HOA CAM EXPANSION INDUSTRIAL PARK - DA NANG

The expanded Hoa Cam Industrial Park is the project located closest to the center of Da Nang city, which is completing all legal procedures to be able to hand over the site to investors in 2022.

Overview of the expanded Hoa Cam Industrial Park

The expanded Hoa Cam Industrial Park is the project located closest to the center of Da Nang city, which is completing all legal procedures to be able to hand over the site to investors in 2022.

Project name: Hoa Cam Industrial Park – Expansion phase

Location: Hoa Tho Tay Ward, Cam Le District, City. Danang

Investor: Hoa Cam Industrial Park Investment Joint Stock Company

Total investment: 105 billion VND.

Total land area: 13,109ha

Industrial land area: 10.94ha

Land for green trees and electricity safety corridor: 1.39ha

Land for traffic and technical ditches: 0.77ha.

Location of expanded Hoa Cam Industrial Park

Expanded Hoa Cam Industrial Park is located in Hoa Cam Industrial Park, located in Hoa Tho Dong Ward, Cam Le District, Da Nang City. Easy access to many important places of Da Nang city such as:

Adjacent to National Highway 14B

8 km from Da Nang International Airport

Only 1 km from Da Nang - Quang Ngai highway

National Highway 1A 2km

Tien Sa Port 15 km

Da Nang City Center 8 km

Infrastructure of Hoa Cam Industrial Park expanded

The infrastructure

Infrastructure works such as power supply, water supply, roads, communication ... in Hoa Cam Industrial Park are invested and built ready to serve investment projects.

Internal transportation system

The internal traffic system of the industrial park is connected with external traffic by 04 doors in 4 directions to facilitate the movement of workers and freight.

The main traffic of the Industrial Park includes 3 main axes connecting National Highway 14B to the center of the Industrial Park, dividing the land area into 4 zones, the main road is arranged with 3-lane road, road bed width 11.25m, summer 2x6m , only 23.25m red line. Regional roads have a width of 2 lanes, the pavement is 2×4.5m, and the red line is only 16.5m.

The internal traffic system is organized in the form of a checkerboard grid, the roads are designed to intersect about 300-400m, making the most of the effective use of both sides of the industrial park road.

System of landscape architecture

Landscape trees in the Industrial Park are arranged to be planted along both sides of the road (sidewalks), isolated areas... create shade and general landscape for the Industrial Park, reduce environmental pollution and protect human health.

In addition, inside factories, enterprises, and enterprises all design their own green tree planting area and landscape architecture according to regulations.

Electricity distribution system

The power supply system is connected from Cau Do transformer station with capacity of 110/35/22KV(2×25)MVA, 22KV power network (dual circuit) will be supplied to 22/0.4KA substations for each substation. factory.

Enterprises in the Industrial Park only invest after the 22/0.4KA transformer station to machinery equipment and internal lighting for enterprises.

Water supply system

The water supply system for the Industrial Park is taken from the water supply system of Cau Do Water Plant with a capacity of 210,000m3 /day and night, on the Ø200 pipeline running along National Highway 14B.

The water supply system for enterprises is installed up to the water meter for each factory and enterprise to ensure quality and quantity for production and living purposes.

Drainage and wastewater treatment system

Local wastewater in each factory and enterprise is treated to the prescribed standards before being discharged into the sewer network in the Industrial Park and continues to be cleaned at the industrial park's wastewater treatment station with a capacity of 4,000 m3/day. .

Wastewater will be treated according to TCVN 5945-2005 standard before being discharged into the area's common drainage system.

Postal and telecommunications service system

The post and telecommunications network will be established modernly up to international standards as expected, equipped with MDF, a telephone system and a high-speed internet connection installed by the post and telecommunications industry, capable of meeting all requirements. investor requirements.

Bank credit system

Transaction points of some big banks in Da Nang City will be opened right at the Central building of the Industrial Park to create favorable conditions for businesses in the Industrial Park.

Carry out transactions and are ready to provide customers with diversified products, high-quality full-service financial packages, and the best utilities to properly and promptly meet all the needs of businesses.

Current status of land use planning of expanded Hoa Cam Industrial Park

Total planned land area: 13.1 ha

Industrial land for lease: 13.1 ha

Industrial land area for lease: 0.00 ha

Remaining industrial land area: 0.00 ha

Industrial land area without infrastructure 0.00 ha

Fill rate : 0%

Note: The project is in the process of completing legal procedures. The site clearance has been completed, waiting for the Da Nang Department of Natural Resources and Environment to update the land price list.

Currently, the expanded Hoa Cam Industrial Park has filled up with investors. Investors have completed the booking procedure.

Priority areas for investment attraction:

Electronic industry, mechanical engineering, assembly

Food processing industry

Industry of building materials, high-class interior decoration

Other industries (plastics, cosmetics, packaging...)

Investment incentive policy

Currently, the occupancy rate of industrial zones is quite high, except for tax incentives, Da Nang city has issued Decision 67/QD-UBND on the abolition of investment incentive policies.

Project planning map

Review of expanded Hoa Cam Industrial Park

Advantage:

Easy access to a large number of young, highly skilled and trained workforce from universities, colleges, high schools and vocational schools of Danang City.

Human resources of Danang City account for about 50% of the population. In addition, human resources also originate from a number of neighboring cities such as: Quang Nam, Thua Thien Hue, Quang Ngai... to promise to meet the recruitment needs of investors.

The entire infrastructure of the Industrial Park has been completed 100%.

The transportation system is synchronous when it only takes 15 minutes to reach the center of Da Nang city and important places of the city such as the international airport, Lien Chieu port, railway station, bus station, Danang - Quang Ninh Expressway. Ngai, Da Nang - Hue Expressway, National Highway 1A, ...

The location is very close to the center of Da Nang city and has a convenient transportation system, which is very convenient for logistics businesses that need to rent warehouses to transship goods.

For details, please refer to the data sheet below.

Category Detail
OVERVIEW: 
Infrastructure investors Hoa Cam Industrial Park Investment Joint Stock Company
Location Hoa Tho Tay Ward, Cam Le District, Da Nang City
Acreage total area 261 ha
Factory land area  
Space available  
The percentage of trees 10%
Operating time 50 years
Current Investor VIỆT NAM TOKAI, FOSTER
Main job Electronic industry, mechanical engineering, assembly; processing agricultural products and food; building materials industry, high-grade interior decoration; Other industries (plastics, cosmetics, packaging...)
Occupancy  
LOCATION & DISTANCE: 
Road Da Nang City Center: 8 km
Air Da Nang International Airport: 5 km
Train Da Nang Station: 7 km
Seaport Tien Sa Seaport: 8 km
INFRASTRUCTURE: 
Geological K 1,25-2,25
Internal traffic Main road 4 lands
Side branch road 2 lands
Electricity supply Voltage Power line: 110/22KV
Power capacity 2x25 MVA
Clean water Wattage 21.000m3/day
Highest capacity  
Waste water treatment system Wattage 4.000m3/day
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE: 
Land Land rents 35 USD
Lease term 50 years
Type/Grade Level A
Payment methods Yearly
Deposit 10%
Minimum area N/A
Workshop $5
Management fee Management fee 0.3USD/m2
Payment methods 12 months
Giá điện Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Supplier EVN
Clean water price Water price 0.4 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.28 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A (QCVN 40:2011/BTNMT)
Other fees Insurance (yes)
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook