is now a trusted brand name for well-known investors in the Vietnamese market.

Benefits of Customer:

We have been implementing large-scale factory projects from 70,000 square meters to more than 200,000 square meters of foreign enterprises investing in Vietnam such as: Korean, Japan, Taiwan, .... We more and more efforts to become one of the leading brands in terms of prestige, project implementation capacity in Vietnam, reaching out to markets in countries in Southeast Asia and the World.

BIC is committed to providing customers with the best building service, office building, high-rise apartment building. By the enthusiasm and unrelenting efforts of all officials and employees. Especially, we have conquered many big projects and gained the confidence and satisfaction of the "Big Men" in the world who came to Vietnam to invest in the construction.

BIC is very pleased to serve you with the spirit: "COOPERATE TO DEVELOP TOGETHER"

BIC is constructing an industrial factory

BIC CONSTRUCTION ARCHITECTURAL JOINT STOCK COMPANY

Ho Chi Minh Branch: 7th Floor, Gia Dinh group, 566 National Highway 13, P.Hiep Binh Phuoc, Thu Duc District, Ho Chi Minh City
☎️ Hotline: 0908950546
Mail marketing: marketing@bicons.vn
Hanoi Branch: 4th Floor, HUD3 Tower, No. 121-123 Pho To Hieu, Ha Dong District - Hanoi.
☎️ Hotline: 0243.91.92.789
Mail: bic@bicons.vn - Fax: (028) 38 800 892
Mail marketing: marketing@bicons.vn

 

 
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook