Phu Bai Industrial Park was established under Decision No. 1144/QD-TTg dated December 22, 1998 of the Prime Minister; is the first concentrated industrial park to be exploited early and effectively, making an important contribution to the socio-economic development of Thua Thien Hue province. The industrial park has been invested with complete technical infrastructure; having many favorable conditions in terms of traffic and labor; already has a wastewater treatment plant, a bonded warehouse and a place for customs clearance to serve the needs of on-site import and export.
Thua Thien Hue province encourages investors in industrial production and processing in the fields of: processing agricultural, forestry and fishery products, machine manufacturing industry, electronics, informatics, yarn, textile... and products manufactures equipment and spare parts for the above industries.

Phu Bai Industrial Park has attracted many domestic and foreign projects such as: USA, Denmark, Bulgaria, Japan, Korea, China, Italy... to invest in such fields as: yarn, garment. clothing, handicrafts, building materials, ceramics, beverages... Some typical enterprises in Phu Bai Industrial Park: Hanex Hue (korean), Baosteel Can Making Co., Ltd., Kugler International Co., Ltd., …
Phu Bai Industrial Park has a total area of more than 800 hectares in Phu Bai ward, Huong Thuy town, Thua Thien Hue province, about 15 km from Hue city center; next to Phu Bai international airport; located along the National Highway 1A and the North-South railway; 40 km from Chan May deep-water seaport to the south, 15 km from Thuan An seaport to the north.
Power supply:
The industrial park has 2 110/22KV transformer stations with a total capacity of 50 MVA.
Water supply:
D50 water supply pipeline system serving the industrial zone is provided by Phu Bai water plant with a capacity of 15,000m3/day.

Communications:
The telecommunications system, telephone, television, Internet, etc. is convenient, can communicate directly internationally, the ADSL high-speed Internet line has extensive coverage and uses underground cable.
Drainage system:
The drainage system installed along the internal roads can ensure the collection of rainwater and wastewater from factories in Go Dau industrial zone.
The wastewater treatment plant has a capacity of 6,500 m3/day.
Traffic:
Internal traffic: Main road, road width 31m- 54m; internal roads and collection roads, road width: 19.5m
Fire fighting system
There is 01 Fire Department in the IP with 3 fire engines and many fire hydrants on the roads
Coming to Phu Bai Industrial Park, investors will enjoy the general preferential policies of the Government of Vietnam, the preferential policies of the province. Investment procedures will be carried out through a focal point, which is the provincial management board of economic and industrial zones with the "one-stop" and "on-the-spot" mechanism.
Human resources, salary, costs in Phu Bai industrial park
The average salary for unskilled workers is 170 USD/person/month, and for technical workers it is about 250 USD/person/month.
Management costs, electricity, water and wastewater treatment fees are calculated according to the state regulations for Thua Thien Hue province.
Evaluate
Advantage
The industrial park has a convenient location for traffic, near Phu Bai airport, on National Highway 1A Hue - Da Nang.
Complete infrastructure, full services for businesses: banks, customs ..., housing for workers
Thuy An Customs Branch is located in the Industrial Park; has a bonded warehouse convenient for the enterprise's storage
Defect
High land rent, high operating costs
For details, please refer to the data sheet below.
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investors | Industrial Park Infrastructure Development And Investment One Member Company Limited | |
| Location | Phu Bai ward, Huong Thuy town, Thua Thien Hue province | |
| Acreage | total area | 184,96 ha |
| Factory land area | ||
| Space available | ||
| The percentage of trees | ||
| Operating time | 50 years | |
| Current Investor | Some typical enterprises in Phu Bai Industrial Park: Hanex Hue (korean), Baosteel Can Making Co., Ltd., Kugler International Co., Ltd., ... | |
| Main job | processing agricultural, forestry and fishery products, machinery manufacturing industry, electronics, informatics, yarn, textiles, supporting industries...and manufacturing all kinds of equipment and spare parts | |
| Occupancy | 98% | |
| LOCATION & DISTANCE: | ||
| Road | To Hue City: 15 km, To Da Nang City: 70 km | |
| Air | Phu Bai Airport: 5km; Da Nang Airport: 70km | |
| Train | Hue Railway Station: 15 km | |
| Seaport | Danang Seaport: 75km | |
| INFRASTRUCTURE: | ||
| Geological | Hard soil: 1,5-2,5kg/cm2 | |
| Internal traffic | Main road | Number of lane: 4 lanes 54m |
| Side branch road | Number of lane: 2 lanes: 19,5 m | |
| Electricity supply | Voltage | Power line: 110/22KV |
| Power capacity | 2x25 MVA | |
| Clean water | Wattage | |
| Highest capacity | 15.000m3/day | |
| Waste water treatment system | Wattage | 6.500m3/day |
| Internet và viễn thông | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 30 USD |
| Lease term | 50 years | |
| Type/Grade | Level A | |
| Payment methods | 12 months | |
| Deposit | 3 months | |
| Minimum area | 1 ha | |
| Workshop | 4 USD | |
| Management fee | Management fee | 0.19 USD/m2 |
| Payment methods | hàng năm | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Clean water price | Clean water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Wastewater fee | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | ||
| Water quality after treatment | B (theo QCVN 40:2011/BTNMT) | |
| Other fees | Insurance: yes | |