Factory construction unit price is one of the top concerns for investors when deciding on project investment and selecting construction units for works. BIC Construction Architectural Joint Stock Company would like to share some of the factors affecting the factory construction unit price for investors to refer and give the construction investment fee for their projects.

1. What does the factory construction unit price include?

Factory construction unit price includes all the factors that make up a factory work:

  • Factory building materials
  • Factory construction worker
  • Construction machinery
  • Construction costs and measures
  • Other costs incurred: erecting the shack at the project, electricity and water costs, management and protection of the project...

2. Factors affecting construction unit price of steel frame factory?

Báo giá xây dựng nhà xưởng 2021

a. The function of the factory

What the workshop is used for will determine the appropriate design plan, structure and construction materials such as foundation solution, steel structure option, heat resistant material, covering solution, the accompanying auxiliary items ...

Factory performance is the first and decisive factor determining the cost of building a factory.

For example: A factory only serves as a storage for light goods, the requirements for the factory are not high, but if it is a warehouse for machinery, mechanics or valuable products, the factory floor requirement must be high, to ensure safety, may have to add cranes to serve the lifting and transporting.

If the factory functions to serve the business and production, outside the workshop, there must be other supporting works such as offices, cafeterias, rest houses for staff, employees, garage, warehouse of supplies, product storage…

b. Factory building location

The location and location of the factory construction also has a significant impact on the construction unit cost, which can be attributed to the following factors:

Construction site geology

If the construction site is on a flat, well-geologically located area, it will greatly reduce the cost of the foundation, but if the rebuilding site is on a smooth flowing mud ground, the geology is uncertain. There will be a solution to reinforce the foundation, so the cost will increase.

The construction site is convenient for transportation

For the transportation of materials for construction work or not? Are electricity and water lines available for domestic use and construction? All affect the construction unit price of the work. Because if it is not favorable, it will take a lot of effort to transport materials into the construction.

c. Factory construction scale

Large factory construction scale with construction unit price / m2 will be lower than smaller factory constructions.

With the same structure and material solution, the construction unit price for the factory, but the scale of 1000m2, the workshop is 5000m2 and the workshop is 10,000 m2, the cost is not small difference.

d. Factory model

Factory construction costs for modern style factories with new materials will have higher unit prices than simple, traditional factory building models using cheaper materials.

In addition, some additional details attached to the factory such as ventilation doors, metal shutters, canopy roofs, or windows ... also have a little influence on the cost of building the factory.

e. Factory construction time

The main material used for factory construction here is steel (accounting for 70%), so the factory construction unit price depends heavily on the current steel unit price in the market. There are five steel prices fluctuate up to 100% or 150% so the cost of construction investment in that year can fluctuate 1.7 times. Not a small number at all for investors.

Moreover, the beginning of the year is a suitable time for construction because the weather is very favorable, construction projects are deployed in a rush. While at the end of the year, many projects are running at progress while stormy weather affects the slow construction on the site.

f. Workshop construction progress requirements

The construction process of the steel frame workshop takes place very quickly within 3 - 6 months, depending on the request of the investor, there will be a construction period specified.

Machinery and equipment lines are calculated and purchased by the investor right after completing the construction to prepare for the production process. Sometimes for some reason the construction progress of the factory is pushed up very quickly and requires a very high effort from the contractor, both in terms of manpower, machinery ... and sometimes, the method of organizing the exam is changed construction on site leads to more or less increase in construction unit price.

g. Factory construction contractor

The reality is that there will be different construction unit prices between contractors. Each contractor will have different capabilities and strengths, different assessments and different construction quality, so different quotes will be made. That is normal for someone who is knowledgeable about the factory market.

3. How to optimize the factory construction cost?

Do not be eager for low prices, but forget about quality. Price always comes with quality, so to optimize costs with a good quality to meet the requirements of the investor. That is always a complicated problem for both the contractor and the investor.

To optimize costs, both the investor and the contractor need to pay attention to 2 stages of factory design and construction. The two must be parallel to each other.

Design phase

Presenting coherent architectural design plans, reasonable and accurate structural plans to help investors save costs and working time. A well-designed plan also helps the investor to avoid the costs of repair and improvement, incurred if any happen later.

Báo giá xây dựng nhà xưởng 2021

Factory construction phase

Investors need to pay attention to measures and construction process. If there is a good construction plan, it will save a lot of time and money for both the investor and the construction contractor. This will require a lot of effort, experience and capacity of the general contractor. Therefore, the selection of reputable construction contractors is also very necessary.

 

Báo giá xây dựng nhà xưởng 2021

With experienced factory construction companies, reputable consulting both design issues and construction methods is always a considered choice for the investor. Because they will understand from design to construction. The contract was a Design and Build contract - A company responsible for both design and construction.

4. Unit price for construction of pre-engineered steel buildings in 2021

As mentioned above, there are many factors that affect the unit price of construction. So it is difficult to come up with an exact price, each bidder is offering a different price.

To know more exactly about the factory construction unit price, you should contact directly to get specific advice from professional companies in this field.

You can also contact BIC Construction Architectural Joint Stock Company, we will provide free consultation for you.

 

One of our strong points is thanks to the strong changes in the development of technology. BIC is always aiming for the best and new technologies to meet the diverse requirements in construction, from complex construction techniques to the ability to operate and execute large-scale projects.

Why choose BIC for construction to execute the condominium project?

1. Team of human resources - engineers - architects - workers with extensive experience in executing the condominium project

2. BIC always has enthusiasm and always put the mind - reputation as the top.

3. Construction process is strictly managed and safe.

4. With strict control in construction, the construction schedule should always be ensured.

5. Price is suitable for each project implemented.

6. Free and enthusiastic advice - dedicated.

Please contact BIC at hotline: 09.089.50.546 for a free consultation!

BIC is a company specializing in the design and construction of high-quality factories, pre-engineered steel buildings and industrial warehouses. In addition, BIC also designs and constructs office buildings, condominiums, participates in surveys,....

BIC has participated in many construction projects across the country. We have had many experiences in building large-scale projects of famous investors from countries around the world such as Japan, Korean, Taiwan, America (USA), Singapore, .. ..

The reputation of BIC is increasingly strengthened as we become more and more known by the compliments about the professional, serious, entrepreneurial and honest working attitude. BIC is now a trusted brand for big name investors in Vietnam market.

Benefits of customers:

We have been implementing large-scale factory projects from 70,000 square meters to more than 200,000 square meters of foreign enterprises investing in Vietnam such as: Korean, Japan, Taiwan, .... We more and more efforts to become one of the leading brands in terms of prestige, project implementation capacity in Vietnam, reaching out to markets in countries in Southeast Asia and the World.

BIC is committed to providing customers with the best building service, office building, high-rise apartment building. By the enthusiasm and unrelenting efforts of all officials and employees. Especially, we have conquered many big projects and gained the confidence and satisfaction of the "Big Men" in the world who came to Vietnam to invest in the construction.

BIC is very pleased to serve you with the spirit: "COOPERATE TO DEVELOP TOGETHER"

xây dựng nhà xưởng công nghiệp

 

xây dựng nhà xưởng công nghiệp

 

xây dựng nhà xưởng công nghiệp

 

---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

BIC CONSTRUCTION ARCHITECTURAL JOINT STOCK COMPANY

 Ho Chi Minh Branch: 7th Floor, Gia Dinh group, 566 National Highway 13, P.Hiep Binh Phuoc, Thu Duc District, Ho Chi Minh City
☎️ Hotline:
0901.815.069
Mail:bic@bicons.vn
 Hanoi Branch: 4th Floor, HUD3 Tower, No. 121-123 Pho To Hieu, Ha Dong District - Hanoi.
☎️ Hotline: 0243.91.92.789
Mail: bic@bicons.vn - Fax: (028) 38 800 892

Website: bicons.vn - bicjsc.com

 

RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook