Duc Hoa 3 Industrial Park belongs to Duc Hoa district, Long An province - Located adjacent to many suburban districts of Ho Chi Minh City, Duc Hoa has many advantages in attracting investment and economic exchanges. With that condition, in the future, Duc Hoa will be the key industrial development of Long An province, a leading locality in developing industrial parks to attract investment from outside.
.jpg)
Duc Hoa Industrial Park has a total planning area of 1,852 hectares with 13 component industrial park projects. Hong Anh Industrial Park is one of the component industrial parks of Duc Hoa III industrial park:
Duc Hoa 1 Industrial Park, Scale 274 Ha
Xuyen A Industrial Park, Scale 200 Ha
Duc Hoa 3 Industrial Park - Anh Hong, Scale 55 Ha
Duc Hoa 3 Industrial Park - Viet Hoa, Scale 87 Ha
Duc Hoa 3 Industrial Park - Slico, Scale 192 Ha
Duc Hoa 3 Industrial Park - Hong Dat, Scale 100 Ha
Duc Hoa 3 Industrial Park - Resco, Scale 296 Ha
Duc Hoa 3 Industrial Park - Thai Hoa, Scale 100 Ha
Duc Hoa 3 Industrial Park - Minh Ngan, Scale 147 Ha
Duc Hoa 3 Industrial Park - Song Tan, Scale 307 Ha
Duc Hoa 3 Industrial Park - Long Viet, Scale 87 Ha
Duc Hoa 3 Industrial Park - Duc Loi, Scale 40 Ha
Duc Hoa 3 Industrial Park - Cali Long Duc, Scale 200 Ha
Duc Hoa 3 Industrial Park - Lien Thanh, Scale 100 Ha
Duc Hoa 3 Industrial Park - Muoi Day, Scale 137 Ha
Tan Duc Industrial Park, Scale 535 Ha
Duc Hoa Dong Industrial Park, Scale 500 Ha
Thai Hoa Industrial Park, Scale 100 Ha
Tan Do Industrial Park, Scale 209 Ha
Duc Hoa 3 Industrial Park has a convenient location. Located between 3 large residential clusters: Duc Hoa Town, Hau Nghia Town (Long An) and Cu Chi Town (Ho Chi Minh City, Trans-Asia route (5km)
.jpg)
- 38km from Ho Chi Minh City Center
- 32km from Tan Son Nhat International Airport - Ho Chi Minh City
- 42.5 km from Saigon station
- 25km from An Suong bus station
- Ben Luc Long An port, 42 km long, this port can receive ships with a tonnage of 5,000 tons,
- Moc Bai international border gate 48km
The internal traffic system includes 2 lanes, 16m wide, 24 m wide. - The main traffic system includes 4 lanes, 36m wide
Power system: National power grid system - Duc Hoa power line 550KV and existing along Provincial Road 8 and new construction along Thay Cai canal in Viet Hoa Industrial Park.
Clean water supply system: 30,000m3/day
Wastewater treatment system: Capacity: 5,000 m3/day and night (under construction)
Contact information: VNPT Telecommunications Company: Guaranteed to provide telephone, fax, internet... for businesses in Anh Hong industrial park
Some main industries are encouraged to attract investors in Duc Hoa 3 Industrial Park, Long An province
- Paper production, production of wrinkled paper, wrinkled cardboard, production of electrical equipment, electrical and electronic components (not accepting projects to build transmitter stations, transceiver stations, projects to build telecommunications lines) .
- RBS prefabricated house construction materials production project, mechanical processing project, rolling mill, machinery assembly.
- Recycling and solid waste treatment projects.
- Fertilizer production, livestock, poultry and aquatic feed processing.
- Beer and malt production, wholesale projects of food, beverages and tobacco, pipe tobacco and business projects, import-export and alcoholic beverage products.
- Wood processing projects (without cooking and impregnating stages) to produce consumer goods.
- Production of plastic packaging and processed foods.
- Clothing industry.
- BenKan Company Limited
- Tungtex Fashions Company Limited
- Ciibg Eland Vietnam Ltd
- Koda Saigon Company Limited
- Dong Viet Shoes Company Limited
- Dong Tam Concrete Company
- Nutreco International Company Limited
- Ground rental price: 70 USD/m2
- Management fee: 0.05usd/m2/month (maintenance fee, security protection fee...)
- Wastewater treatment fee: 0.4 USD/m3
Some tax incentives and other incentives for investors when establishing new projects in Duc Hoa III industrial park (Anh Hong)
• Tax exemption for 02 years; 50% discount for the next 4 years
• Flexible pricing policy and payment methods.
The internal traffic system includes 2 lanes, 16m wide, 24 m wide. - The main traffic system includes 4 lanes, 36m wide
Power system: National power grid system - Duc Hoa power line 550KV and existing along Provincial Road 8 and new construction along Thay Cai canal in Viet Hoa Industrial Park.
%20(1).jpg)
Clean water supply system: 30,000m3/day
Wastewater treatment system: Capacity: 5,000 m3/day and night (under construction)
Contact information: VNPT Telecommunications Company: Guaranteed to provide telephone, fax, internet... for businesses in Anh Hong industrial park
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | Anh Hong Investment Joint Stock Company | |
| Location | Duc Lap Ha commune, Duc Hoa district, Long An province | |
| Acreage | total area | 55.2416 ha |
| Factory land area | 40.91 ha | |
| Vacant area | 24.42 ha | |
| Ratio of green trees | ||
| Operating time | 2055 | |
| Current investors | Asia Gold Company Limited, Sigma Long An Company Limited, Shinshung Vina Company | |
| Main job | Industrial production has little pollution; high-tech industry | |
| Occupancy | 50% | |
| LOCATION & DISTANCE: | ||
| Road | 40km from Ho Chi Minh City | |
| Air | 35km from Tan Son Nhat international airport | |
| Train | 40km from Saigon station | |
| Sea port | 40km from Saigon port | |
| INFRASTRUCTURE: | ||
| Geological | Hard soil: 1,5-2,5kg/cm2 | |
| Internal traffic | Main road | Number of lane: 4 lanes |
| Secondary branch road | Number of lane: 2 lanes | |
| Electricity supply | Voltage | Power line: 110/22KV |
| Source capacity | ||
| Clean water | Wattage | |
| Highest capacity | 30.000m3/day | |
| Waste water treatment system | Wattage | 5.000m3/day |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 70-80 USD |
| Rental term | 2055 | |
| Type/Class | Level A | |
| Payment methods | 12 months | |
| Deposit | 10% | |
| Minimum area | 1ha | |
| Workshop | $3 | |
| Management fee | Management fee | 0.4 USD/m2 |
| Payment methods | yearly | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A (QCVN 40:2011/BTNMT) | |
| Other fees | Insurrance | |