
The future industrial park will attract many large investors, promising to be a potential project for businesses here to further develop. In particular, the infrastructure around the project is fully and methodically invested. From the project, people only go to Ho Chi Minh City for about 30 minutes, moving to Dong Xoai town about 6 km. Investing in this project, people can be completely assured about safety and quality because the project's investor is a reputable unit, the papers and legal records are clear and transparent.
Project name: Dong Xoai I Industrial Park
Location: Tan Thanh commune, Dong Xoai town, Binh Phuoc province
Investor: Management Board of Industrial Parks of Binh Phuoc province
Area: 153.49 hectares
Dong Xoai 1 Industrial Park is a place that focuses on diverse production industries, creating comprehensive development for Binh Phuoc province.
The project will create jobs for thousands of workers and residents living here inside and outside the region in Vietnam.
Diverse factory rental areas help businesses and companies easily find a workplace suitable for their production scale.
The factory rental price in the industrial park is mid-range and has many great incentives, so customers can completely invest in this project.

Dong Xoai 1 Industrial Park was built and planned to be located in Tan Thanh commune, the center of Dong Xoai town, Binh Phuoc province. From the industrial park through arterial traffic routes, it only takes a few dozen minutes to reach big cities such as Ho Chi Minh, Bien Hoa, Binh Duong,... Thereby, there is a very good opportunity to give exchange and exchange for better economic development.
Some outstanding amenities of the Dong Xoai 1 industrial park project:
The dining area inside the project is spacious and has a variety of products to help meet the needs of workers working here.
Internal traffic in the area is concreted, paved, divided into lanes and has a full drainage system. The road area is spacious, enough for vehicles to run in opposite directions safely when moving in and out of the project.
A system of green trees planted throughout the industrial park provides an airy and fresh space.
Security systems, fire prevention, electrical systems, lighting, clean water,... are also fully equipped inside Dong Xoai 1 industrial park.

Some infrastructure and utilities outside the area near Dong Xoai 1 industrial park are as follows:
The project is close to the hospital system such as K23 clinic, Binh Phuoc Provincial General Hospital, Dong Xoai City Medical Center, Binh Phuoc Provincial Traditional Medicine Hospital, Tan Xuan ward medical station, etc. .
From the industrial park, moving to Dong Xoai Binh Phuoc city will take about 10 minutes.
System of educational schools such as Dong Xoai High School, Binh Phuoc Medical College, Quang Trung High School for the Gifted, Tien Thanh Primary School,...
System of markets such as Tan Thanh market, Bach Hoa Xanh supermarket, convenience stores,....

| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | ||
| Location | Tan Thanh commune, Dong Xoai town, Binh Phuoc province | |
| Acreage | total area | 153.49 ha |
| Factory land area | ||
| Vacant area | ||
| Ratio of green trees | ||
| Operating time | 2006 | |
| Current investors | ||
| Main job | Commercial import and export Housing business, housing rental, office rental, housing rental for business purposes (kiosks, shopping centers), real estate brokerage Investing in industrial park infrastructure , construction of technical infrastructure, construction of water supply and drainage systems, electrical installation, bridge and road construction Ground leveling Planting and processing industrial plants Production and trading of construction materials. Wood exploitation and processing. Exploitation of stone, sand, gravel and clay | |
| Occupancy | ||
| LOCATION & DISTANCE: | ||
| Road | Dong Xoai town center: 6 km, Ho Chi Minh City: 110 km | |
| Air | ||
| Train | ||
| Sea port | ||
| INFRASTRUCTURE: | ||
| Geological | ||
| Internal traffic | Main road | |
| Secondary branch road | ||
| Electricity supply | Voltage | Power line: 110/22KV |
| Source capacity | ||
| Clean water | Wattage | |
| Highest capacity | ||
| Waste water treatment system | Wattage | |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 50 USD |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Deposit | ||
| Minimum area | ||
| Workshop | Factory rental price | |
| Rental term | ||
| Rental term | ||
| Payment methods | ||
| Scale of factory | ||
| Deposit | ||
| Minimum area | ||
| Management fee | Management fee | 0.4 USD/m2 |
| Payment methods | hàng năm | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A | |
| Other fees | Insurance: yes | |