GIANG DIEN INDUSTRIAL PARK - DONG NAI

Giang Dien Industrial Park is invested by Industrial Park Development Corporation (Sonadezi) with a scale of 529.2 hectares in the southern key economic region - Southeast region. Giang Dien Industrial Park is planned synchronously in terms of infrastructure and facilities and is divided into zones according to each subject, creating convenience for investors.

OVERVIEW OF GIANG DIEN INDUSTRIAL PARK - DONG NAI

Giang Dien Industrial Park is invested by Industrial Park Development Corporation (Sonadezi) with a scale of 529.2 hectares in the southern key economic region - Southeast region. Giang Dien Industrial Park is planned synchronously in terms of infrastructure and facilities and is divided into zones according to each subject, creating convenience for investors. Accordingly, the project will have a dedicated area for small-medium enterprises, an area for businesses of the same nationality and an area for large corporations.

GEOGRAPHICAL LOCATION

Located right next to the city. Bien Hoa and the gateway to the city. Ho Chi Minh City, Giang Dien Industrial Park has become a "golden spot" to attract investment for many years. In addition, the most notable advantage of Giang Dien industrial park is that it is located near many ports such as: ICD Bien Hoa port, Go Dau port, Phuoc An port, Tan Cang Cat Lai and Phu My port.

Soil conditions: Hilly soil, gray soil, hard ground; Soil load 2.5 kg/cm2

Altitude above sea level: 42.8 m – 54.5 m

Climatic conditions: Average temperature: 25 - 27 °C ; Average humidity: 80% - 82%; Average rainfall: 1,900mm- 2,200mm

Distance to the nearest big city:: 20 km . from Bien Hoa city center

Distance to Provincial Center: 20 km from Bien Hoa city center

Distance to nearest airport: 23 km from Long Thanh International Airport to the South; About 49 km from Tan Son Nhat International Airport (HCMC)

Distance to the nearest railway station: About 25 km from Bien Hoa station.

Distance to the nearest river port: 36 km . from Go Dau B Port

Distance to the nearest seaport: 48 km from Cat Lai Port (HCMC); 47 km . from Phu My Deep Water Port (Tan Thanh - Ba Ria)

THE INFRASTRUCTURE

Transportation System

Main trunk system: Maximum width 17m, 4 lanes Internal traffic system: Maximum width 7.5m, 2 lanes

Electricity: 110 KV

Water

Water volume: 15,000 m3/day

Wastewater treatment

Factory standard: QCVN 40:2011/BTNMT, column A, kq=kf=0.9 Maximum treatment capacity (m3/day): 12,000 m3/day Current wastewater treatment capacity (m3/day ): 7,500 m3/day

Process rubbish

There is no waste treatment plant

System of fire

There is a fire fighting water supply pipe system to each land area and equipped with fire protection equipment for the whole industrial park.

Communications

Internet: The communication system for Giang Dien Industrial Park - Trang Bom district will be a telecommunications system paired with Dong Nai Telecommunication network

Other information

AREA & CURRENT CONDITION

Total planning area: 529 (ha)

Area available for rent: (ha)

Bare land: 73 hectares; Land with factories: 4 ha; Office: 38 m2

Minimum rental area: 0 (m2)

Occupancy

EXPENSE

Land rental: USD/m2

Rental price: Please contact directly Minimum rental term: Until August 8, 2058 Minimum rental area: 10,000 m2

Factory rental: USD/m2

Rental price: Please contact directly Minimum rental term: 05 years Minimum rental area: 5,000 m2 Factory for sale: Please contact directly

Management fee: 0.75 US$/m2/year

Electricity price

Peak hours: 2,983 VND/kWh Normal hours: 1,640 VND/kWh Off-peak hours: 1,019 VND/kWh Other information: Electricity prices change based on updated regulations on electricity prices of Dong Nai Provincial People's Committee new

Water price

Clean water price: 11,500 VND/m3 Other information: Clean water price provided changes based on regulations on water prices of Dong Nai Provincial People's Committee

Cost of wastewater treatment

Water treatment price (m3): $0.32/m3 (VAT not included). The wastewater treatment fee may be increased depending on the concentration of substances in the wastewater. Input processing standard: Please

Solid waste treatment fee

Corporate income tax incentives

- Tax rate: 20% for 10 years from the first year the project generates revenue, applicable to businesses operating in industrial parks established according to Government regulations (Article 15, Decree No. 218/ 2013/ND-CP and Appendix II, Decree No. 118/2015/ND-CP). + Corporate income tax incentives for businesses operating in industrial zones: 100% tax exemption for the first 2 years and 50% reduction for the next 4 years (Clause 3, Article 20 of Circular No. 78/2014 /TT-BTC and Decree No. 12/2015/ND-CP). - Tax rate of 10% applied for a period of 15 years (Article 19, Circular 78/2014/TT-BTC) applies to newly established enterprises from investment projects in the following fields: + Product manufacturing software; + High technology as prescribed by law; scientific research and technological development; + Production of supporting industrial products is given priority for development. - Corporate income tax incentives for businesses operating in the above fields: 100% tax exemption for the first 4 years and 50% reduction for the next 9 years.

  Incentives on tax exemption and tax reduction periods: Calculated continuously from the first year the enterprise has taxable income from a new investment project that enjoys tax incentives. In case an enterprise has no taxable income in the first three years, from the first year of revenue from a new investment project, the tax exemption or tax reduction period is calculated from the fourth year of the new investment project. revenue (Clause 4, Article 20 of Circular No. 78/2014/TT-BTC).

Import tax incentives

- Import tax rate: 0% for goods that are machinery, equipment, and specialized vehicles used to create fixed assets; raw materials and supplies to produce exported goods; Construction materials that cannot be produced domestically. - Export tax rate: 0% for goods produced for export.

VAT incentives

- Value Added Tax applies to goods and services consumed in Vietnam and is collected through production, trade and service distribution with applicable tax rates of 0%, 5% and 10%. - A tax rate of 0% applies to the export of certain goods and services, including goods and services provided to industrial zones.

Other offers

Tax incentives for transferring profits abroad: Complete exemption from taxes for transferring profits abroad.

Category Details
OVERVIEW: 
Infrastructure investors Sonadezi Industrial Park Development Joint Stock Corporation
Location Bien Hoa City, Dong Nai Province
Acreage total area 529.2 ha
Factory land area  
Space available  
Ratio of green trees  
Operating time 50 years
Current investors  
Main job Manufacturing high-tech products in telecommunications and information technology; automation; mechatronics and precision mechanics; material; manufacturing biotechnology products; assembling and manufacturing electrical appliances; electronic; Digital devices; Audiovisual equipment…
Occupancy 70%
LOCATION & DISTANCE: 
Road Distance from Ho Chi Minh city center: 44 km, Bien Hoa city: 20 km
Air From Long Thanh International Airport: 22 km, Tan Son Nhat International Airport: 49 km
Train Yes
Sea port Go Dau port: 36 km, Cat Lai port: 43 km, Phu My port: 47 km
INFRASTRUCTURE: 
Geological Hard soil: 1,5-2,5kg/cm2
Internal traffic Main road Number of lane: 4 lanes
Secondary branch road Number of lane: 2 lanes
Electricity supply Voltage Power line: 110/22KV
Source capacity 40 MVA
Clean water Wattage 15000m3/day
Highest capacity  
Waste water treatment system Wattage 10000m3/day
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE: 
Land Land rents 60 USD
Rental term 2058
Type/Class Level A
Payment methods 12 months
Deposit 10%
Minimum area 1ha
Workshop $3
Management fee Management fee 0.4 USD/m2
Payment methods yearly
Electricity price Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Supplier EVN
Price of clean water Water price 0.4 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.28 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A (QCVN 40:2011/BTNMT)
Other fees Yes