SONG BINH – BINH THUAN INDUSTRIAL PARK

Song Binh Industrial Park is the largest and only titanium deep processing industrial park in Vietnam, specializing in titanium deep processing. Located about 50 km from Phan Thiet city center and 60 km from Vinh Tan deep water port (Tuy Phong), located near a large source of titanium ore raw materials.

Song Binh Industrial Park is the largest and only titanium deep processing industrial park in Vietnam, specializing in titanium deep processing. Located about 50 km from Phan Thiet city center and 60 km from Vinh Tan deep water port (Tuy Phong), located near a large source of titanium ore raw materials.

OVERVIEW OF SONG BINH – BINH THUAN INDUSTRIAL PARK

Building site:

Song Binh commune, Bac Binh district, Binh Thuan province, is located 700m from National Highway 28B axis, 0.5km from North-South railway, 10km from National Highway 1A, about 50km from Phan Thiet city center and far from Vinh Tan deep water port Phong) 60km.

Scale: 300 hectares.

- Industrial land for lease: 207.01 ha

- Leased land area: 68.39 ha (33% occupancy rate)

- Area of industrial land with completed infrastructure and ready for lease: 138.62 ha.

Technical infrastructure:

It has been and is being built synchronously, ensuring the standards of a modern industrial park.

- Traffic: The traffic planning of the IZ is arranged in a rectangular form, in which there is a main route with a width of 50 m connecting from National Highway 28B connecting functional areas, the remaining routes connecting with the main route. forming a smooth road system to ensure access to each land lot by means of transport, the total length of internal roads is 17.51 km.

- Electricity: There is a 110KV/22KV transformer station located on the D3 route, which is connected from the Dai Ninh - Phan Ri 110 KV line to Song Binh Industrial Park, this is the source of electricity for production for the industrial zone. The total capacity of 02 phases is 126 MVA (in the period to 2015, the capacity is 63 MVA; in the period 2016-2020, the capacity is 63 MVA); 22KV power line connecting from 63 MVA station (total capacity of 02 phases is 120 MVA) on running along roads in the industrial zone to supply factories.

- Water: Construction of a domestic water supply treatment area with a capacity of 30,000 m3/day, combined with a system of HDPE pipes D150cm, D100cm approaching each land lot in the industrial park to supply according to the needs of households. secondary investment.

- Communication: The communication system for the IZ will be connected to the telecommunications network of Binh Thuan province, through the local postal system and arranged to connect to the factory gate in the IZ.

- Wastewater treatment system: Industrial and service wastewater must be collected to the centralized wastewater treatment system (30,000 m3 day/night) of the industrial zone and treated to column A standards according to QC40: 2011/BTNMT.

Advantage:

- The terrain is flat, geologically stable, the ground has high bearing strength, which is favorable for the construction of industrial works.

- Located near a large source of titanium ore raw materials (not within the titanium mineral investigation boundary, about 12km from the mining area) convenient for transportation and processing.

- System of synchronous and well-planned roads (700m from National Highway 28B axis, 0.5km from North-South railway, 10km from National Highway 1A, about 50km from Phan Thiet city center and Vinh Tan deep-water port - Tuy Phong 60km).

- Far away from residential areas.

- Convenience of electricity and water supply.

- Advantages of future expansion.

- Human resources: Song Binh commune has 1,005 households with 4,336 people, the ratio of men and women is balanced; The labor force in working age is about 2,537 people, accounting for 48.5%. The residential area of Luong Son town is 10km away and some neighboring communes will be a large source of unskilled labor and trained workers for the industrial park.

- Insurance: Bac Binh district is located in region IV, applying the minimum wage in the area of insurance payment for employees is 2,920,000 VND.

Priority is given to projects in the following investment fields:

Processing industry: Being the only industrial zone with deep processing industry of titanium minerals with 03 main product groups:

+ Titanium slag, artificial rutin, smooth and super-fine zircon.

+ Pigment (dioxidetitanium), zircon compounds (such as zircon oxychloride)

+ Porous titanium, metal tian, titanium alloy.

Titanium ore, after being exploited from the coastal areas of Binh Thuan province such as: Bac Binh - Tuy Phong area, Luong Son - Bac Binh sub-area, North Phan Thiet area, Ham Thuan Nam area, Ham Tan area... transferred to processing factories in the IZ to serve the deep processing, producing high economic value products for export and domestic production needs.

Land rental price: 3.98 - 4.54 USD/m2/year (price excludes VAT, varies depending on the payment plan);

Fees for using infrastructure, wastewater treatment, water supply, electricity, telephone, internet, environmental sanitation: In progress.

Other fees: Investors are entitled to sign to use other utility services (if any) in the IP and pay fees according to the current prescribed fee rates of the investor or service providers.

RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook