Steel frame factory with corrugated iron roof is an architectural product with a pre-fabricated steel frame and accurately installed according to the drawing structure, capable of bearing the corrugated iron roof, the roof ceiling and the live loads acting on the roof. The design consultancy and erection and completion of the work are all carefully considered and calculated by a team of engineers.
The steel frame structure of the factory has good bearing capacity, reducing the cost of foundation columns, especially the steel frame material of the corrugated iron roof is reduced compared to other types of roofs. Because of the number of wide span purlin trusses, only the corrugated iron roof is wide and ensures good shielding.
The production and installation time of the tank connection between the components is shortened. The corrugated iron is cut to the desired length, which is convenient for all installation sizes.

Construction of steel frame factory with corrugated iron roof is considered the optimal solution.
Application of steel frame factory construction with many advantages such as good bearing capacity, noise resistance, heat resistance, easy drainage. For construction to meet quality standards, it is necessary to refer.
- Measure carefully
+ Thoroughly measure the area covered by the corrugated iron roof before buying materials to avoid buying too much or too little
+ Calculate the total area of the roof with the formula that will be calculated width x length x slope.
+ To calculate the area of the roof, in addition to the two parameters of length and width of the factory that can be measured underground, it is necessary to calculate the slope of the roof.

Roof with slope less than 8% is the most standard. Roof material also affects the slope of the roof, the steeper the roof, the more materials it takes and more importantly, the better the water absorption.
The formula for calculating roof slope: l = H/L
Where: H is the height of the roof
I is the slope
L is the length of the roof
After calculating the roof slope, the distance of purlins can be calculated.
- Prepare materials
Based on the above calculation results, the next step is to buy accompanying materials along with a sufficient number of roofing sheets to cover the roof of the factory.
+ Need to prepare a separate place to put the necessary tools for roofing and 1 drum to store unnecessary items.
+ Tools such as drills, saws, self-welding wood screws, staple guns, metal roofing screws, ¼ inch roof nails, drill bits.
- Corrugated iron
The corrugated iron roofing also needs to comply with the implementation process.

Step 1: Handle the surrounding: If there is a gutter, you should put the louvers and roof frills on top of each other, if not, nail them to attach to the roof, close around the entire roof.
Step 2: The first roofing sheet is placed on the roof to protrude a few centimeters, then use screws with rubber gaskets to fasten it, 10 inches between the nails.
Step 3: Use the connecting plate
Bend the slit panels into a V-shape to match the roof and then place it on the roof slit, making the roof more beautiful and durable.
Step 4: The final stage checks to see if there are any deficiencies and removes any excess components.
Construction unit price of steel frame factory with corrugated iron roof
When there are enough materials and accessories, labor is also the next concern. How much is the unit cost of roofing labor for 1m2.
The unit cost of hiring workers for corrugated iron roofing can be consulted.
The price of corrugated iron roofs ranges from 60,000 to 110,000 VND/m2 and the rental price depends on the star level of the house to be roofed.