Design and construction of a reputable quality industrial factory. You are looking for a unit that has enough experience to design and construct a factory, legally complete project in accordance with the law. Please refer to the quotation as well as the items shared by BIC to choose a place to send the expectation of a profitable factory right during the factory investment process.

BIC is one of the leading construction contractors with many years of experience in factory design, factory construction and legal support for projects from the South to the North. BIC engineers with high technology constantly update and improve their qualifications and modern technology in the design and construction of factories. BIC has practical experience in projects with a scale of tens of hectares, has experience in designing functions for each type of factory in different fields. Customers can put their trust in us.
BIC and a team of dedicated architects and construction engineers with more than 10 years of experience in the field and have a certain position in the market of factory design and construction of package factories. You are planning to build a new factory or expand and renovate your factory, you are doing business, also consider the investment costs.

Type of steel structure factory building construction area 10000m2 to 2000m2 design unit price is about 25,000 VND/m2
Type of steel structure factory with scale of 2,000m2 - 3,000m2, factory design unit price in the range of 22,000 VND/m2
Factory scale construction steel structure factory 3,000m2 - 5,000m2 with factory design unit price 20,000vnd/m2
Construction steel structure factory area 5,000m2 - 10,000m2, design unit price will be 15,000vnd/m2
Factory area of steel structure construction 10,000m2 - 100,000m2, factory design unit price is 10,000 VND/m2
Type of reinforced concrete factory with an area of 1,000m2- 2,000m2, the design unit price will be 25,000 VND/m2
Reinforced concrete factory with an area of 2,000m2 - 3,000m2, factory design unit price is 22,000 VND/m2
Reinforced concrete factory with an area of 3,000m2 - 5,000m2, factory design unit price is 20,000 VND/m2
Type of reinforced concrete factory with an area of 5,000m2- 10,000m2, design unit price is about 15,000vnd/m2
Type of reinforced concrete factory with a scale of 10,000 - 100,000m2, factory design unit price is about 10,000 VND/m2
The design fee is calculated by the formula: Total area (m2) x unit price (VND/m2)
The unit price of the factory design for a construction permit will be directly exchanged and agreed upon between the construction contractor and the investor.

Design unit price for fire prevention and fighting approval: negotiable
Environmental impact assessment unit price: negotiable
Unit price for geological survey: negotiable
Actual factory design case
Let's try to put the real case of a garment factory design project with a total area of 4500m2. Factory design cost will be calculated as follows:
+ The project is a steel structure factory with a design unit price of: 20,000 VND/m2
Factory design cost = Design unit price (VND/m2) x Construction area m2 = VND 20,000/m2 x 4,500 m2 = VND 90,000,000

+ For the case of a 2-storey reinforced concrete factory with an area of about 2000 m2
The work of the steel structure warehouse has a design unit price of 20,000 VND/m2
Factory design cost = design unit price x construction floor cost m2 x number of floors = 20,000 VND/m2 x 2000 m2 x 2 floors = 80,000,000 VND
For an accurate factory design quote for your factory please contact us. The design unit price and completion time can be adjusted depending on the size of the work and other requirements of the investor during the project design implementation.
+ Layout plan of the overall ground, floor plan of building blocks, ground plan of technology, auxiliary works
+ Perspective profile + architectural profile
+ Profile of reinforced concrete truss frame structure
+ Technical records of electricity, fire protection, water supply and drainage systems, waste ...
+ Water tower underground
+ Road foundation structure, peripheral drainage system

Step 1: The basic design of the design drawing will be divided into 2 parts: theory and drawing
+ The explanation part: describe the location of the technical infrastructure works, make the design plan. The method of applying technology depends on whether the construction project requires it or not. Architecture projects. The main structure plan, technical system,.. Fire prevention plan in accordance with the regulations of the State. Environmental protection plan during construction.
+ Drawings: overview drawing of the project, cross-section, etc. The drawing of a technological line, a technological diagram, depends on whether the construction project requires it or not. Architectural plan drawing. Drawing of the main structure plan
Step 2: Design construction drawings
Often the design of construction drawings is an important part because it fully shows the specifications of the materials used and the details of the appropriate components according to each item's regulations, ensuring the conditions for construction implementation. works and can be based on that to predict the cost of implementation.

The investor approach process captures key requirements from the investor, captures ideas and functional needs
+ Preliminary estimates, contract drafting
+ Design the total ground according to the technology diagram to apply for a construction permit
+ Design the context of the work
+ Implement structural design, mechanical and electrical design, water technology and other technical structures
+ Handing over design drawing documents
+ Pay the remaining costs and liquidate the contract.
Cases arising after accepting the preliminary design plan: 20% of the design value. After having the design of the total ground + overall perspective: 40% of the design value and after the contract has been implemented 70% of the time 70% of the design value.
Unit price for design and construction of prefabricated factory, industrial prefabricated warehouse, beetoong 100mm garage for goods with total weight of forklifts operating under 5 tons, construction area dwungj 1,500m2 duwoic height 7.5m steel columns or steel truss concrete columns with 100mm dwungj construction boxes under 1.5m high and then covered with corrugated iron, corrugated iron roof: Construction unit price is from 1,350,000 VND/m2 – 1,550,000 VND/m2 depending on the area factory size.

Unit price applied to construction of a large aperture pre-engineered steel factory with 150mm concrete foundation, 2 layers of iron used for heavy goods, with a total weight of less than 6.5 tons of forklift trucks: Construction unit price is in the range of 1,500. 000d/m2 - 1,800,000d/m2 depending on the size of the workshop area and depending on the industry of operation, BIC will advise the column truss frame, the factory floor to get the exact price for your case.
Factory construction unit price applicable to prefabricated houses, reinforced concrete factories, unit price 2,500,000 VND/m2 - 3,500,000 VND/m2 applied for workshops 1 late, 1 floor - 2 floors or more depending on the size factory expansion.
Industrial factory design, mechanical production, food, enterprise, competitive price. BIC is committed to quality design to ensure usability as well as bring the best experience during factory operation. When receiving design requirements for factories, BIC always researches thoroughly about the geographical location as well as the specific nature of the company's business so that the architect has the most overview before conducting the design. . From there, the optimal implementation plan for each item as well as the use of the project is proposed.