SOUTH DONG PHU INDUSTRIAL PARK - BINH PHUOC

Detailed information about Nam Dong Phu industrial park Name: Nam Dong Phu Industrial Park - Binh Phuoc Operation time: January 2008 Address: Tan Lap Commune, Dong Phu District, Binh Phuoc Province Total area: 72 hectares

Detailed information about Nam Dong Phu industrial park

Name: Nam Dong Phu Industrial Park - Binh Phuoc

Operation time: January 2008

Address: Tan Lap Commune, Dong Phu District, Binh Phuoc Province

Total area: 72 hectares

Price: Negotiable

Location and connection to Nam Dong Phu Industrial Park

  From the industrial park, it can connect to industrial areas and large centers, specifically:

+ 80 km from Ho Chi Minh city center,

+ 49 km from the center of Binh Duong province

+ 111 km from Song Than station

+ 103 km from Tan San Nhat international airport

Infrastructure of Nam Dong Phu industrial park

- Internal transportation system:

+ Main road: 4 lanes

+ Side branch road: 2 lanes

- Electricity: The power supply system runs along the plots of land and along the fences of factories. The power supply comes directly from the national 110 KV line, through the 110KV-22 MVA Transformer Station, thus always maintaining a stable power source for the factories' production activities. Medium voltage power grid along the roads, providing stable power for all factories.

- Water: Clean water system with capacity up to 6,000 m3/day and night.

- Wastewater treatment: Centralized wastewater treatment plant with a capacity of 4,000m3/24 hours meets Class A output standards according to regulations of the Vietnamese Government.

- Occupancy rate: contact TOPLAND

Land rental costs and operating costs

- Infrastructure management and maintenance fee: 0.35 USD/m2/year

- Electricity supply price: From 0.03 USD/kWh - 0.1 USD/kWh depending on time of electricity use

- Water supply price: 0.4 USD/m3

- Wastewater treatment fee: 0.28 USD/m3

Human resources, salaries, costs in Nam Dong Phu industrial park

Binh Phuoc is in the period of "golden population" structure with the number of workers accounting for more than 60% of the population. This is a favorable opportunity for Binh Phuoc to attract human resources and use a skilled workforce in the 4.0 industrial revolution.

Investment incentives for Nam Dong Phu industrial park
Corporate income tax (CIT), Exemption for the first 02 years, 50% reduction for the next 04 years

Exemption from import tax

Incentives for imported raw materials

Incentives for investors according to Decree 67

Category Detail
OVERVIEW: 
Infrastructure investor  
Location  
Acreage total area 72 ha
Factory land area  
Vacant area  
Ratio of green trees  
Operating time 2008
Current investors  
Main job  
Main job  
LOCATION & DISTANCE: 
Road Trung tâm tỉnh Bình Dương: 49 km, thành phố Hồ Chí Minh: 80 km
Air  
Train  
Sea port  
INFRASTRUCTURE: 
Geological  
Internal traffic Main road  
Secondary branch road  
Electricity supply Voltage Power line: 110/22KV
Source capacity  
Clean water Wattage  
Highest capacity  
Waste water treatment system Wattage  
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE: 
Land Land rents  
Rental term  
Type/Class  
Payment methods  
Deposit  
Minimum area  
Workshop Factory rental price  
Rental term  
Type/Class  
Payment methods  
Scale of factories  
Deposit  
Minimum area  
Management fee Management fee 0.35 USD/m2
Payment methods hàng năm
Electricity price Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Supplier EVN
Price of clean water Water price 0.4 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.28 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A
Other fees Insurance: yes
Bảo hiểm: có
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook