Long Giang Industrial Park was established on November 26, 2007 under Investment Certificate No. 532043000007 issued by the Management Board of Industrial Parks of Tien Giang province. The industrial park is planned to be located in Tan Lap 1 commune, Tan Phuoc district, Tien Giang province on a planned land use scale of 540 hectares. The project's investor is Long Giang Industrial Park Development Company Limited (LJIP) with a total investment capital of more than 100 million USD and an operating term of 50 years (From 2007-2057).

Long Giang Industrial Park infrastructure investment project was first approved by the People's Committee of Tien Giang province with a detailed planning scale of 1/2000 in Decision No. 625/QD-UBND dated March 10, 2008 and adjusted. most recently in Decision No. 14/QD-UBND dated January 4, 2019. According to the approved planning, Long Giang Industrial Park has a total area of industrial land for lease of 383.25 hectares (accounting for 70.97%), the construction area of technical works is 13.43 hectares (accounting for 2.49%), the remaining is green area, transportation system and other infrastructure facilities.
In terms of nature, Long Giang Industrial Park is a multi-industry industrial park, which focuses on attracting investment projects in the following industry groups:
- Group 1: Electronics-refrigeration, mechanical assembly industry;
- Group 2: Wood production, equipment production, household goods, rubber industry;
- Group 3: Pharmaceutical, cosmetic, medical equipment, agricultural and forestry product processing industries.
Currently, Long Giang industrial park no longer attracts the construction materials manufacturing industry after the planning adjustment in 2019.
In terms of regional connection, Long Giang industrial park is located adjacent to provincial road DT 866B and near the intersection of Ho Chi Minh City - Trung Luong Expressway, so the industrial park has a traffic connection location. convenient:

- Away from the City Expressway intersection. Ho Chi Minh - Trung Luong 5 km
- 15 km from My Tho city center
- 66 km from Ho Chi Minh City center; 67 km from Tan Son Nhat airport
- 75 km from Cat Lai port; 71 km from Long An International Port
Power supply system: Long Giang industrial park was built by the investor with a 110/22kV transformer station system specifically serving the industrial park with a capacity of 3*63 MVA, 22kV wire lines are connected to each plot of land. in industrial parks, ready to connect according to investors' needs. At the same time, the planned industrial park is expected to build new transformer stations in the future when electricity demand increases.

Water supply system: all clean water needs in Long Giang industrial park are guaranteed to be provided by the internal clean water supply and treatment system with a water supply capacity of 10,000 m3/day and night from the water source. underground, capable of expanding to a maximum of 48,000 m3/day and night according to actual water use needs. Water samples are regularly tested to ensure water supply standards follow Vietnam's clean water standards.
Wastewater treatment system: all wastewater produced in the industrial park is collected and treated at a centralized wastewater treatment system with a maximum design capacity of 40,000 m3/day and night.
Internal road system: roads in Long Giang industrial park are arranged in a checkerboard shape and are covered with plastic carpet meeting VNH18-H30 standards. The main roads in the industrial park have a road width of 17.5 m, the branch roads in the industrial park have a roadbed width of 8 m. At the same time, all roads in the industrial park are arranged with landscaped trees on both sides
Other infrastructure facilities: Communication system with 4000 lines, rainwater and domestic wastewater drainage systems are arranged independently of the production wastewater drainage system; fire prevention and fighting system; Public parking system, landscape trees...
Inland waterway wharf: investors operating in Long Giang industrial park have many favorable conditions in transporting goods through the inland waterway wharf system right inside the industrial park, directly connected to My Tho port. (15 km), Saigon port, Hiep Phuoc port (50 km), Bourbon port (35 km). The cargo loading dock of Long Giang Industrial Park is capable of handling 6 barges at the same time with a capacity of 600 tons/unit.
Infrastructure rental fee: 150 USD/m2/entire lease term (until 2057). The rental price may vary depending on the location and area of the land being rented.

Infrastructure management and maintenance fee: 0.03 USD/m2/month (equivalent to 0.36 USD/m2/year)
Annual land rent: applied according to the decision of the People's Committee of Tien Giang province at each time.
Electricity supply price: applied according to EVN's electricity supply tariff (reference from 1,007-2,871 VND/KWh)
Water supply price: 8,190 VND/m3, unit price may change from time to time
Wastewater treatment fee: depends on the quality of incoming wastewater. The current reference level is from 0.3 - 0.5 USD/m3, the amount of wastewater is determined to be 80% of the amount of clean water used.
Note: the above prices do not include VAT and are subject to change without prior notice
Investment incentives in Long Giang Industrial Park:
Regarding corporate income tax: investment projects are subject to a preferential rental rate of 10% for the first 15 years of the project. At the same time, 100% corporate income tax exemption for the first 04 years and 50% corporate income tax reduction for the next 09 years.
Regarding import tax: import tax exemption for goods on the list of incentives that are imported to create fixed assets for businesses.
In addition, investors in Long Giang industrial park are also supported by the investor with procedures for applying for investment project licenses and establishing businesses, including cases of establishing export processing enterprises. At the same time, with a population of 1.8 million people, investors also benefit from an abundant labor source.
Currently, Long Giang Industrial Park has completed infrastructure construction and leased out about 74% of the entire area with more than 50 investment projects from China, Korea, Japan, Singapore, Taiwan, and Malaysia. . Typical projects include the copper tube production project of HAILIANG Vietnam Company (China) with an investment capital of more than 55 million USD, and the household appliance production project of Lock&Lock (Korea). with an investment capital of 75 million USD, electric cable production project of NISSEI ELECTRIC (Japan), Animal feed production project of Sunjin (Korea), Plastic packaging production project of Yongfeng (China )...and many other projects in the mechanical, household appliances, handicrafts, and food industries.
For all land rental requests in Long Giang Industrial Park, please contact KLAND using the contact information below!
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | Long Giang Industrial Park Development Company Limited | |
| Location | Tan Lap 1 commune, Tan Phuoc district, Tien Giang province, Vietnam | |
| Acreage | total area | 540 ha |
| Factory land area | 383,25 ha | |
| Vacant area | 88 ha | |
| Ratio of green trees | 10% | |
| Operating time | 50 years | |
| Current investors | 53 Investors: HAILIANG (VIETNAM) COPPER MANUF.CO.,LTD (China), UNI-BRAN EDIBLE OILS CO., LTD, LOCK | |
| Main job | Electricity, electronics, refrigeration, assembly of electronic and telecommunications equipment systems; Mechanical and assembly industries. wood production, high-end handicrafts, pharmaceutical production, cosmetic chemicals, optical instruments, medical equipment; Agricultural, product, food and beverage processing industries | |
| Occupancy | 74 % | |
| LOCATION & DISTANCE: | ||
| Road | 66 km from Ho Chi Minh City center; Distance from City Expressway intersection. Ho Chi Minh - Trung Luong 5 km; 15 km from My Tho city center | |
| Air | 67 km from Tan Son Nhat airport | |
| Train | ||
| Sea port | 75 km from Cat Lai port; 71 km from Long An International Port | |
| INFRASTRUCTURE: | ||
| Geological | Hard soil: 1,5-2,5kg/cm2 | |
| Internal traffic | Main road | 4 làn xe |
| Secondary branch road | 2 làn xe | |
| Electricity supply | Voltage | Power line: 110/22KV |
| Source capacity | 2*63 MVA | |
| Clean water | Wattage | 10,000m3/day and night |
| Highest capacity | 48,000m3/day and night | |
| Waste water treatment system | Wattage | 40,000 m3/day and night |
| Internet and telecommunications | ADSL, Fireber | |
| LEASING PRICE: | ||
| Land | Land rents | 150 USD |
| Rental term | 50 năm | |
| Type/Class | Level A | |
| Payment methods | theo năm | |
| Deposit | 0.1 | |
| Deposit | 1ha | |
| Workshop | 3 | |
| Management fee | Management fee | 0.36 USD/m2 |
| Payment methods | năm | |
| Electricity price | Peak | 0.11 USD |
| Normal | 0.067USD | |
| Idle | 0.04USD | |
| Payment methods | hàng tháng | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.5 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.32USD/m3 |
| Payment methods | hàng tháng | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A (QCVN 40:2011/BTNMT) | |
| Other fees | Have | |