Nam Cam Industrial Park is located in Nghi Loc district, which is convenient in terms of infrastructure and convenient transportation. 18 km from Vinh city to the North; 012m from Vinh airport; located on both sides of National Highway 1A, with North-South railway running through, Nam Cam provincial road connecting National Highway 1A with Cua Lo seaport.
OVERVIEW OF NAM CAM INDUSTRIAL PARK – NGHE AN
Nam Cam Industrial Park is located in Nghi Loc district, which is convenient in terms of infrastructure and convenient transportation. 18 km from Vinh city to the North; 012m from Vinh airport; located on both sides of National Highway 1A, with North-South railway running through, Nam Cam provincial road connecting National Highway 1A with Cua Lo seaport.
GEOGRAPHICAL LOCATION
Located on both sides of National Highway 1A, with North-South railway running through, Nam Cam provincial road connecting National Highway 1A with Cua Lo seaport.
- Distance to the nearest big city:: 18 Km from Vinh city to the North
- Distance to the nearest airport: 12 km from Vinh airport
- Distance to the nearest railway station: 17 km from Vinh station and 2 km from Quan Hanh station
- Distance to the nearest seaport: 8 km from Cua Lo seaport
THE INFRASTRUCTURE
- Transportation System
The internal traffic system has a width of 22.25m - 43.0m in connection with the external traffic network such as National Highway 1A; Nam Cam - Cua Lo street; North-South railway
- Electricity
The electricity capacity of the whole industrial park is 21.5 MVA. The temporary power source is supplied from the 110/35/22 KV station of the Lo. It is expected to invest in building 110/35/22 KV transformer station (2x40 MVA)

- Water
The water source is taken from Vinh city's water plant and brought to the industrial park by a Φ500 pipeline, using a level II pumping station with a capacity of Q = 17,500 m3 /day and night to supply it to the industrial pipeline network.
- Wastewater treatment
Wastewater is treated locally in each Factory, Enterprise (reaching C-TCVN 5945-195), then follows a separate pipe leading to the common treatment area of the Industrial Park with a capacity of 2x2,000m3/day and night. When treated to meet environmental standards (level B - TCVN 5945-195), it is pumped to the conditioning reservoir and then drained into the Cam River in each basin.
- Communications
There has been a system of optical cable lines and wired lines going through; The national microwave column is 3 km from the industrial park. Nam Cam Post Office right next to the industrial park
- Other information
Providing services on: accommodation, health care, commerce, schools...
AREA & CURRENT CONDITION
- Total planning area: 327.83 (ha)
- Area available for rent: 79 (ha)
- Compensation for site clearance and infrastructure construction: Nghe An Industrial Park Development Company is responsible for compensation, site clearance, demining, demining, leveling and completing infrastructure.
- Minimum rental area: 0 (m2)
INVESTMENT INCENTIVES
- Corporate income tax (Decree No. 218/2013/ND-CP): Enterprise income tax exemption for 02 years and 50% reduction of payable tax amount for the next 4 years when investors invest in an industrial park
- VAT exemption: For enterprises that are granted investment certificates, which are EPE export processing enterprises.
INVESTMENT COSTS
- Land lease: USD/m2
- Normal hours: 814d/kWh peak hour: 1,648d/kWh
- Factory rental: 30 USD/m2
- Electricity price: Electricity price: According to the price of EVN
- Water price: According to current regulations of the Provincial People's Committee
- Waste water treatment fee: According to the regulations of the Provincial People's Committee and the Management Board of the Industrial Park
- Management fee: According to the regulations of the Provincial People's Committee and the Management Board of the Industrial Park.
Some enterprises in the Industrial Park:
- OMYA Minerals Vietnam Co., Ltd
- Central Tien Phong Youth Plastic Co., Ltd
- PHIHICO Forest Products Processing and Trading Joint Stock Company
- Nhat Viet Nghe An Logistics Joint Stock Company
Our services:
Through many years of experience in consulting land law, and surveying, working together with industrial park management boards, foreign investors in industrial parks, we provide a total service package for Domestic and foreign investors in industrial zones nationwide include:
• Consulting on land and real estate law
• Surveying services, factory visits, industrial park land
• Legal service for business license, investment certificate in Vietnam
• Legal consulting services: Drafting, Negotiation, Contract Signing
• Notarization services, authentication, deposit support, bank loans.
| Category |
Detail |
| OVERVIEW: |
| Infrastructure investors |
Nghe An Infrastructure Development Investment Construction One Member Co., Ltd |
| Location |
Nghi Xa Commune, Nghi Loc District, Nghe An Province |
| Acreage |
total area |
327 |
| Factory land area |
|
| Space available |
|
| The percentage of trees |
|
| Operating time |
2004 |
| Current Investor |
|
| Main job |
Mechanical processing, yarn, textile, dyeing, garment, electrical, electronic, pharmaceutical, food processing, food processing, woodworking, packaging printing |
| Occupancy |
100% |
| LOCATION & DISTANCE: |
| Road |
18 km from Vinh city |
| Air |
12 km from Vinh airport |
| Train |
17 km from Vinh station, 2 km from Quan Hanh station |
| Seaport |
8 km from Cua Lo seaport |
| INFRASTRUCTURE: |
| Geological |
Hard soil: 1,5-2,5kg/cm2 |
| Internal traffic |
Main road |
Width: 43m, Number of lane: 4 lanes |
| Side branch road |
Width: 22.5 m, Number of lane:2lanes |
| Electricity supply |
Voltage |
Power line: 110/35/22 KV |
| Power capacity |
2x40 MVA |
| Clean water |
Wattage |
|
| Highest capacity |
17500 m3/day and night |
| Waste water treatment system |
Wattage |
2x2000m3/day and night |
| Internet and telecommunications |
ADSL, Fireber & Telephone line |
| LEASING PRICE: |
| Land |
Land rents |
65 USD |
| Lease term |
2054 |
| Type/Grade |
Level A |
| Payment methods |
12 months |
| Deposit |
10% |
| Minimum area |
1ha |
| Workshop |
$3 |
| Management fee |
Management fee |
0.4 USD/m2 |
| Payment methods |
yearly |
| Electricity price |
Peak |
0.1 USD |
| Normal |
0.05 USD |
| Idle |
0.03 USD |
| Payment methods |
Monthly |
| Supplier |
EVN |
| Clean water price |
Water price |
0.4 USD/m3 |
| Payment methods |
Monthly |
| Water supplier |
Charged by Gov. suppliers |
| Wastewater fee |
Price |
0.28 USD/m3 |
| Payment methods |
Monthly |
| Water quality before treatment |
Level B |
| Water quality after treatment |
Level A (QCVN 40:2011/BTNMT) |
| Other fees |
Yes |