My Xuan B1 Industrial Park - Dai Duong was approved by the Prime Minister in the General Planning for the development of industrial parks in Vietnam to 2015, with an orientation to 2020 in Decision No. 1107/QD-TTg dated August 21 /2006. On December 1, 2006, the Management Board of Ba Ria Vung Tau Industrial Parks issued the first investment certificate for the infrastructure development and business project of My Xuan B1 Industrial Park - Dai Duong according to the Investment Registration Certificate. number 49221000009.
On July 18, 2007, the People's Committee of Ba Ria - Vung Tau province issued Decision No. 2441/QD-UBND with the content of land recovery to serve the purpose of building My Xuan B1 - Ocean industrial park. However, it was not until November 10, 2011 that the Industrial Park Investor completed planning approval procedures and had the Ba Ria - Vung Tau Provincial People's Committee approve the detailed planning 1/2000 according to Decision No. 2602. /QD-UBND

My Xuan B1 Dai Duong Industrial Park has a planned area of 145.7 hectares, of which a total of 104.79 hectares of industrial land for lease (including warehouse land and public land area). existing business) in My Xuan commune, Tan Thanh district, now My Xuan Ward, Phu My town, Ba Ria Vung Tau province:

+ 12 km from Phu My Port
+ 05 km from Thi Vai Port
+ 20 km from Long Thanh Airport, 70 km from Tan Son Nhat Airport
My Xuan B1 Industrial Park - Dai Duong is planned as a multi-industry industrial park, focusing on attracting industries that do not pollute the environment such as light industry, leather shoes, garments, construction materials, and food. products, beverages, electronic assembly, refrigeration; Light industry and other industries do not pollute the environment.
Power supply system: power produced in My Xuan B1 Industrial Park - Dai Duong is taken from the National grid and from Phu My power plant through 02 transformer stations with a capacity of 110KV/22KV - 40 MVA each. 22KV line is connected to the fence of each factory operating in the Industrial Park
Water supply system: Sourced from Phu My water plant, with water supply capacity of 40,000 m3/day and night

Wastewater treatment system: My Xuan B1 Industrial Park - Dai Duong is invested in building 02 wastewater treatment stations with a treatment capacity of 1,500 m3/day and night each, capable of receiving wastewater treatment. issue column A standards according to Vietnam's environmental technical standards
Industrial gas supply system: Provided and managed by CNG Joint Stock Company, connected depending on the needs of land lessees.
Internal road system: adjacent to National Highway 41, designed with 4 lanes, width from 15m to 28m, sidewalks on each side from 5.5m to 7.5m wide
Infrastructure usage fee: 130 USD/m2/Until December 1, 2056. Infrastructure rental prices may vary depending on the rental time and rental area
Management fee: 0.4 USD/m2/year. May be adjusted upward annually
Wastewater treatment fee: 0.4 USD/m3 for wastewater treated to reach column B, 0.35 USD/m3 for wastewater treated to reach column A
Electricity supply price: According to the electricity price list prescribed by the state
Water supply price: 12,500 VND/m3
Note: The above prices do not include VAT and are subject to change without prior notice
Currently, My Xuan B1 Dai Duong Industrial Park has been leased to occupancy at a rate of about 45%, however, many projects have not yet started construction. Some projects that have been operating in the Industrial Park include the Dong Tien steel factory project, the glass factory project of Nam Viet Hung Company, and the TOTA quartz stone production project.
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | IDICO Petroleum Construction Investment Joint Stock Company | |
| Địa điểm | Tan Thanh, Ba Ria - Vung Tau | |
| Acreage | total area | 145.7 |
| Factory land area | ||
| Vacant area | ||
| Ratio of green trees | ||
| Operating time | 2006 | |
| Current investors | ||
| Main job | ||
| Occupancy | ||
| LOCATION & DISTANCE: | ||
| Road | To Vung Tau City: 45km | |
| Air | To International Airport Long Thanh: 30km | |
| Train | To Station Bien Hoa: 50km | |
| Sea port | To Seaport Go Dau : 2km | |
| INFRASTRUCTURE: | ||
| Geological | ||
| Internal traffic | Main road | |
| Secondary branch road | ||
| Electricity supply | Voltage | 110/22KV |
| Source capacity | 63MVA | |
| Clean water | Wattage | 20.000m3/ngày |
| Highest capacity | 40.000m3/ngày | |
| Waste water treatment system | Wattage | 10.000 m3 /ngày |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 50 USD |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Deposit | ||
| Minimum area | ||
| Workshop | Factory rental price | |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Scale of factories | ||
| Deposit | ||
| Minimum area | ||
| Management fee | Management fee | 0.35 USD/m2 |
| Payment methods | Annual | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Giá nước | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A | |
| Other fees | Insurance: yes | |