The expanded Hoa Cam Industrial Park is the project located closest to the center of Da Nang city, which is completing all legal procedures to be able to hand over the site to investors in 2022.
Project name: Hoa Cam Industrial Park – Expansion phase
Location: Hoa Tho Tay Ward, Cam Le District, City. Danang
Investor: Hoa Cam Industrial Park Investment Joint Stock Company
Total investment: 105 billion VND.
Total land area: 13,109ha
Industrial land area: 10.94ha
Land for green trees and electricity safety corridor: 1.39ha
Land for traffic and technical ditches: 0.77ha.

Expanded Hoa Cam Industrial Park is located in Hoa Cam Industrial Park, located in Hoa Tho Dong Ward, Cam Le District, Da Nang City. Easy access to many important places of Da Nang city such as:
Adjacent to National Highway 14B
8 km from Da Nang International Airport
Only 1 km from Da Nang - Quang Ngai highway
National Highway 1A 2km
Tien Sa Port 15 km
Da Nang City Center 8 km

Infrastructure of Hoa Cam Industrial Park expanded
The infrastructure
Infrastructure works such as power supply, water supply, roads, communication ... in Hoa Cam Industrial Park are invested and built ready to serve investment projects.
Internal transportation system
The internal traffic system of the industrial park is connected with external traffic by 04 doors in 4 directions to facilitate the movement of workers and freight.
The main traffic of the Industrial Park includes 3 main axes connecting National Highway 14B to the center of the Industrial Park, dividing the land area into 4 zones, the main road is arranged with 3-lane road, road bed width 11.25m, summer 2x6m , only 23.25m red line. Regional roads have a width of 2 lanes, the pavement is 2×4.5m, and the red line is only 16.5m.
The internal traffic system is organized in the form of a checkerboard grid, the roads are designed to intersect about 300-400m, making the most of the effective use of both sides of the industrial park road.

System of landscape architecture
Landscape trees in the Industrial Park are arranged to be planted along both sides of the road (sidewalks), isolated areas... create shade and general landscape for the Industrial Park, reduce environmental pollution and protect human health.
In addition, inside factories, enterprises, and enterprises all design their own green tree planting area and landscape architecture according to regulations.
Electricity distribution system
The power supply system is connected from Cau Do transformer station with capacity of 110/35/22KV(2×25)MVA, 22KV power network (dual circuit) will be supplied to 22/0.4KA substations for each substation. factory.
Enterprises in the Industrial Park only invest after the 22/0.4KA transformer station to machinery equipment and internal lighting for enterprises.
Water supply system
The water supply system for the Industrial Park is taken from the water supply system of Cau Do Water Plant with a capacity of 210,000m3 /day and night, on the Ø200 pipeline running along National Highway 14B.
The water supply system for enterprises is installed up to the water meter for each factory and enterprise to ensure quality and quantity for production and living purposes.
Drainage and wastewater treatment system
Local wastewater in each factory and enterprise is treated to the prescribed standards before being discharged into the sewer network in the Industrial Park and continues to be cleaned at the industrial park's wastewater treatment station with a capacity of 4,000 m3/day. .
Wastewater will be treated according to TCVN 5945-2005 standard before being discharged into the area's common drainage system.
Postal and telecommunications service system
The post and telecommunications network will be established modernly up to international standards as expected, equipped with MDF, a telephone system and a high-speed internet connection installed by the post and telecommunications industry, capable of meeting all requirements. investor requirements.
Bank credit system
Transaction points of some big banks in Da Nang City will be opened right at the Central building of the Industrial Park to create favorable conditions for businesses in the Industrial Park.
Carry out transactions and are ready to provide customers with diversified products, high-quality full-service financial packages, and the best utilities to properly and promptly meet all the needs of businesses.

Total planned land area: 13.1 ha
Industrial land for lease: 13.1 ha
Industrial land area for lease: 0.00 ha
Remaining industrial land area: 0.00 ha
Industrial land area without infrastructure 0.00 ha
Fill rate : 0%
Note: The project is in the process of completing legal procedures. The site clearance has been completed, waiting for the Da Nang Department of Natural Resources and Environment to update the land price list.
Currently, the expanded Hoa Cam Industrial Park has filled up with investors. Investors have completed the booking procedure.
Electronic industry, mechanical engineering, assembly
Food processing industry
Industry of building materials, high-class interior decoration
Other industries (plastics, cosmetics, packaging...)
Currently, the occupancy rate of industrial zones is quite high, except for tax incentives, Da Nang city has issued Decision 67/QD-UBND on the abolition of investment incentive policies.
Project planning map
Advantage:
Easy access to a large number of young, highly skilled and trained workforce from universities, colleges, high schools and vocational schools of Danang City.
Human resources of Danang City account for about 50% of the population. In addition, human resources also originate from a number of neighboring cities such as: Quang Nam, Thua Thien Hue, Quang Ngai... to promise to meet the recruitment needs of investors.
The entire infrastructure of the Industrial Park has been completed 100%.
The transportation system is synchronous when it only takes 15 minutes to reach the center of Da Nang city and important places of the city such as the international airport, Lien Chieu port, railway station, bus station, Danang - Quang Ninh Expressway. Ngai, Da Nang - Hue Expressway, National Highway 1A, ...
The location is very close to the center of Da Nang city and has a convenient transportation system, which is very convenient for logistics businesses that need to rent warehouses to transship goods.
For details, please refer to the data sheet below.
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investors | Hoa Cam Industrial Park Investment Joint Stock Company | |
| Location | Hoa Tho Tay Ward, Cam Le District, Da Nang City | |
| Acreage | total area | 261 ha |
| Factory land area | ||
| Space available | ||
| The percentage of trees | 10% | |
| Operating time | 50 years | |
| Current Investor | VIỆT NAM TOKAI, FOSTER | |
| Main job | Electronic industry, mechanical engineering, assembly; processing agricultural products and food; building materials industry, high-grade interior decoration; Other industries (plastics, cosmetics, packaging...) | |
| Occupancy | ||
| LOCATION & DISTANCE: | ||
| Road | Da Nang City Center: 8 km | |
| Air | Da Nang International Airport: 5 km | |
| Train | Da Nang Station: 7 km | |
| Seaport | Tien Sa Seaport: 8 km | |
| INFRASTRUCTURE: | ||
| Geological | K 1,25-2,25 | |
| Internal traffic | Main road | 4 lands |
| Side branch road | 2 lands | |
| Electricity supply | Voltage | Power line: 110/22KV |
| Power capacity | 2x25 MVA | |
| Clean water | Wattage | 21.000m3/day |
| Highest capacity | ||
| Waste water treatment system | Wattage | 4.000m3/day |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 35 USD |
| Lease term | 50 years | |
| Type/Grade | Level A | |
| Payment methods | Yearly | |
| Deposit | 10% | |
| Minimum area | N/A | |
| Workshop | $5 | |
| Management fee | Management fee | 0.3USD/m2 |
| Payment methods | 12 months | |
| Giá điện | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Clean water price | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A (QCVN 40:2011/BTNMT) | |
| Other fees | Insurance (yes) | |