GO DAU INDUSTRIAL PARK - DONG NAI

Go Dau Industrial Park was established under Decision No. 662/TTg dated October 18, 1995 of the Prime Minister with an area of 330 hectares (excluding Vedan Vietnam Industrial Company located outside the industrial park). Construction management and business of technical infrastructure services in Go Dau Industrial Park are undertaken by Sonadezi Company

Overview of Go Dau industrial park - Dong Nai

Go Dau Industrial Park was established under Decision No. 662/TTg dated October 18, 1995 of the Prime Minister with an area of 330 hectares (excluding Vedan Vietnam Industrial Company located outside the industrial park). Construction management and business of technical infrastructure services in Go Dau Industrial Park are undertaken by Sonadezi Company.

Some typical businesses: AK Vina Company Limited; Taicera Ceramics Industrial Joint Stock Company; APL International Company Limited

Geographical location of Go Dau industrial park

Go Dau Industrial Park was built in Phuoc Thai commune, Long Thanh district, Dong Nai province, located in the southern key economic region (including Dong Nai, Ho Chi Minh City, Ba Ria - Vung Tau and Binh Duong). . It is one of the few industrial parks with an internal port convenient for transporting import and export goods.

From Ho Chi Minh City center: 67 km, Bien Hoa city: 42 km

From Long Thanh International Airport: 12 km

From Bien Hoa station: 42 km, from Song Than station: 54 km

From Go Dau port: 0.5 km, Vung Tau port: 40 km

Infrastructure of Go Dau industrial park

Power supply:

Power source is stably supplied by Dong Nai Electricity Company Limited, ensuring to meet the needs of businesses in the entire Industrial Park.

Water supply:

The water supply system is provided by Phu My Water Supply Joint Stock Company with a receiving flow of 10,000 m3/day and night.

Communications:

Convenient telecommunications system with automatic switchboard 960 IDD circuit numbers with VIBA system 40 international direct communication channels, ADSL high-speed Internet connection

Drainage system:

The drainage system installed along internal traffic routes can ensure the collection of all rainwater and wastewater from factories in Go Dau industrial park.

Wastewater is treated centrally at the factory located in the industrial park

Traffic:

With a complete system of traffic signs, speed bumps, traffic warning lights, road markings, and road lighting, asphalt concrete pavement with load capacity (H30) ensures circulation and transport. Transport goods quickly and conveniently.

Firefighting system

Fire prevention and fighting system according to standards

Investment incentives in Go Dau industrial park

Tax exemption for 02 years; 50% reduction for the next 04 years (Decree 218/2013/ND-CP)

Human resources, salaries, costs in Go Dau industrial park

Abundant labor source with the average salary for unskilled workers is 170 USD/person/month, and for technical workers is about 250 USD/person/month.

Management costs, electricity, water, and wastewater treatment fees are calculated according to state regulations for Dong Nai province.

Evaluate

Advantage

Complete infrastructure.

Synchronized traffic system.

Convenient geographical location: near the airport, railway station, port

Defect

The industrial park no longer has space for rent

For detailed information, please refer to the parameter table below.

Category Detail
OVERVIEW: 
Infrastructure investor Bien Hoa Industrial Park Development Company (Sonadezi)
Location Phuoc Thai commune, Long Thanh district, Dong Nai province
Acreage total area 210 ha
Factory land area  
Vacant area  
Ratio of green trees  
Operating time 50 years
Current investors  
Main job Plastic and resin production industry; mechanical engineering and metal structure manufacturing; production of ceramics and construction materials; Fertilizer and chemical production; liquefied petroleum gas and asphalt processing
Occupancy 100%
LOCATION & DISTANCE: 
Road From Ho Chi Minh City center: 67 km, Bien Hoa city: 42 km
Air From Long Thanh International Airport: 12 km
Train Bien Hoa Station: 42 km; Song Than station: 54 km
Sea port Go Dau port: 0.5 km; Vung Tau port: 40 km
INFRASTRUCTURE: 
Geological Hard soil: 1,5-2,5kg/cm2
Internal traffic Main road Number of lane: 4 lanes
Secondary branch road Number of lane: 2 lanes
Electricity supply Voltage Power line: 110/22KV
Source capacity 40 MVA
Clean water Wattage 10000m3/day
Highest capacity  
Waste water treatment system Wattage 5000m3/day
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE: 
Land Land rents 60 USD
Rental term 2045
Type/Class Level A
Payment methods 12 months
Deposit 10%
Minimum area 1ha
Workshop $3
Management fee Management fee 0.4 USD/m2
Payment methods yearly
Electricity price Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Supplier EVN
Price of clean water Water price 0.4 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.28 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A (QCVN 40:2011/BTNMT)
Other fees Yes
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook