Hoang Mai 1 Industrial Park was approved by the Prime Minister with the orientation of construction planning for Nam Thanh - Bac Nghe region and is one of the industrial parks recorded in the list of priority industrial zones for development.
On February 26, 2021, the Prime Minister issued Decision No. 276/QD-TTg on investment policy of Hoang Mai 1 Industrial Park project, Hoang Mai town, Nghe An province for Hoang Thinh Dat Joint Stock Company. In March 2021, the People's Committee of Nghe An province issued Decision No. 923/QD-UBND approving the overall adjustment of the construction subdivision planning at the rate of 1/2000 of Hoang Mai I industrial park, Hoang Mai town. Accordingly, the area is reduced from 289.67 to 264.77ha.

Hoang Thinh Dat Joint Stock Company with a total project investment capital of 750 billion VND, will complete damaged and degraded basic construction works and unfinished works in Hoang Mai 1 Industrial Park with completion time. expected in 12 months. Previously, in August 2017, Hoang Thinh Dat Joint Stock Company was approved by Nghe An Provincial People's Committee and allowed this unit to buy back properties on land from Hoang Mai Industrial Park Investment Joint Stock Company to deploy infrastructure construction. project, and enjoy preferential policies as a new investor for this project.
Hoang Mai 1 Industrial Park is one of the key industrial park infrastructure projects of Nghe An province, located in the Southeast economic zone. The goal of this industrial park will be to attract high-tech projects. Hoang Mai Industrial Park has a very convenient traffic location, from here it is easy to quickly access seaports, road ports and airports, thus saving a lot of transportation costs and time, especially. especially the cost of importing and exporting goods.
With an abundant source of young workers and bordering Thanh Hoa province, when investing here, investors not only have favorable conditions in recruiting and training workers, but also can save costs. labor and enjoy services at cheap prices.
.jpg)
Up to now, the Hoang Mai 1 industrial park project is in the stage of completing the entire construction infrastructure and is attracting a large number of investors to the industrial park.
Hoang Thinh Dat Joint Stock Company has successfully attracted Juteng International Group (Taiwan) and ancillary businesses to invest in the project of a factory producing electronic product components and Juteng auto parts in Vietnam. Hoang Mai Industrial Park 1. With a land lease area of 180 hectares and a total investment of up to 500 million USD, this is identified as a key project, a lever, creating a premise for the development of Hoang Mai Industrial Park. Hoang Mai town in particular and Nghe An province in general.
It is expected that in March 2022, the project will start construction and by September 2022, complete construction, equipment installation, trial production; From October 2022, the project will officially go into production with the first orders. After the project comes into operation, it promises to create jobs for thousands of local workers and contribute thousands of billions of dong to the provincial budget every year.
Hoang Mai 1 Industrial Park is located along National Highway 1A, so it has a very convenient traffic location, from here it is easy to quickly access seaports, road ports and airports, thus saving a lot of costs. shipping costs and time, especially the cost of importing and exporting goods.

Hoang Mai Industrial Park 1, Nghe An Province
Internal traffic
Main road system with 67m wide road strip, 4 concrete lanes. Secondary road system with 30m wide road strip, 2 lanes paved with asphalt.
Power system
Power is taken from 2 dedicated 22KV power transmission lines from Cua Lo substation, with a capacity of 65 MVA. 110kv power transmission line will be provided by EVN upon request.
Public lighting system
The road lighting power network is designed separately from the domestic power supply system, arranged along the traffic roads.


Water system
Water supply 5,000-20,000 m3/day-night (expandable). Standard water supply: 30 m3/hectare/day. Water source from Cam River. Water is provided by JSC WHAUP Nghe An.
Rainwater drainage system
The rainwater drainage system is separate from the wastewater drainage system. All rainwater will be discharged into the drainage channel of the industrial park.
The 4.3m high anti-flood dike is equipped with a drainage pump system. Internal drainage system, sewer system and water pipes receive discharge from the land.
Process rubbish
Solid waste in the industrial park will be gathered to the transfer station, where the solid waste is classified at the source and then transported to the treatment area.
Wastewater treatment
Primary and secondary aeration pools (AL) and artificial wetland systems with a capacity of 3,200-9,000 m3/day-night (expandable). Wastewater treatment is provided by WHAUP Nghe An Joint Stock Company.
Communication systems
Telephone line system with stable signal. Fiber optic network with high speed internet connection. Wireless network with a variety of mobile service packages.
Hoang Mai 1 Industrial Park mainly attracts industries such as:
Mechanical assembly industry
Steel manufacturing industry
Precision mechanical industry
Wood processing industry
Spare parts manufacturing industry for manufacturing and service industries
Construction materials industry, production of construction semi-finished products
Agro-forestry-mineral processing industry
Footwear manufacturing industry
Hoang Mai Industrial Park 1 is located in Hoang Mai town, Nghe An province, in area III. Therefore, the minimum wage in Region III is currently 3,430,000 VND/month.
Social infrastructure of Hoang Mai 1 industrial park, Nghe An province
Customs services: Nghe An province's customs clearance station is near the industrial park, helping businesses easily carry out import and export customs procedures, sealing, lead clamping...
Banks: branches of BIDV, Agribank, Techcombank, Sacombank,...
Post office: with a modern information technology system serving multi-service communication such as data transmission, telephone, industrial park internet, and video conferencing, etc.
Buses: there are full intra-provincial buses and other buses outside the province…
Fire prevention and fighting: The industrial park is installed with a warning, prevention and fire fighting system in strict compliance with national regulations. Fire hydrants are installed at the internal traffic hubs, and at all factories to ensure effective protection of the whole area from fire and explosion incidents.
Security: 24/7 security service.
Accommodation: Hoang Mai 1 Industrial Park is close to a busy residential area, so it meets the needs of accommodation and living for employees of the Industrial Park.
Hospital: In the town, there is Quynh Lap CA 1 Central Willow-Investment Hospital in the town, serving patients in the northern region located in Quynh Lap commune. Facility 2 general medical examination and treatment located in Quynh Thien ward, this is a prestigious medical facility, with modern equipment, is the only central hospital in Nghe An province.
Advantages of transport infrastructure
Hoang Mai 1 Industrial Park has a very convenient traffic location, from here it is easy to quickly access seaports, road ports and airports, thus saving a lot of transportation costs and time. especially the cost of importing and exporting goods.
Abundant source of labor
Because it is located in Hoang Mai town and adjacent to the border of Thanh Hoa province with an abundant source of young workers, investors here not only have favorable conditions in recruiting and training workers but also can save labor cost and enjoy services with cheap price.