Tan Ky Industrial Park is located in the northwest of Tan Ky district, in the territory of Tan Xuan, Tan Phu and Nghia Thai communes. The detailed construction planning of Tan Ky industrial zone was approved by the People's Committee of Nghe An province in Decision No. 4100/QD-UBND dated October 4, 2011.

According to the plan, Tan Ky industrial park has an area of 600ha. This is a modern, multi-industry industrial park, including agricultural, forestry, mineral processing, construction material production, mechanical assembly, chemical industry, etc., built in a synchronous manner. technical infrastructure and environmental requirements. When the project is completed, it will create a great impetus to promote socio-economic development of Tan Ky district and Nghe An province.
Currently, the industrial park is looking for infrastructure investors.
Tan Ky Industrial Park is located on national highway 48A, with provincial road 545 passing through the industrial park for nearly 2km; easy traffic.

Industrial Park (IZ) Tan Ky - Nghe An
Infrastructure of Tan Ky Industrial Park - Nghe An
Internal traffic
The intersections are designed with round nodes, connecting with provincial road 545, including the main trunk road 61m wide; 37m wide inter-regional main road; internal road, 17m wide branch road.
Power system
Power is taken from the 110KV line through Nghia Dan district (about 20km away), in the industrial park, to build a 110/22KV-(1×40+1×25) MVA distribution station to supply power to the fences of houses. machine.
Public lighting system
The road lighting power network is designed separately from the domestic power supply system, arranged along the traffic roads.
Water system
The water supply for the industrial park is taken from Song Con water source, through the level I pumping station system (capacity of 44,000 m3/day-night) to the industrial park water treatment plant to supply water to the foot of the fence of the industrial park. factory serving production and daily life.
Rainwater drainage system
The rainwater drainage system is separate from the wastewater drainage system. All rainwater will be discharged into the drainage channel of the industrial park.
Process rubbish
Solid waste in the industrial park will be gathered to the transfer station, where solid waste is classified at the source and then transported to the treatment area daily.
Wastewater treatment
Domestic and production wastewater, after being treated locally at the factories, is discharged into the common wastewater system of the industrial park, then collected and transported to 02 wastewater treatment stations of the industrial park for processing. treatment when discharged into the environment, including: treatment station No. 1 (capacity of 15,160 m3/day-night) serving the west-southwest area of the industrial park; Treatment station No. 2 (capacity of 15,160 m3/day-night) serves the East - Southeast area of the industrial park.
Communication systems
Through the connection system between the communication center of the industrial park, all communication needs are guaranteed and are capable of providing all necessary services such as a private switchboard, international telephone, conference calls, etc. remote discussion, leased line, high speed internet, email, etc.
Tan Ky Industrial Park mainly attracts industries such as:
Processing agricultural, forestry and mineral products
Production of building materials and industry
Producing consumer goods such as textiles, leather
Chemistry
Labor costs
Tan Ky Industrial Park is located in Tan Ky district, Nghe An province, in area IV. Therefore, the minimum wage in Region IV is currently 3,070,000 VND/month.
Social infrastructure of Tan Ky Industrial Park - Nghe An
Customs services: Nghe An province customs clearance station near the industrial park; help businesses easily carry out import and export customs procedures, sealing, lead clamping ...
Banks: branches of BIDV, Agribank, Oceanbank, Techcombank, Sacombank,...
Post office: with a modern information technology system serving multi-service communication; such as data transmission, telephone, IP internet, and video conferencing, etc.
Buses: there are full intra-provincial buses and other buses outside the province…
Fire prevention and fighting: the industrial park has a fire prevention and fighting system up to national standards; fire hydrants are arranged along the industrial park road; (approximately 100-120m/pillar) to ensure fire protection in case of trouble.
Security: 24/7 security service.
Accommodation: The industrial park is near a busy residential area, so it meets the needs of accommodation and living for employees of the industrial park.
Hospital: emergency services, medical examination and treatment, health care are available 24/7.
Schools: there are many professional high schools, vocational training centers; and the system of schools from high school to preschool.
(Note: all above prices are for reference only. Actual prices will be calculated at current time)