Suoi Tre Industrial Park - Dong Nai is predicted to be an industrial park trusted by many foreign investors with activities in supporting industries and safe, non-polluting design and production industries. with the environment. Priority fields: Textile dyeing, Garment, Footwear; Household appliances made of wood, plastic, aluminum, iron, enamel; Mechanical; Electricity; Electronic; Building materials

50km from Ho Chi Minh City, 42km from Bien Hoa City
40km from Long Thanh international airport
Cai Mep Port 60km
Area: With an area of 150 hectares, designed synchronously and modernly with a large internal traffic system, large green area, electricity, water supply and drainage in Suoi Tre industrial park in accordance with international standards for lots Flexible land, suitable for many types of factories

Term: 50 years (from 2009)
Land legality: Red book
Industrial park orientation: Suoi Tre is oriented as a multi-industry industrial park using modern high technology in accordance with international standards, environmentally friendly, expected to attract occupations such as:
Mechanical assembly, production of spare parts and electronic components
Consumer production, handicrafts
Textile, garment and footwear industry
Food processing and agricultural products and some other industries
Human resources: Dong Nai province has a population of about 3.097 million people, of which the population structure is young. The population under 15 years old is 23.8%. The population of the 15-64 year old group (the main group of the labor force) is 71.16% and the population aged 65 and over is 5.25%.
Infrastructure & utilities:
Landscape: More than 12% of the total area of the industrial park is planted with trees along roads and other areas
Lawns and public green areas are planted to improve the industrial park environment
Projects to build factories and other buildings must be approved by the management board
Land conditions: Average leveling height 9m/ Soil quality: hard, leveled

Internal traffic system: reasonably designed to ensure smooth traffic throughout the industrial park. The system is designed as follows:
+ Main roads in the industrial park are 40 m wide - 4 lanes
+ Branch roads in the industrial park are 22 m wide - 2 lanes
All internal roads are designed and constructed in strict compliance with national regulations, and are completed with asphalt concrete. The internal roads are also equipped with a complete and aesthetic high-voltage lighting system
Power supply system: Power supplied to the industrial park is taken from the 110/35/22KV transformer station. High voltage power network is provided along internal traffic in the industrial park.
Water supply system: Clean water is provided with a capacity of 30,000 m3 per day from the clean water plant. Water is supplied to the factory fence using an international standard water supply pipe system.

Water and waste treatment system: Wastewater is collected at the industrial park's wastewater plant for treatment to meet water standard A (QCVN 40:2011/BTNMT) before being discharged into the industrial park's general system. The wastewater plant was built with a treatment capacity of 2,900m3/day - night
Waste is collected and transported out of the industrial park by factories in the industrial park to avoid causing environmental pollution.
Exhaust gases from factories are installed with filtration systems according to national standards before being discharged into the natural environment
Communication system: the industrial park has an underground communication cable system installed and is supplied to the factory fence by an international standard cable system.
Through the connection system between the industrial park's communication center through the postal and telecommunications network, all communication needs are guaranteed and are capable of providing all necessary services such as: Private switchboard , international calling, remote conferencing, leased lines, high-speed internet, email, etc.

Fire prevention and fighting system: the industrial park is equipped with a warning, prevention and fire fighting system that strictly complies with national regulations.
Fire hydrants are installed at internal traffic hubs and at every factory to ensure effective protection of the entire area from fire and explosion incidents.
.jpg)
Industrial park management fee: 0.5 USD/m2/year. This fee is paid annually in the first month of the year
Electricity usage fee: 0.1 USD during peak hours/ 0.05 USD during normal hours/ 0.03 USD during off-peak hours
Clean water usage fee: 0.40 USD/m3. The amount of clean water used is calculated according to the reading on the water meter
Wastewater & solid waste treatment fee: 0.28 USD/ m3. The quality requirement before treatment is class B, after treatment it is class A
Selling price: negotiable
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | Sonadezi An Binh Joint Stock Company | |
| Location | Long Khanh town, Dong Nai province | |
| Acreage | total area | 150 ha |
| Factory land area | ||
| Vacant area | ||
| Ratio of green trees | ||
| Operating time | 50 years | |
| Current investors | ||
| Main job | Ceramics industry; process the wood; building materials; garment processing; processing handicrafts; mechanical industry; mechanical | |
| Occupancy | 50% | |
| LOCATION & DISTANCE: | ||
| Road | Far from Bien Hoa City center: 42km, Ho Chi Minh City center: 50km | |
| Air | Long Thanh International Airport: 40km | |
| Train | Yes | |
| Sea port | Dong Nai port: 45km, Cai Mep port: 60km | |
| INFRASTRUCTURE: | ||
| Geological | Hard soil: 1,5-2,5kg/cm2 | |
| Internal traffic | Main road | Number of lane: 4 lanes |
| Secondary branch road | Number of lane: 2 lanes | |
| Electricity supply | Voltage | Power line: 110/22KV |
| Source capacity | 2x40 MVA | |
| Clean water | Wattage | 3000m3/day |
| Highest capacity | ||
| Waste water treatment system | Wattage | 5000m3/day |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 50 USD |
| Rental term | 2059 | |
| Type/Class | Level A | |
| Payment methods | 12 months | |
| Deposit | 10% | |
| Minimum area | 1ha | |
| Workshop | $3 | |
| Management fee | Management fee | 0.4 USD/m2 |
| Payment methods | yearly | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A (QCVN 40:2011/BTNMT) | |
| Other fees | Yes | |