FACTORY CONSTRUCTION UNIT PRICE 2022

The unit price of industrial factory construction is quoted as a summary of the design and construction price of the factory. Unit price by type of factory; detailed unit price of each item, materials, structure, factory construction price. This is an article to help people have an overview of the cost of building a factory to calculate and estimate the finance for the investor's project.
The unit price of industrial factory construction is quoted as a summary of the design and construction price of the factory. Unit price by type of factory; detailed unit price of each item, materials, structure, factory construction price. This is an article to help people have an overview of the cost of building a factory to calculate and estimate the finance for the investor's project.

Factory construction unit price by type of factory

Construction of common factory unit price 1,300,000 - 1,700,000 VND/m2
Construction of prefabricated factory 1,500,000 - 1,700,000 VND/m2
Construction of steel concrete factory 2,500,000 - 3,500,000 VND/m2
Factory design 50,000 – 80,000 VND/m2

Unit price of foundation construction item

Usually includes 2 unit prices for building materials for the foundation and labor costs
+ Foundation structure depending on the factory foundation needs to meet the unit price of 300,000 - 500,000 VND/m2
+ Structure layer lwps black sand, nylon layer, concrete layer, cut by heat expansion groove, unit price 150,000 - 170,000 VND
+ Base paint if there is self-leveling expoxy paint, unit price 375,000 VND/m2
+ Labor cost unit price 5,000 - 8,000 VND/m2

Construction unit price of steel structure

Pre-engineered steel frames use mainly steel materials. Depending on the need to use quality steel from different brands, there will be different costs
+ Items for processing steel structure including steel truss frame and steel truss, price ranges from 5,000 - 8,000 VND/kg
Unit price for construction and erection of factory steel structure
+ Install the main frame, install the roof frame, install the door consonlse unit price 50,000 VND/m2
+ Install non-heat-resistant corrugated iron roof unit price 20,000 VND/m2
+ Installing corrugated iron wall unit price 25,000 VND/m2
+ Installing gutters, water pipes unit price 75,000 VND/m2
+ Install frills for only 25,000 VND/m2

Detailed unit price for factory construction

Pile foundation D250 – reinforced concrete 310,000/m Vinakyoei steel, code 6mm)
Driving melaleuca piles 4.5m in length, D8-10 30,000/tree Melaleuca poles type 1- straight, full condition
Demolition of concrete pile head 70,000/piece
Manual excavation of ground 65,000/m3
Mechanized digging 20,000/m3
Landfilling manually 40,500/m3
Mechanized earth filling 15,000/m3
Raise the foundation with leveling sand 180,500/m3
Leveling leveling 0-4 240,000/m3
You pour excess land 62,000/m3
Concrete lined with stone 1×2, M150 950,000/m3 Ha Tien XM, Holcim
Concrete stone 1×2, grade 250 1,250,000/m3 Ha Tien XM, Holcim
Formwork for foundation, columns, floor beams.. 160,500/m2
Complex structural formwork (silo, arch, lintel...) 220,500/m3
Fabrication and installation of construction reinforcement 22,500/kg Viet Nhat Steel, South, Pomina
Build a wall of 10 8x8x18 bricks and pipes 1,250,000/m3 Type 1 . tunnel bricks
Building walls 20 bricks 8x8x18 1,650,000/m3 Tunel bricks type 1
Build a wall of 10 bricks 4x8x18 2,200,000/m3 Type 1 . tunnel bricks
Build a wall of 20 4x8x18 card bricks 1,950,000/m3 Type 1 . Tuynel bricks
Exterior plastering, M75 85,000/m2 Ha Tien XM, Holcim
Inner wall plastering, M75 70,000/m2 Ha Tien XM, Holcim
Plastering stairs, slats, pylons, sills, M75 85,000/m2 Ha Tien XM, Holcim
Flooring with ceramic tiles of all kinds 270,000/m2 Tile price 180,000 VND/m2
Ceramic tiles of all kinds 320,000/m2 Tile price 200,000 VND/m2
Granite paving of all kinds 880,000/m2 Black Hue, Ward Yen, Red B. Định
Making gypsum ceiling drop 60×60 130,500/m2 9mm sheet, Vinh Tuong frame.
Making ceiling gypsum sink 156,000/m2 9mm sheet, Vinh Tuong frame.
Making plastic ceiling 115,000/m2 Taiwan plastic sheet
Putty putty on the wall 23,590/m2 Joton wall putty
Put putty on columns, beams, ceilings, ladders 28,000/m2 Joton wall putty
Water-based paint on the outside wall 27,500/m2 Maxilite paint + lining
Paint beams, ceilings, walls in the house 22,5500/m2 Maxilite paint + lining
Waterproofing sika according to the process 160,500/m2 C Sika technology
Aluminum frame plasterboard partition – 1 side 220,500/m2 12mm sheet, Vinh Tuong frame.
Double-sided plasterboard partition 250,500/m2 12mm sheet, Vinh Tuong frame.
Anti-heat treatment of roof floor 250,000/m2 Brick, or 6 holes
Tile roof 300,000/m2 Dong Tam, Thai
Roof tiles, roof tiles 45,000/piece Dong Tam, Thai
Frame (column + frame + beam + skylight + louver) 28,500/kg CT3 steel, TCXDVN
Girders (roof + columns + purlins) 32,500/kg CT3 steel, TCXDVN
Purlin C 25,500/kg Steel CT3, TCXDVN
4.5dem flower bed 175,000/m2 CT3 steel, TCXDVN
Cemboard floor 20mm slab 1.2×2.4 m 250,600/m2 Thong Hung C.ty
Roofing tole 165,500/m2 Tole Hoasen, Povina, South
Note: The above factory construction quotation is for reference only, the quotation depends on many factors and may change according to the market price of raw materials. To get the fastest and most accurate quote for the factory project.
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook