Pre-engineered steel buildings are construction methods with steel frames with original square structures connected by components. Pre-engineered steel buildings are applied in pre-engineered steel buildings to support the foundation, roof, and walls. The development of steel frame manufacturing technology is constantly changing to meet all construction needs across the country.
Covered floor covers underground technical conduit systems that go in the space between two floors
Works to protect electrical wiring, cables or any other material on the floor from the invasion of insects, chemicals that are not difficult to heat and humidify the concrete floor. With a rack system designed to suit each project, each type of equipment is placed on the subfloor.

Reduces noise and vibrations for equipment during operation
Suppressing + ions in the environment creates more accurate operation for machinery and equipment placed on the floor. Minimizing electric current to workers even in the event of a fire or explosion
Fire way allows timely relocation of equipment in the event of a fire incident
Clean, dry environment for floor equipment
Parameters to note when building industrial pre-engineered steel buildings
The width of the house depends on the requirements of the investor
The length of the house depends on the requirements of the investor
Roof slope affects rainwater drainage on roof, usually roof slope is taken =15%
The column step is the distance between the columns in the vertical direction of the house, depending on the length and purpose of use
Structure of pre-engineered steel buildings
Column and truss main frames: As composite members of cross-section I with a constant cross-sectional height or walls
The secondary structural members purlin struts and beams are cold-formed Z- and C-shaped mild steel bars or hollow girders.

Roll-formed steel plate
The primary and secondary structural members are all cut, punched, drilled, welded and preformed in the factory before being transported to the site. The quality of in-house components is always guaranteed as they are fully manufactured in the factory according to standards and rigorously tested. Steel structural tank components are connected together by bolts
Industrial pre-engineered steel buildings
Light weight compared to other materials and traditional building materials
Spare material saving
Simple and easy to install, still moving quickly despite all weather conditions
Make the most of factory space
High homogeneity
Easy to dismantle or scale up
Save time and money
Pre-engineered steel buildings can be installed with various structural accessories such as mezzanine floors, crane beams with flat floors on the roof. Elevated walkways and roof accessories, roof frills and partitions
Pre-engineered steel buildings have good drainage by using vertical roof systems, drainage walls and roof frills. Pre-engineered steel buildings are extremely flexible house systems that allow internal equipment to meet all functions and exterior decoration to meet high aesthetics.