PLANNING TAN DUC – BINH THUAN INDUSTRIAL PARK

Construction subdivision planning of Tan Duc industrial park decided to approve the investment planning for construction of works: operator house, service area, wastewater treatment plant, booster station 1 and a part of ornamental trees The land for construction of factories and factories is about 51.04 hectares

Construction subdivision planning of Tan Duc industrial park decided to approve the investment planning for construction of works: operator house, service area, wastewater treatment plant, booster station 1 and a part of ornamental trees The land for construction of factories and factories is about 51.04 hectares

PLANNING TAN DUC – BINH THUAN INDUSTRIAL PARK

Phase II (year 2021 - 2023): Complete construction of all remaining items and put them into operation.

Tan Duc Industrial Park, Ham Tan District, Binh Thuan Province has four neighborhoods:

+ To the East: the existing residential area and Tan Minh town

+ To the West: Suoi Le and agricultural land

+ The South borders: Agricultural land, residential land (about 200m from National Highway 1);

+ Bordering to the North: Agricultural production land

Area of 300 hectares

Built in a uniform and modern manner with a wide internal traffic chain, large green area, electricity, water supply and drainage, Tan Duc Industrial Park Binh Thuan is eligible for global criteria, flexible and suitable land plots for diversity. Workshop model.Tan Duc Binh Thuan Industrial Park is an important infrastructure, many industries, attracting industrial fields using advanced technology to completely overcome the waste that does not pollute the environment. Points are industrial categories such as : manufacturing textile products ; biomechanical equipment, construction materials, electronics, mechanics, pharmaceutical products, food, consumer goods...

Location of Tan Duc Industrial Park

Internal utilities of Tan Duc Industrial Park project in Binh Thuan

Internal traffic chain: legitimately built, ensuring that the traffic in the entire infrastructure is convenient. The system is built as follows:

+ Main roads in infrastructure are 32 m wide - 4 lanes

+ Branch roads in the infrastructure are 23 m wide – 2 lanes

All internal roads are built and implemented in strict compliance with national regulations, and are completed with asphalt concrete. The internal roads are also provided with a complete and aesthetic high-voltage lighting chain

Power distribution chain: the power distribution to the infrastructure is taken from the 110/35/22kv substation. The high-voltage power system is carried along the internal traffic in the infrastructure.

Water supply chain: purified water is supplied with a capacity of 30,000 m3 daily from the pure water workshop. Water is brought to the factory fence by a global standard water supply chain.

Water and waste treatment chain: wastewater is collected to the wastewater workshop of the treatment infrastructure up to water standard a (qcvn 40: 2011/btnmt) before the time of discharge to the general chain of the infrastructure. Wastewater workshop was built with a treatment capacity of 2, 900m3/day – night

Waste is contracted by workshops in the infrastructure to collect and transport garbage out of the infrastructure to avoid polluting the environment.

Through the connection chain between the contact data capital of the infrastructure through the post and telecommunications network, all contact information requirements are committed and all essential solutions can be delivered such as: private switchboard, global mobile, teleconference, leased channel, high speed internet, email, etc...

Fire prevention and extinguishing chain: the infrastructure is installed with a chain of recommendations, prevention and extinguishing of fire in strict compliance with national regulations

Utilities outside the segment

From the location of Tan Duc Binh Thuan Industrial Park, it is easy to link to the central areas as well as utilities such as highways, airports, seaports, city centers, .. thereby increasing trade capacity. , development of the project.

Bordering National Highway 1A

Distance from Dau Giay-Phan Thiet highway: 3 km.

Long Thanh International Airport: 75 km.

Distance from Tan Son Nhat Airport: 110 km

Distance from Saigon Port: 95 km

Distance from Cai Mep Port: 90 km

Distance from Ho Chi Minh City: 95km

Distance from Phan Thiet City: 60 km.

Distance from Lagi Town: 30 km.

Operation period: 50 years from the date of issuance of the decision

Implementation progress: 36 months from the date of handing over the land.

Land rent: 60$/m2

Service fee: $0.025/m2/month

Service fee includes: Periodic maintenance: security system, general cleaning, landscape maintenance, utilities, internal roads, sidewalks, Maintenance, infrastructure maintenance, traffic, Security general infrastructure: rainwater drainage, sewers, water and electricity in the industrial park, 24/7 security, cleaning and sanitizing the industrial park

Electricity bill: $0.03/Kwh

Waste water fee: $0.28/m3

Water fee: 0.4$/m3

In terms of its nature, it is a highly specialized multi-sector concentrated industrial park, attracting industries using modern technology to thoroughly treat wastes without polluting the environment, focusing on various types of waste products. industries such as manufacturing textile products, manufacturing mechanical machinery and equipment, building materials, electronics, mechanics, pharmaceuticals, food... and other industries according to current regulations.

When in operation, Tan Duc Industrial Park is expected to attract many secondary investment projects with a total registered capital of up to hundreds of millions of USD, participating in creating jobs for thousands of workers. Thereby, it not only contributes significantly to the local budget but also promotes the development of southern Binh Thuan industry, contributing to improving the material and spiritual life of people in the project area...

Using land structure

According to Decision No. 230/QD-TTg dated February 23, 2021 of the Prime Minister, the project of investment in construction and infrastructure business of Tan Duc Industrial Park is invested by Sonadezi Binh Thuan Joint Stock Company. The project is implemented with a total investment capital of 1,200 billion VND, of which the state's contributed capital is 400 billion VND. The project has a scale of 300 hectares in Tan Duc commune, Ham Tan district.

Specifically, in 2021, the investment preparation procedures for Tan Duc industrial park will be carried out such as: Issuing investment certificates, making investment deposits, design appraisal and licensing of industrial park infrastructure construction; announced land acquisition and focused on completing compensation and clearance by the end of 2021; at the same time, implementing infrastructure construction (rainwater drainage, waste drainage, water supply, lighting,...) phase 1 of the industrial park; implementing investment procedures to build the resettlement area of Tan Duc Industrial Park in order to provide accommodation for displaced households.

In 2022, continue to invest in technical infrastructure of Tan Duc Industrial Park; completing the infrastructure of the resettlement area of Tan Duc Industrial Park; at the same time, investing in water supply channels to serve Tan Duc Industrial Park from Bien Lac - Ham Tan canal and water supply works to the fence of Tan Duc industrial zone; This year, the investor unit strives to attract secondary investment to fill 30% of the industrial land for lease.

By 2023, to complete the infrastructure of the industrial zone; complete landscaped and isolated green areas in the IZ to create a landscape for the IZ; strive to attract secondary investment to fill 70% of industrial land for lease.