AN PHUOC INDUSTRIAL PARK - DONG NAI

An Phuoc Industrial Park - Dong Nai is a project that has been planned, built, and put into use. The scale of the industrial park is over 200 hectares with a large area of land and factories for rent

Overview of An Phuoc Industrial Park - Dong Nai

An Phuoc Industrial Park - Dong Nai is a project that has been planned, built, and put into use. The scale of the industrial park is over 200 hectares with a large area of land and factories for rent. The project is located in an area with great potential, promoting future economic development and has convenient transportation infrastructure to help exchange goods. It can be said that if you want to find an industrial park for production and business, you should not miss this industrial park.

The investor of An Phuoc industrial park is Tin Nghia Corporation. A company that is very famous and has a lot of reputation in this field. Therefore, customers are completely assured about the quality of the project. There is no need to worry about legal and paperwork issues due to forgery.

Name: An Phuoc Industrial Park - Dong Nai

Investor: Tin Nghia Corporation

Total area: 201 hectares

Factory area: 1000m² Land: Minimum land plot:10,000 m2 Factory: Built up area:1,000m2

Address: An Phuoc commune, Long Thanh district, Dong Nai province

Construction density (%): 60 (%)

Some advantages of this project that you should invest in An Phuoc industrial park are:

Infrastructure such as high-end power grid system, internal traffic, services, etc. are fully equipped inside the industrial park. Therefore, customers do not have to worry about insufficient capacity when doing business here.

The project is located in a potential location, convenient for developing connections with neighboring provinces thanks to its proximity to arterial roads of Dong Nai province.

Papers, long-term pink books and legal issues are public and transparent.

The spacious campus and area meet the needs of customers to build factories and workshops to serve production and business.

Location of An Phuoc Industrial Park project

An Phuoc Industrial Park is located in An Phuoc commune, Long Thanh district and Dong Nai province. This location is close to important traffic hubs when in turn adjacent to the neighboring key economic area of Dong Nai province. In particular, Dong Nai province is a place with many favorable transportation conditions when there are roads, railways, airways, and waterways. Thanks to that, when doing business here, it will attract many attractive investors to help create conditions for socio-economic development.

Internal amenities of An Phuoc Industrial Park project

The internal amenities that An Phuoc Industrial Park currently has are as follows:

Spacious two-way traffic, meeting the needs of safe movement of vehicles.

Trees are planted along traffic routes to help create shade and fresh air.

The electrical lighting system helps ensure the production and operation process, and street lights along traffic roads help ensure vehicle traffic is safe at night.

The parking area for workers working here is spacious and guarded by security. The camera system operates 24/24 to help monitor and ensure security.

The dining area and canteen are integrated right into the factory, creating convenience for workers to rest, eat, and take breaks between hours.

External amenities of An Phuoc Industrial Park project

Outside amenities that you can easily access quickly and without taking much time are:

The industrial park is located about 60 minutes by car from the center of Ho Chi Minh City, equivalent to 47km.

30 kilometers to reach Ho Chi Minh City's High-Tech Industrial Park, about 45 minutes of travel

About 40 minutes by car, you will reach the entertainment facilities of Bien Hoa city.

45km away is the large Thi Vai seaport where goods trade in the region is concentrated.

Cat Lai Industrial Park will be 35km from the industrial park.

The industrial park is 45km away from Tan Son Nhat airport.

It takes about 20 minutes by car to reach Long Thanh airport.

Infrastructure of An Phuoc industrial park - Dong Nai

An Phuoc Industrial Park - Dong Nai is invested in extremely modern and convenient infrastructure. Infrastructure such as power supply systems, water supply systems, roads, and communications in An Phuoc industrial park are invested and built ready to serve investment projects.

Internal transportation system

Internal roads are covered with hot asphalt concrete and designed according to Vietnamese standards, load capacity H30, with width from 20m to 40m, meeting the needs of transporting large tonnage container trucks.
All areas in the industrial park are linked to the internal road system, ensuring easy internal circulation.

Power supply
Using national grid power source, voltage level 22KV:
Normal hours: 1,555 VND/Kwh
(From Monday to Saturday: 4:00 a.m. - 9:30 a.m.; 11:30 a.m. - 5:00 p.m.; 8:00 p.m. - 10:00 p.m.; Sunday: 4:00 a.m. - 10:00 p.m.).
Off-peak hours: 1,007 VND/Kwh
(Weekdays: 22:00 – 04:00).
Peak hour: 2,871 VND/Kwh
(From Monday to Saturday: 9:30 am - 11:30 am; 5:00 pm - 8:00 pm).
Unit prices may change according to State regulations.
Water supply
The water source provided ensures the production and living needs of investors.
Dong Nai Water Supply Company Limited, capacity 10,000m3/day and night
Telecommunication
With communication services from VNPT, FPT, Viettel... to meet the needs of customers in industrial parks.
Transmission speed parameters:
ADSL: maximum 8MB/s.
Fiber optic cable: maximum 90MB/s.
Wastewater treatment
Total capacity: 6,000m3/day and night (phase 1 is 2,000m3/day and night)
Wastewater treatment standards of industrial parks: QCVN 40:2011/BTNMT, column A
Wastewater treatment fee: 0.32 USD/m3 (tax not included)
The amount of wastewater is calculated at 80% of the amount of clean water provided.
Category Detail
OVERVIEW: 
Infrastructure investor Tin Nghia Corporation
Location An Phuoc commune, Long Thanh district, Dong Nai province, Vietnam
Acreage total area 201 ha
Factory land area  
Vacant area  
Ratio of green trees 11,9%
Operating time 50 years
Current investors  
Main job Textile dyeing; apparel, footwear; household items made of wood, plastic, aluminum, iron, enamel; mechanical; power electronics; building materials
Occupancy 65%
LOCATION & DISTANCE: 
Road Distance from city center. 47km from Ho Chi Minh City, far from the city's high-tech zone. 29km from Ho Chi Minh City, 20km from Bien Hoa City center,
Air 45km from Tan Son Nhat Airport, 45km from Long Thanh Airport
Train Bien Hoa Station: 10 km, Saigon Station: 50 km
Sea port Cat Lai port: 35 km; Cai Mep Thi Vai port: 45km
INFRASTRUCTURE: 
Geological Hard soil: 1,5-2,5kg/cm2
Internal traffic Main road up to 40m wide: 4 lanes
Secondary branch road 2 lanes
Electricity supply Voltage 110/22KV
Source capacity  
Clean water Wattage 10,000m3/day, night
Highest capacity  
Waste water treatment system Wattage 6000m3/day and night
Internet and telecommunications Communication services of VNPT, FPT, Viettel... meet the needs of customers in industrial parks.
LEASING PRICE: 
Land Land rents 160 USD/m2
Rental term 50 năm
Type/Class Level A
Payment methods linh hoạt
Deposit 10%
Minimum area 1ha
Workshop Factory rental price  
Rental term  
Type/Class  
Payment methods  
Scale of factory  
Deposit  
Minimum area  
Management fee Management fee 1 USD/m2
Payment methods hàng năm
Electricity price Peak 0.1 2USD
Normal 0.067USD
Idle 0.044 USD
Payment methods hàng tháng
Supplier EVN
Price of clean water Water price 0.5 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.32 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A (QCVN 40:2011/BTNMT)
Other fees yes
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook