INDUSTRIAL FACTORY HEIGHT STANDARDS

Factory height standards are specified according to standards. Clearance height from 7-10m, roof top height from 9.8-14m. With this height, the factory owner can arrange floor shelves in accordance with the floor load to make the most of the workshop area.

Factory height standards are specified according to standards. Clearance height from 7-10m, roof top height from 9.8-14m. With this height, the factory owner can arrange floor shelves in accordance with the floor load to make the most of the workshop area. The wall structure covers the height from the floor to +3-4m using a brick wall structure of 200 thickness, plastering, matic bait, water paint.

Factory height standard

In addition, the best standard of heat and noise protection for employees working and convenient to protect goods and equipment, electrical wiring in the wall, ensure safety for production and operation, and limit risks. risk is not worth it.

When conducting investment in construction of factories or any other project, there are separate construction standards that are clearly defined in the TCVN by specialized units. For industrial workshops, items are strictly controlled, not only in terms of height standards.

Foundation standards

The foundation item is considered important because it bears the load for the entire factory. According to current standards TCVN 5547 -2012 and TCVN 4453-1995 foundation concrete is used commercial concrete with strength 250Mpa reinforced CB400, weak geology reinforced by centrifugal concrete pile pressing.

Factory floor

The actual floor standard needs to be treated with a tight 0x4 stone foundation structure, covered with water-resistant nylon and constructed with 250Mpa compressive strength concrete and concrete, and anti-cracking steel mesh. Rub the foundation and ensure the degree is equal to pahwngr and the quality of the work is in accordance with international standards.

Capony roof

This item uses 0.45mm thick color coated square corrugated iron and uses insulation to limit the impact of weather temperatures. To protect goods and save energy for optimal use, the roof of the door, the roof of the delivery dock position ensures the safety of goods when it is raining or sunny.

Internal road system standards

The road system is designed with the width of the roadbed from 3.5 -12m surrounding the factory. The road to the gate and the front yard has a minimum width of 7m, ensuring that goods transport vehicles go into each other smoothly. Traffic lighting system at special locations with safety warning signs

Ventilation system

For the roof of the factory, a natural ventilation system of 3.5m is designed. To catch natural wind and circulate air inside and outside the factory. The hong side arranges corrugated iron doors to take in the natural wind

Dock Leveler

For warehouse, the layout of high-quality hydraulic Dock Levelers with high-quality design conforms to standards, which need to be widely designed to withstand high loads, ensuring easy transportation of goods.

Ancillary office items

The office house is designed with ancillary items providing lighting system, fully arranged medical rooms, separate layout from warehouse area.

Fire protection system

Design standard fire protection lake with high pressure pump system and automatic variable valves. The fire hydrants are arranged in many convenient locations for water supply when an incident occurs. Regular maintenance to ensure that when there is a problem, the fire protection equipment is working.

Anti-insect mesh

At the window positions, a small-sized lattice is arranged for the purpose of preventing insects and birds from entering the nesting workshop.

Lighting element

Provide adequate natural light and lighting to ensure adequate lighting throughout the production process

Security system

Design and construction according to customer requirements

Waste water treatment system

For all domestic wastewater, the toilets of the office building are filtered through a 3-compartment septic tank, before being discharged into the sewage system.

 