The cost of building a factory of 3000m2 is invested by investors wishing to expand production or change production locations in accordance with long-term business costs.
Building a factory with an area of 3,000m2 is one of the top concerns investors pay attention to when deciding to build a factory. What factors affect the unit price of steel frame factory construction.
The unit price of house construction includes economic and technical expenses, including the cost of materials, labor, and machinery to complete a unit of construction volume. Simple and easy to understand even for non-construction experts. Use the general unit price for 1m2 of construction. It includes all the necessary work to complete the project.

Factory construction unit price: 1,900,000 - 2,200,000 VND/m2
Factory details:
+ Maximum height 7.5m
+ Composite steel truss frame, using good quality box steel, solid steel, H and L steel
+ Factory with skylight
+ 0.45mm thick cold corrugated iron roof
+ 220mm construction wall, 2m high, cold corrugated iron
+ Corrugated iron shutters, aluminum and glass

Quotation for package construction of prefabricated factories and warehouses
Detailed construction price list of factory work items
+ Construction of prefabricated factory with low investment unit price 1,200,000 - 1,700,000 VND/m2
+ Construction of pre-engineered factory with high investment unit price 1,500,000 - 2,500,000 VND/m2
+ Dossiers of application for construction permits for warehouses and factories 50,000,000 - 200,000,000 VND/ documents needing professional advice on construction
+ Construction completion documents for factories and warehouses 30,000,000 - 200,000,000 VND/document with expert advice on legal handling
+ Full package design consulting fee with unit price of 50,000 - 100,000 VND/m2 needs consultants to provide an appropriate solution for each case.
+ Communicating installation of transformer station, factory unit price 500,000,000 - 1,500,000,000 VND/station
+ Construction of factory electrical system with unit price of 30,000 - 60,000 VND/m2
+ Construction of factory fire protection system 15,000 – 20,000 VND/m2
Factory cost quotation 3000m2 will vary and is for reference only. Factory construction prices are directly affected by other objective factors
The function of the factory will determine the design of the construction plan of the structure and the materials used. This factor is the most decisive to factory construction
The construction workshop needs to be suitable with the function of the warehouse, the demand for production use, to best meet the requirements for durability against heat, sound insulation, heat insulation, cover to promote the full value of the factory.
The location of the work will affect many other factors that generate construction costs. The geology of the construction site is good, flat and solid, reducing the cost of the foundation, good geology does not have to pay the construction cost of the foundation to ensure the sustainability of the work. The construction location is located on the convenient transportation route, convenient electricity and water, and the factory will quickly be built, the cost will be lower.
Large-scale factory construction will have a lower unit price than large-scale factories.
Factory design, each structure and design is different, the price will be completely different. The design of the factory with skylights and skylights, the ventilated corrugated iron doors of aluminum and glass, the stairs, and the separate aisles will also affect the cost of warehouses and workshops.
Materials used to build the warehouse
Prefabricated factories are mainly narrow, so 60% of the cost is in the materials. There are times when the price of steel fluctuates according to the demand in the market, leading to fluctuations in the unit price of warehouse construction. How to choose the construction time to avoid unexpected price increases of materials due to the supply and demand situation in the market?
Construction time 3 - 6 months depending on the size and requirements of the investor. Manpower, materials and machinery will be calculated from the beginning to ensure the construction progress, so additional machinery and equipment must be added.
Choose a reputable factory construction contractor with many years of experience.