FENG DIEN VIGLACERA INDUSTRIAL PARK – THUA THIEN HUE

Phong Dien - Viglacera Industrial Park was approved by the People's Committee of Thua Thien Hue Province in Decision No. 2854/QD-UBND dated December 31, 2014, the investor unit is Viglacera Corporation - JSC to implement the project "Investment" and building infrastructure business in Phong Dien - Viglacera Industrial Park".

FENG DIEN VIGLACERA INDUSTRIAL PARK – THA THIEN HUE PROVINCE

OVERVIEW OF FENG DIEN VIGLACERA INDUSTRIAL PARK

Legal information

Phong Dien - Viglacera Industrial Park was approved by the People's Committee of Thua Thien Hue Province in Decision No. 2854/QD-UBND dated December 31, 2014, the investor unit is Viglacera Corporation - JSC to implement the project "Investment" and building infrastructure business in Phong Dien - Viglacera Industrial Park". The total area of the Industrial Park is 284.32ha, invested and built into 3 phases, Phase 1 with a total area of 64ha has completed the compensation and clearance work, has been granted a certificate of land use right. November 21, 2016. Phase 2, including 02 phases (phase 1 with a total area of 46.2 ha, phase 2 with a total area of 42.1 ha). Currently, there has been a decision to approve the 42ha plan. Phase 3, including 2 phases, with a total area of 131.42ha. Immediately after being handed over the land of phase 1 and phase 2 of the project, technical infrastructure systems such as roads, rainwater drainage system, wastewater drainage system, electricity and lighting... implemented by the investor and so far these items have been basically completed. Phong Dien-Viglacera Industrial Park is divided into 5 functional subdivisions, including: Operation and Service Center; Factory, warehouse; Technical infrastructure works; Areas for planting trees, water surface; Industrial park wastewater drainage system; Planning area for parking, roads…

Phong Dieu Viglacera Industrial Park is one of the IPs approved by the Prime Minister in the master plan for socio-economic development of Thua Thien Hue province until 2015, with a vision to 2020. This is a multi-purpose mixed-use industrial zone. industry, high technology, towards low-polluting industries such as electricity industry, electronics and information technology, agro-forestry-fishery processing, food and beverage, textile, construction materials , mining and mineral processing.... Currently, the IP has an occupancy rate of 20%.

Geographical location

The industrial park is located in Phong Hoa and Phong Hien communes, Phong Dien town, Phong Dien district, Thua Thien Hue province.

The industrial park is located in a densely populated location, with convenient access to key areas by road, sea, air, rail, and inland waterways. Specifically, Phong Dien - Viglacera Industrial Park has a great advantage in traffic when it is about 37km from Hue City, 28.6km from Hue Railway Station, located near National Highway 1A and North-South Railway, 45km from Phu Bai Airport, by waterway on the highway. O Lau river to the East Sea at Cua Viet is 40km, 40km from Thuan An port, 70km from Chan May deep water port, convenient for businesses to import and export goods. With its existing advantages, Phong Dien Industrial Park - VIGLACERA promises to be an attractive destination for many domestic and foreign investors, especially businesses from Korea, Japan...

INFRASTRUCTURE INFORMATION OF PHONG DIEN VIGLACERA INDUSTRIAL PARK

The industrial park is invested methodically, synchronously and modernly, ensuring basic infrastructure conditions for businesses to operate and produce.

Regarding the internal traffic system, the industrial park is designed with main and internal roads, with the width of the main road 35m, the width of the internal axis 16.5m. The roads are designed in the form of a checkerboard to ensure easy access to each plot of land.

Regarding the power supply, the power is supplied from the national grid through an intermediate substation 110/22KV-40MVA, the power line system is fully invested to ensure connection to each factory in the industrial park. .
Regarding water supply, Phong Dien - Viglacera industrial park is designed with a water supply with an expected capacity of 11,000m3/day to serve businesses in the industrial park. The water supply network ensures supply to the fences of businesses.

Regarding wastewater treatment, the IP is designed with two separate drainage systems for industrial wastewater and rainwater. Rainwater automatically flows into the collection wells through the system of ditches leading to the river. Currently, the industrial park has completed the construction of a centralized wastewater treatment station with a capacity of 8,500m3/day.

Regarding the telecommunications system, telephone lines and ADSL are ready to be provided and connected to each enterprise. Internet services are provided by leading domestic network operators, ensuring the quality of transmission lines for manufacturing enterprises in industrial zones.0

RENTAL COSTS AND INVESTMENT INVESTMENT INVESTMENTS

Rental costs

- Infrastructure rental price: 30-35 USD/m2 (land lease term until 2064)

- Infrastructure management and maintenance fee: 0.4 USD/m2/year

- Annual raw land rent: apply the rate prescribed by the People's Committee of Thua Thien Hue province

- Electricity price: From 0.03 USD/kWh - 0.1 USD/kWh depending on the time of using electricity

- Water supply price: 0.4 USD/m3

- Waste water treatment fee: $0.28/m3 (wastewater volume is calculated as 80% of water consumption)

Investment incentives
Regarding corporate income tax, because it is located in an area with difficult socio-economic conditions. Investment projects in industrial parks will enjoy great corporate income tax incentives:

Specifically:

+ Tax rate: Preferential tax rate of 17% for 10 years

+ Exemption from rent for the first 2 years, 50% reduction of payable tax for the next 4 years

+ Time of application: From the first year of generating taxable revenue or from the fourth year of operation, whichever comes first

Regarding import tax, enterprises are exempt from import tax on goods creating fixed assets for the project, including: Equipment, machinery; Specialized means of transport in the technological chain and means of transporting workers; Components, details, separate parts, spare parts, jigs, molds, accessories accompanying specialized equipment, machinery and means of transport; Raw materials and supplies used to manufacture equipment and machines in technological lines or to manufacture components, details, separate parts, spare parts, jigs, molds and accessories accompanying the equipment , machines; Construction materials cannot be produced domestically.

Category Detail
OVERVIEW: 
Infrastructure investors Viglacera Corporation- JSC
Location Phong Dien Industrial Park, Phong Dien District, Thua Thien Hue Province, Vietnam
Acreage total area 284 ha
Factory land area  
Space available 80%
The percentage of trees >15%
Operating time 50 years
Current Investor SCAVI HUE COMPANY, GAPADENT COMPANY LIMITED
Main job industry of electricity, electronics, information technology, agro-forestry-fishery processing, food and beverage, textiles, construction materials, mining and mineral processing....
Occupancy 20%
LOCATION & DISTANCE: 
Road Cách thành phố Huế 37km
Air Cách sân bay Phú Bài 45km
Train Cách ga Huế 28,6km
Seaport Các cảng biển Chân Mây 70km, Cách cảng Thuận An 40km
INFRASTRUCTURE: 
Geological Đang cập nhật
Internal traffic Main road 35m (4 làn)
Side branch road 16,5 m (2 làn)
Electricity supply Voltage 110/22KV
Power capacity 40MVA
Clean water Wattage 11.000m3/ngày đêm
Highest capacity Đang cập nhật
Waste water treatment system Wattage 8,500m3/day and night
Internet and telecommunications ADSL, Fireber
LEASING PRICE: 
Land Land rents 30-35 USD/m2
Lease term 2064
Type/Grade Đang cập nhật
Payment methods Đang cập nhật
Deposit Đang cập nhật
Minimum area 1ha
Workshop Factory rental price  
Lease term  
Type/Grade  
Payment methods  
Scale of factory  
Deposit  
Minimum area  
Management fee Management fee 0.4 USD/m2/năm
Payment methods Hàng năm
Payment methods Peak 0.1 USD/kWh
Normal 0.05 USD/kWh
Idle 0.03 USD/kWh
Payment methods Hàng tháng
Supplier EVN
Clean water price Water price 0.4 USD/m3
Payment methods Hàng tháng
Water supplier Đang cập nhật
Wastewater fee Price 0.28 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A (QCVN40:2011/BTNMT)
Other fees Updating
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook