TAN PHU INDUSTRIAL PARK - LAM DONG

Investor: Lam Dong Industrial Park Management Board Location: Tan Phu industrial park, in Tan Phu commune, Lam Dong province 613km from Ho Chi Minh City 35 km from Da Lat city 5km from Da Lat Lien Khuong Airport, 280km from Tan Son Nhat International Airport Distance from Binh Thuan port: 280 km

DETAILS OF TAN PHU INDUSTRIAL PARK - LAM DONG

Investor: Lam Dong Industrial Park Management Board

Location: Tan Phu industrial park, in Tan Phu commune, Lam Dong province

613km from Ho Chi Minh City

35 km from Da Lat city

5km from Da Lat Lien Khuong Airport, 280km from Tan Son Nhat International Airport

Distance from Binh Thuan port: 280 km

Area: With an area of ​​472 hectares, designed synchronously and modernly with a large internal traffic system, large green area, electricity, water supply and drainage in Tan Phu industrial park in accordance with international standards of plots. flexible soil, suitable for many types of factories

Term: 50 years (from 2020)

Land legal: Red book

Industrial park orientation: Tan Phu is oriented to be a multi-industry industrial park using modern high technology in accordance with international standards and being environmentally friendly, expected to attract industries such as:

Mechanical assembly, production of spare parts, electronic components

Consumer production, handicrafts

Textile industry

Food processing and agricultural products and some other industries

Human resources: Lam Dong province has a population of about 1,551 million people, of which the population structure has changed in a positive direction: The proportion of the population under 15 years old decreased from 29.37% in 2009 to 28.35% in 2012. In contrast, the proportion of the population aged 15-64 years (which is the main group of the labor force) increased from 66.19% in 2009 to 66.61%, and the population aged 65 and over increased. from 4.44% in 2009 to 5.04%.

Infrastructure & facilities:

Landscape: More than 12% of the total area of the industrial park is planted with trees along the roads and other areas

Lawns and public green areas are planted to improve the industrial environment

Projects to build factories and other buildings must be approved by management

Land condition: Average leveling height 9m/ Soil quality: hard leveled

Internal traffic system: reasonably designed to ensure smooth traffic throughout the industrial park. The system is designed as follows:

+ The main roads in the industrial park are 32 m wide - 4 lanes

+ Branch roads in the industrial park are 23 m wide - 2 lanes

All internal roads are designed and constructed in strict compliance with national regulations, and finished with Asphalt asphalt. The internal roads are also equipped with a complete, aesthetic high-pressure lighting system

Power supply system: The power supply to the industrial park is taken from 110/35/22KV substation. High voltage electricity network is provided along the internal traffic in the industrial park.

Water supply system: Clean water is supplied with a capacity of 30,000 m3 per day from the clean water plant. Water is supplied to the factory fence by an international standard water supply pipe system.

Waste water and waste treatment system: Waste water is collected to the industrial park's wastewater treatment plant to meet water standard A (QCVN 40:2011/BTNMT) before being discharged to the general system of the industrial park. The wastewater plant was built with a treatment capacity of 2,900m3/day – night

Waste is contracted by factories in the industrial park to classify, collect and transport garbage out of the industrial park to avoid causing environmental pollution.

Exhaust gases of factories are installed with national standard filtration systems before being discharged into the natural environment

Communication system: the industrial park is installed with an underground communication cable system and is provided to the fence of the factory by an international standard cable system.

Through the connection system between the communication center of the industrial park through the post and telecommunications network, all communication needs are guaranteed and are capable of providing all necessary services such as: Private switchboard , international telephone, teleconference, leased line, high speed internet, email, etc.

Fire prevention and fighting system: the industrial park is installed with a warning, prevention and fire fighting system in strict compliance with national regulations.

Fire hydrants are installed at internal traffic hubs, and at all factories to ensure effective protection of the whole area from fire and explosion incidents.

Finance: The system of banks such as Vietinbank, Vietcombank, Sacombank, Agribank, BIDV, techcombank has branches around the industrial park.

Customs: All customs formalities are done at Customs

Management fee:

Industrial park management fee: 1USD/m2/year. This fee is paid annually in the first month of the year

Electricity fee: 0.1 USD during peak hours/ 0.05 USD during normal hours/ 0.03 USD during off-peak hours

Clean water usage fee: 0.40 USD/m3. The amount of clean water used is calculated according to the reading on the water meter

Waste water & solid waste treatment fee: $0.28/m3. Pre-treatment quality requirement is grade B after treatment is grade A