Phu Tai Industrial Park is the first industrial park of Binh Dinh province established under the Prime Minister's Decision No. 1127/QD-TTg dated December 18, 1998, within the socio-economic development orientation. of Binh Dinh province until 2010. The birth of Phu Tai Industrial Park aims to implement the Resolution of the VIII Party Congress, the Resolution of the 15th Party Congress of Binh Dinh Province on industrial development, creating a step in economic restructuring. in the direction of industrialization and modernization, attracting domestic and foreign capital sources for development investment and creating jobs for laborers in the province.

Investor: Binh Dinh Investment and Construction Joint Stock Company
Location: Phu Tai Industrial Park in Tran Quang Dieu and Bui Thi Xuan wards, Quy Nhon city, located on the intersection of National Highway 1A and Highway 19; 12km from Quy Nhon seaport; 20km from Phu Cat airport; 2km from Dieu Tri railway station. There are limits as follows:
+ North border: Ha Thanh River and current population.
+ South border: Current population and road to Long My Industrial Park.
+ East borders: Current residential area and National Highway 1A.
+ West borders: Hon Cha Mountain.
Distance
By air – 20 km from Phu Cat airport
Waterway -Qui Nhon port: 12 km
By road: Located near National Highway 19, National Highway 1A
Area: With an area of 345.8 hectares, designed synchronously and modernly with a large internal traffic system, large green area, electricity, water supply and drainage in Phu Tai industrial park in accordance with international standards. flexible land plots, suitable for many types of factories
Term: 50 years (1998-2048)
Land legal: Red book
Industrial park orientation: Phu Tai is oriented to be a multi-industry industrial park using modern high technology in accordance with international standards and being environmentally friendly, expected to attract industries such as:
Mechanical assembly, production of spare parts, electronic components
Consumer production, handicrafts
Textile industry
Food processing and agricultural products and some other industries
.jpg)
Human resources: Binh Dinh province has a population of about 2,468 million people, of which 65% of the population are workers under the age of 35. This is an abundant human resource, along with labor resources from other neighboring provinces, so it can provide enough human resources for businesses in the industrial park.
Infrastructure & facilities:
Landscape: More than 12% of the total area of the industrial park is planted with trees along the roads and other areas
Lawns and public green areas are planted to improve the industrial environment
Projects to build factories and other buildings must be approved by management
Land condition: Average leveling height 9m/ Soil quality: hard leveled
Internal traffic system: reasonably designed to ensure smooth traffic throughout the industrial park. The system is designed as follows:
+ The main roads in the industrial park are 32 m wide - 4 lanes
+ Branch roads in the industrial park are 23 m wide - 2 lanes
All internal roads are designed and constructed in strict compliance with national regulations, and finished with Asphalt asphalt. The internal roads are also equipped with a complete, aesthetic high-pressure lighting system
Power supply system: The power supply to the industrial park is taken from 110/35/22KV substation. High voltage electricity network is provided along the internal traffic in the industrial park.
Water supply system: Clean water is supplied with a capacity of 30,000 m3 per day from the clean water plant. Water is supplied to the factory fence by an international standard water supply pipe system.
Waste water and waste treatment system: Waste water is collected to the industrial park's wastewater treatment plant to meet water standard A (QCVN 40:2011/BTNMT) before being discharged to the general system of the industrial park. The wastewater plant was built with a treatment capacity of 2,900m3/day – night
Waste is contracted by factories in the industrial park to classify, collect and transport garbage out of the industrial park to avoid causing environmental pollution.
Exhaust gases of factories are installed with national standard filtration systems before being discharged into the natural environment
Communication system: the industrial park is installed with an underground communication cable system and is provided to the fence of the factory by an international standard cable system.
Through the connection system between the communication center of the industrial park through the post and telecommunications network, all communication needs are guaranteed and are capable of providing all necessary services such as: Private switchboard , international telephone, teleconference, leased line, high speed internet, email, etc.
Fire prevention and fighting system: the industrial park is installed with a warning, prevention and fire fighting system in strict compliance with national regulations.
Fire hydrants are installed at internal traffic hubs, and at all factories to ensure effective protection of the whole area from fire and explosion incidents.
Management fee:
Industrial park management fee: 1USD/m2/year. This fee is paid annually in the first month of the year
Electricity fee: 0.1 USD during peak hours/ 0.05 USD during normal hours/ 0.03 USD during off-peak hours
Clean water usage fee: 0.40 USD/m3. The amount of clean water used is calculated according to the reading on the water meter
Waste water & solid waste treatment fee: $0.28/m3. Pre-treatment quality requirement is grade B after treatment is grade A
Selling price: negotiable