Hoa Phu Industrial Park covers an area of 181 ha, 15 km from Buon Ma Thuot city center along National Highway 14 to the south. The province has completed the detailed planning and has the policy of the Government to add it to the Master Plan of Industrial Parks managed by the Government.
Investor: Vietnam Rubber Industry Corporation
Location: Hoa Phu industrial park, Belonging to hamlet 12, Hoa Phu commune, Buon Ma Thuot city and 15 km southwest of the city center:
To the north, it borders Ea Tuor stream;
To the south, it borders the shallow creek;
To the east, it borders on the land for growing sugarcane;
The West borders the Service Urban Area.

613km from Ho Chi Minh City, Ho Chi Minh City. Kontum 50km
100km from Pleiku airport
215 km from Quy Nhon port
Area: With an area of 181 hectares, designed synchronously and modernly with a large internal traffic system, large green area, electricity, water supply and drainage in Hoa Phu industrial park in accordance with international standards of plots. flexible land, suitable for many types of factories, of which factory construction land accounts for 66.7%;
Land for traffic accounts for 15.58%;
Green land accounts for 11.2%;
Land for operation center and service works accounts for 3%;
Land for key works + wharves accounts for 3.55%.
Infrastructure construction capital: 221,992 billion VND, of which:
Expenses for construction of the operator house, fence, trees: 20,315 billion;
Funding for construction of technical preparation infrastructure: 56.408 billion;
Traffic infrastructure construction cost: 55,206 billion;
Construction cost of power supply system: 4,673 billion;
Construction cost of water supply system: 23,427 billion;
Construction cost of dirty water drainage and sanitation system: 29,100 billion;
Compensation for clearance: 22,293 billion;
Reserve budget: 10,571 billion.
Term: 50 years (from 2013)
Land legal: Red book

Industrial park orientation: Hoa Phu is oriented to be a multi-industry industrial park using modern high technology in accordance with international standards and being environmentally friendly, expected to attract industries such as:
Mechanical assembly, production of spare parts, electronic components
Consumer production, handicrafts
Textile industry
Food processing and agricultural products and some other industries
Human resources: Dak Lak province has a population of about 2.171 million people, of which the proportion of children under 15 years old accounts for 37.6%. Elderly people over 60 years old (for men) and over 55 years old (for women) is 7.1%. In mountainous districts, the percentage of children under working age is up to 45%. The second remarkable feature is that in Dak Lak, men outnumber women (50.9 percent male, 49.1 percent female). Contrary to the national rate. In localities with mining industry, this rate is even higher, for example: Cam Pha, male 53.2%, female 46.8%.
Infrastructure & facilities:
Landscape: More than 12% of the total area of the industrial park is planted with trees along the roads and other areas
Lawns and public green areas are planted to improve the industrial environment
Projects to build factories and other buildings must be approved by management
Land condition: Average leveling height 9m/ Soil quality: hard leveled
Internal traffic system: reasonably designed to ensure smooth traffic throughout the industrial park. The system is designed as follows:
+ The main roads in the industrial park are 32 m wide - 4 lanes
+ Branch roads in the industrial park are 23 m wide - 2 lanes
All internal roads are designed and constructed in strict compliance with national regulations, and finished with Asphalt asphalt. The internal roads are also equipped with a complete, aesthetic high-pressure lighting system

Power supply system: The power supply to the industrial park is taken from 110/35/22KV substation. High voltage electricity network is provided along the internal traffic in the industrial park.
Water supply system: Clean water is supplied with a capacity of 30,000 m3 per day from the clean water plant. Water is supplied to the factory fence by an international standard water supply pipe system.
Waste water and waste treatment system: Waste water is collected to the industrial park's wastewater treatment plant to meet water standard A (QCVN 40:2011/BTNMT) before being discharged to the general system of the industrial park. The wastewater plant was built with a treatment capacity of 2,900m3/day – night
Waste is contracted by factories in the industrial park to classify, collect and transport garbage out of the industrial park to avoid causing environmental pollution.
Exhaust gases of factories are installed with national standard filtration systems before being discharged into the natural environment
Communication system: the industrial park is installed with an underground communication cable system and is provided to the fence of the factory by an international standard cable system.
Through the connection system between the communication center of the industrial park through the post and telecommunications network, all communication needs are guaranteed and are capable of providing all necessary services such as: Private switchboard , international telephone, teleconference, leased line, high speed internet, email, etc.
Fire prevention and fighting system: the industrial park is installed with a warning, prevention and fire fighting system in strict compliance with national regulations.
Fire hydrants are installed at internal traffic hubs, and at all factories to ensure effective protection of the whole area from fire and explosion incidents.
Finance: The system of banks such as Vietinbank, Vietcombank, Sacombank, Agribank, BIDV, techcombank has branches around the industrial park.
Customs: All customs formalities are done at Customs
Industrial park management fee: 0.6 USD/m2/year. This fee is paid annually in the first month of the year
Electricity fee: 0.1 USD during peak hours/ 0.05 USD during normal hours/ 0.03 USD during off-peak hours
Clean water usage fee: 0.40 USD/m3. The amount of clean water used is calculated according to the reading on the water meter
Waste water & solid waste treatment fee: $0.28/m3. Pre-treatment quality requirement is grade B after treatment is grade A
Selling price: negotiable