Bien Hoa Industrial Park is known as one of the first industrial parks in Vietnam, marking a change in the industrialization and modernization of our country. According to Decree No. 49/KT dated May 21, 1963, Bien Hoa 1 industrial park was officially successful.
Currently, Bien Hoa 1 industrial park is still located in An Binh district, Bien Hoa city, Dong Nai province. The total area of this industrial park is more than 320 hectares. The investor of the Bien Hoa industrial park project is Bien Hoa Industrial Park Development Company (also known as Sonadezi Bien Hoa). The Company will carry out construction activities and complete infrastructure and landscape for the industrial park.

At the time of its establishment, the Bien Hoa industrial park project was hoped to help disperse the workforce currently concentrated in Saigon. At the same time, it will promote uniform economic and industrial development in the southern provinces.
Up to now, in Bien Hoa 1 industrial park, there are 76 projects of businesses and investors renting production space. The main fields attracting investment in this industrial park are construction materials production, electronic assembly, chemicals, metallurgy and production of consumer goods.
In the following section, learn more detailed information about the geographical location, total planning area and existing infrastructure at Bien Hoa 1 industrial park - the oldest industrial park in Vietnam until now. current time.
Currently, the location of Bien Hoa 1 industrial park is considered a "prime" location when it is favorable for the development of businesses located in this industrial park. Specifically, Bien Hoa 1 industrial park is currently located in An Binh district, Bien Hoa City, Dong Nai province.

With this location, part of Bien Hoa 1 industrial park will be adjacent to the Dong Nai river and continue to run along National Highway 1. Thus, this contiguity will help the process of moving and transporting goods. as well as connecting locations with industrial parks much easier and more convenient.
Besides, travel and transportation can also be done through many forms such as railway, waterway or road. From Bien Hoa 1 Industrial Park, Dong Nai province can quickly move to other provincial areas such as City. Ho Chi Minh, Da Lat, Vung Tau,... and many other locations in the inner region.
Details of the distance between Bien Hoa 1 industrial park to some surrounding locations such as the city center, train station, airport,... are as follows:
30km from Ho Minh City Center
About 30km from Saigon Station
About 2km from Dong Nai Port
About 25km from Tan Cang
About 30 km from Saigon Port
44km from Phu My Port
About 30km from Tan Son Nhat International Airport
Currently, there is a project underway to relocate Bien Hoa 1 Industrial Park to Giang Dien Industrial Park in Trang Bom district to increase the planned area to 500 hectares. This project will partly help improve the environmental condition of Dong Nai River, and will also ensure the planning of Bien Hoa 1 industrial park is more complete, becoming a brilliant urban development area.
As one of the oldest industrial parks in Vietnam, the planned area at that time of the Bien Hoa 1 industrial park project was 355 hectares. In order to ensure the operation of the industrial park as well as the investment and factory construction needs of the enterprise, the current rental area is 231.08 hectares.
The current rental area of Bien Hoa 1 industrial park is 231 hectares, corresponding to a 100% occupancy rate. This is a point that shows the attraction of businesses and investors to the Bien Hoa 1 industrial park construction project.
Although it is one of the industrial parks built at a time when Vietnam's economy and industry were not yet developed; Although it is a long-standing industrial park, the infrastructure of the Bien Hoa 1 Industrial Park project is still focused, ensuring the construction of adequate basic infrastructure to meet the needs of businesses and investors. private here.

Bien Hoa 1 Industrial Park was built with a road system to help move and transport within the industrial park become easier and more convenient, ensuring production activities of businesses here. The main lanes and secondary roads are fully arranged to meet the needs of travel within the industrial park.
The power supply for Bien Hoa 1 industrial park is taken from the national grid system through a 126 MVA transformer station system. Power supply is always guaranteed to be provided 24/7 for businesses, ensuring all production activities of factories and enterprises are not interrupted by power sources.
The entire Bien Hoa 1 industrial park is supplied with clean water from Thien Tan water plant with a capacity of 25,000 m3. With a large capacity, it will help ensure that all water needs of businesses and factories operating in the industrial park are met. In addition, there is also a water storage tank system in case of emergencies.

Wastewater from Bien Hoa 1 industrial park is treated at Bien Hoa industrial park with a wastewater treatment plant with a capacity of 4000m3/day. However, this is a limitation of Bien Hoa 1 industrial park as it can only treat a part of wastewater from businesses. The remainder of the enterprise will have to process and discharge directly into the Dong Nai River, causing serious impacts to this river.
Currently, the infrastructure of Bien Hoa 1 Industrial Park is receiving many feedback from businesses as it has begun to degrade and has many potential limitations. In addition, the program to convert the functions of Bien Hoa 1 industrial park is being implemented, and this industrial park will be merged with Giang Dien industrial park.
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | Bien Hoa Industrial Park Development Company (SONADEZI) | |
| Location | An Binh Ward, Bien Hoa City, Dong Nai Province | |
| Acreage | total area | 335 ha |
| Factory land area | ||
| Vacant area | ||
| Ratio of green trees | ||
| Operating time | 50 years | |
| Current investors | ||
| Main job | Food Processing; chemistry; building materials; mechanical; electronic; paper and paper products; elactric cable; steel; paint; wood and wood products; High grade glass; rubber; textile; packaging; food; drinks; service | |
| Occupancy | 100% | |
| LOCATION & DISTANCE: | ||
| Road | Bien Hoa city center: 3 km, Ho Chi Minh city: 30 km | |
| Air | Tan Son Nhat Airport: 30 km | |
| Train | Saigon Station: 30 km | |
| Sea port | Dong Nai Port: 2 km, New Port: 25 km, Saigon Port: 30 km; Phu My port: 44 km | |
| INFRASTRUCTURE: | ||
| Geological | Hard soil: 1,5-2,5kg/cm2 | |
| Internal traffic | Main road | Number of lane: 4 lanes |
| Secondary branch road | Number of lane: 2 lanes | |
| Electricity supply | Voltage | Power line: 110/22KV |
| Source capacity | 126 MVA | |
| Nước sạch | Wattage | 25000 m3/day |
| Highest capacity | ||
| Waste water treatment system | Wattage | 4000 m3/day |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 40 USD |
| Rental term | 2050 | |
| Type/Class | Level A | |
| Payment methods | 12 months | |
| Deposit | 10% | |
| Minimum area | 1ha | |
| Workshop | $3 | |
| Management fee | Management fee | 0.4 USD/m2 |
| Payment methods | yearly | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A (QCVN 40:2011/BTNMT) | |
| Other fees | Yes | |