Dong Hoi Industrial Park in Nghe An Province is one of 10 key industrial zones in Nghe An province. With the expectation of being a place to attract investors, improve local economic and social life. Bringing job opportunities for employees with stable income.
Dong Hoi Industrial Park is located in Quynh Lap and Quynh Loc communes of Hoang Mai town, Nghe An province. The investor of Dong Hoi industrial park infrastructure construction was initially Nghe An Petroleum Construction Joint Stock Company, then the province decided to replace the infrastructure investor as Vietnam investment partners - VIP Co., Ltd. Dong Hoi Industrial Park has an area of 457.07ha, designed synchronously and modernly with a large internal traffic system, large green area, electricity, water supply and drainage in Dong Hoi industrial park in accordance with national standards. Flexible land plots, suitable for many types of factories.
Dong Hoi Industrial Park has favorable natural conditions to build a deep-water port capable of receiving ships with a tonnage of 1-3 thousand tons. Dong Hoi Industrial Park associated with Dong Hoi seaport system has been approved by the Ministry of Transport with detailed planning in Decision No. 838/QD-BGTVT dated April 28, 2011.
This is also a favorable area for the development of thermal power industry, metallurgy, cement and other ancillary industries, due to its association with the seaport in combination with Nghi Son oil refinery, cement factory. Hoang Mai metallurgical industrial park Hoang Mai forms the industrial economic cluster of Nam Thanh Bac Nghe.
Currently, Dong Hoi Industrial Park has been basically filled.

Dong Hoi Industrial Park is located in Quynh Lap and Quynh Loc communes of Hoang Mai town, Nghe An province; 5km from National Highway 1A and North-South railway line and near Nghi Son deep-water port, located in the key economic zone of Nam Thanh - Bac Nghe approved by the government.
Internal traffic
Spindle system: 43m; 4-6 lanes. Internal traffic system: the internal traffic network is designed to be complete, coherent and suitable for existing routes of the regional traffic network, internal roads with a width of 13m -60m.
Power system
Using power from Nghe An thermal power plant in Dong Hoi industrial park (phase 1: 1200NW), when the plant comes into operation, it will generate electricity to the national grid, and at the same time supply electricity to the plant and people. reside in the industrial zone.
Public lighting system
The road lighting power network is designed separately from the domestic power supply system, arranged along the traffic roads.
Water system
The industrial park will build a wastewater treatment plant with a capacity of 8,000 m3/day-night. By 2025, the capacity will be increased to 16,000 m3/day-night. The raw water source is taken from Vuc Mau Lake - Khe Lai, through the system. water supply pipes to factories in industrial zones and surrounding residential areas.
Rainwater drainage system
The rainwater drainage system is separate from the wastewater drainage system. All rainwater will be discharged into the drainage channel of the industrial park.
Process rubbish
Solid waste in the industrial park will be gathered to the transfer station, where the solid waste is classified at the source and then transported to the treatment area.
Wastewater treatment
Wastewater is treated locally in factories for cleaning according to TCVN 5945-2005 and then discharged into the wastewater collection system of the industrial park, the wastewater is taken to the centralized wastewater treatment station of the industrial park. , where wastewater continues to be treated up to standard B before being discharged into reservoirs.
Communication systems
Through the connection system between the communication center of the industrial park, all communication needs are guaranteed and are capable of providing all necessary services such as a private switchboard, international telephone, conference calls, etc. remote discussion, leased line, high speed internet, email, etc.

Dong Hoi Industrial Park mainly attracts the following industries:
Thermal power industry
Thermal power auxiliary industry
Cement industry
Ferry shipbuilding industry
Fishing gear manufacturing industry
Seasoning powder processing industry
Mechanical repair industry, mechanical assembly
Manufacture of spare parts and electronic components
Consumer production, handicrafts
Textile industry
Food processing and agricultural products
Labor costs
Dong Hoi Industrial Park is located in Hoang Mai town, Nghe An province, in Region III. Therefore, the minimum wage in Region III is currently 3,430,000 VND/month.
Social infrastructure of Dong Hoi Industrial Park - Nghe An
Customs services: Nghe An province's customs clearance station is near the industrial park, helping businesses easily carry out import and export customs procedures, sealing, lead clamping...
Banks: branches of BIDV, Agribank, Oceanbank, Techcombank, Sacombank,...
Post office: with a modern information technology system serving multi-service communication such as data transmission, telephone, industrial park internet, and video conferencing, etc.
Buses: there are full intra-provincial buses and other buses outside the province…
Fire protection: The industrial park is installed with a warning, prevention and fire fighting system in strict compliance with national regulations. Fire hydrants are installed at the internal traffic hubs, and at all factories to ensure effective protection of the whole area from fire and explosion incidents.
Security: 24/7 security service.
Accommodation: Dong Hoi Industrial Park is near a busy residential area, so it meets the needs of accommodation and living for employees of the Industrial Park.
Hospital: In the town, there is Quynh Lap Central Leprosy - Dermatology Hospital, facility 1; serving patients in the northern region located in Quynh Lap commune. Facility 2 for general medical examination and treatment is located in Quynh Thien ward; this is a reputable medical facility with modern equipment; is the only central hospital in Nghe An province.
Schools: here, each commune and ward has 1 secondary school and 1, 2 primary schools. The town has 2 high schools: Hoang Mai High School and Hoang Mai 2 High School.
Advantages of transport infrastructure
Dong Hoi Industrial Park is about 20km from Cau Giat town to the north, 1km from Hoang Mai station; adjacent to Nghi Son - Thanh Hoa deep-water port, with Dong Hoi port. The industrial zone is 5km from National Highway 1A and North-South railway; not far from Vinh airport and Cua Lo deep-water general port. This is a favorable location for industrial development and freight transportation.
Abundant source of labor
Nghe An province has a population of about 3.2 million people, ranking fourth in the country; in which the labor force is 1.95 million people, accounting for 65% of the province's population; in which the literacy rate (15 years old and above) accounts for 95% of the province's population. Nghe An is famous as a locality with a tradition of being studious and good at studying, industrious and creative; converging many quality universities and vocational schools.
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investors | Nghe An Petroleum Construction Joint Stock Company | |
| Location | Quynh Loc commune - Quynh Luu district - Nghe An province | |
| Acreage | Total area | 600 ha |
| Factory land area | 450,67 ha | |
| Space available | ||
| The percentage of trees | ||
| Operating time | 50 years | |
| Current Investor | Vietnam Cement Industry Corporation, KOBE (Japan), Hoa Sen Nghe An Factory | |
| Main job | Multi-sector: construction and building materials, mechanical engineering, consumer goods production, home appliance manufacturing | |
| Occupancy | 10% | |
| LOCATION & DISTANCE: | ||
| Road | To VInh City: 80 Km to Ha Noi city: 238km | |
| Air | To Noi bai Airport: 250km, Vinh airport: 75km | |
| Train | ||
| Seaport | to Nghi Son Sea Port 12km | |
| INFRASTRUCTURE: | ||
| Geological | K 1,5-2,5 | |
| Internal traffic | Main road | 43m: 4-6 lands |
| Side branch road | 22,25m: 2 lands | |
| Electricity supply | Voltage | Power line: 110KV and /22KV |
| Power capacity | ||
| Clean water | Wattage | 10.000m3 |
| Highest capacity | 80.000m3/day | |
| Waste water treatment system | Wattage | Level B (QCVN 40:2011/BTNMT) |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 30-50 USD |
| Lease term | 50 years | |
| Type/Grade | Level A | |
| Payment methods | 12 months | |
| Deposit | 10% | |
| Minimum area | 1ha | |
| Workshop | $2 | |
| Management fee | Management fee | 0.2USD/m2 |
| Payment methods | Monthly | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Clean water price | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.3 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | C(theo tiêu chuẩn TCVN 5945-2005) | |
| Water quality after treatment | Level B (QCVN 40:2011/BTNMT) | |
| Other fees | Yes | |