We cannot provide a specific factory building quote, but can only give you a few factors you can consider and contact construction contractors, construction experts to get specific quote for your project.
When requesting a factory building quote, consider the following factors:
Area: The size and area of the workshop will affect the construction cost. Provide information on the area of the entire land and construction area.

Location: The geographical location of the factory can affect the cost of construction. Provide location-specific information and available infrastructure (e.g. proximity to major transport routes, water supply, electricity, etc.).
Design: The type of facility, style and complexity of the design will affect the cost. Describe the basic design requirements or provide available design documents where available.
Materials: The type of building materials you want to use will also affect the cost. You can consider using materials like concrete, steel, wood, etc.
Equipment and technology: If you have special requirements for plant equipment or technology, this can also increase costs. Make sure you have clearly defined these requirements.
Progress: The time it takes to complete the project is also an important factor. If you have a special request about the schedule, mention it.
To receive an accurate and complete quote for your factory building project, I recommend contacting the building contractors or construction professionals in your area. They will be able to specifically assess your request and provide you with a detailed and tailored quote.
Common factory construction unit price 1,300,000 - 1,700,000/m2 Contact BIC for a quote
Construction of prefabricated factory unit price 1,500,000 - 2,600,000/m2 Contact BIC for quotation
Construction of reinforced concrete factory unit price 2,500,000 – 3,500.00/m2 Contact BIC for a quote
Apply for permission to build a factory with unit price of 50,000,000 - 200,000,000 and depending on the case, the documents are complicated
Factory design package including office factory; landscape design unit price 50,000 - 80,000 / m2 in that range. On the specific case after going to survey.
Construction of factory transformer station unit price 500,000,000 - 1,500,000,000/station depends on the cave and the required capacity. Contact BIC for a quote
Construction of factory electrical system package unit price 30,000 - 50,000/m2. Contact BIC for a specific quote
Construction of factory fire protection system with unit price of 14,000 - 18,000/m2 Contact for details in the item for exact price
Construction and installation of factory cranes from 2 tons to 100 tons double girder - single girder price 150,000,000 - 550,000,000 / crane. Contact us for a detailed quote on a case-by-case basis
Construction of elevator system to transport goods in the factory. Contact for quotation
Finished construction of the factory unit price 30,000,000 - 400,000,000 / document 100% free legal support

Pile foundation – reinforced concrete unit price 310,000/m
Pile driving 4.5m length – D8-10 unit price 30,000/tree
Demolition of concrete pile head unit price 70,000/piece
Digging the ground manually, unit price 65,000/m3
Excavation by mechanized unit price 20,000/m3
Landfilling by hand, unit price 40,500/m3
Landfilling by mechanized unit price 15,000/m3
Raise the foundation with leveling sand 180,500/m3
Raise the level of the degree, mix 0-4, unit price 240,000/m3
You pour excess land unit price 62,000/m3
Concrete lined with stone 1x2, M150 unit price 950,000/m3
Stone concrete 1x2 mark 250 unit price 1,250,000/m3
Formwork for foundation, columns, floor beams… unit price 160,500/m2
Formwork complex structure silo, arch, lintel ) unit price 220,500/m3
Processing and installing construction reinforcement 22,500/kg
Building a wall of 10 bricks and pipes 8x8x18 unit price 1,250,000/m3 tunnel brick type 1
Wall workshop 20 bricks 8x8x18 unit price 1,650,000/m3 tunnel brick type 1
Wall workshop of 10 4x8x18 card bricks, unit price 2,200,000/m3 tunnel brick type 1
Wall workshop 20 card bricks 4x8x18 unit price 1,950,000/m3 tunnel brick type 1
Exterior wall plastering, M75 unit price 85,000/m2
Wall plastering in M75 unit price 75,000/m2
Plastering stairs with seno M75 vertical pillars, unit price 85,000/m2
Flooring with ceramic tiles of all kinds, unit price 320,000/m2
Granite tiles of all kinds, unit price 880,000/m2
Making gypsum board drop 60x60 unit price 130,500/m2
Making gypsum ceiling drop 60x60 unit price 130,500/m2
Making ceiling plaster sink unit price 156,000/m2
Making plastic ceiling unit price 115,000/m2
Plastering putty on the wall unit price 23,590/m2
Plastering putty on the column and ceiling beams, unit price 28,000/m2
Water-based paint on the outside wall unit price 27,500/m2 Maxilite paint + lining
Paint ceiling beams and walls in the house unit price 22,550/m2 Maxlite paint + lining
Waterproofing sike according to the process unit price 160,500/m2 Contact BIC for specific technology details
Aluminum frame plasterboard partition – 1 side unit price 220,500/m2
Double-sided plasterboard partition unit price 250,500/m2
Anti-heat treatment of roof floor unit price 250,000/m2 of brick or 6 holes
Roofing with corrugated iron or tile, please contact BIC
Roofing corrugated iron, contact price BIC
Purlin C unit price 25,500/kg
Tole flower 4.5 bring floor covering unit price 175,000/m2
Cemboard floor 20mm slab 1.2x2.4m unit price 250,600/m2
Tole roof unit price 165,500/m2
The unit price may change according to the price of raw materials and the unit price fluctuates in the market and the size of the factory area, which has a specific unit price for a specific project.
This is a commonly used factory building today with many preeminent benefits: cost savings, durability and high mobility. Quick installation, environmentally friendly green solution.
Regarding the structure of the factory quotation, the steel frame package includes foundation, foundation bolts, columns, beams, trusses, purlins, corrugated iron roof, eight light roofs, skylights, surrounding walls, cantilever, bracing, canopy roof, trough. water collection, drainage pipe, lightning rod.

Quotation of the unit of construction of the pre-engineered factory with medium scale is used as a reference
Erection of construction items and factory erection unit price ranges from 400,000 to 600,000 VND/m2
Construction of steel structure construction items construction unit price 350,000 - 500,000 VND /m2
The total cost of finishing the factory ranges from 750,000 to 1,100,000 VND/m2
Quotation for construction of steel frame factory with aperture >20m
Erection of steel structures for construction and erection of factories, unit price is about 300,000 - 450,000 VND/m2
Construction of the workshop construction competition item, unit price is about 250,000 - 400,000 VND/m2
Total cost of factory finishing items, unit price 550,000 - 850,000 VND/m2
Item of processing and manufacturing steel structure
+ Steel truss frame
+ Steel truss calculation
Calculated in kilograms, unit price is 5,000 - 8,000 VND/kg
Erection of steel structure frame includes erection of main frame, erection of roof frame, erection of door consonle. Unit price 50,000 VND/m2
Installation of corrugated iron roof unit price 20,000 VND/m2
Installation of corrugated iron wall unit price 25,000 VND/m2
Installing gutters, water pipes unit price 75,000 VND/m2
Install border, only unit price 25,000 VND/m2
The unit price of item details may change according to the market price at that time. Bic affirms to be a construction contractor in the field of design consultancy and full-package factory construction with many years of experience and a skilled team. Please contact us for the most accurate advice and quotation.