DONG AN II INDUSTRIAL PARK - BINH DUONG

Dong An II infrastructure is located in the industrial - solution and urban complex of Binh Duong, in Hoa Phu ward, Thu Dau Mot town.

OVERVIEW OF DONG AN II INDUSTRIAL PARK - BINH DUONG

Dong An II infrastructure is located in the industrial - solution and urban complex of Binh Duong, in Hoa Phu ward, Thu Dau Mot town. The total industrial land area of Dong An II Industrial Park was 210 hectares when phase II was completed in the fourth quarter of 2010. Phase I with 158 hectares was completed and collected at the end of 2008, and is currently filled. nearly 70% with 29 shareholders from different governments on five continents.

Not only convenient transportation infrastructure, the business community of Dong An 2 infrastructure is enjoying the most superior solutions from Binh Duong in the process of making the province a strong industrial connection center. of the southern key industrial region. Therefore, this is a bright infrastructure among the southern infrastructure.

Investor: Hung Thinh Trading - Production - Construction Joint Stock Company

Land area: 210 hectares

Total Investment: 290,197 billion VND

Completed: 2006

Land rent: 1.2$/m2/year

Service fee: 0.4$/m2

Minimum contract: 10,000m2

Electricity fee: 0.05$

Wastewater fee: 0.28$/m3

Water fee: 0.4$/m3

Reasons for choosing Dong An 2 Industrial Park project

The infrastructure is equipped with state-of-the-art equipment, including: A series of internal roads 22-30m wide, terrazzo tiled walkways. The internal traffic system and technical foundation routes are conveniently built in a checkerboard style with main roads in the north-south - east-west direction. Medium voltage power grid along walking streets, safely distributing electrical energy to workshops. Electricity is brought to factories using a series of dual high voltage lines running in 22kv loops arranged along the roads. The clean water distribution chain is installed close to the fence wall, with a capacity of 20,000 m3/day and night, not refusing requests to repatriate for factory operations... The underground post and telecommunications cable chain has been installed. Carefully installed close to the fence of all plots of land committed to providing telecommunications solutions including mobile, fax, adsl, high-speed internet fiber optic cable. The wastewater treatment workshop focuses on: total capacity of 3,000 m3/day and night, built according to global criteria of the World Health Organization, to serve the needs of environmental criteria.

Location of Dong An 2 Industrial Park project

Dong An 2 infrastructure is located at a planned location in the industrial - solution and urban complex of Binh Duong province. This infrastructure in the south has a total area of 210 hectares, with the project owner of Transaction - Sinh - Creating Prosperity Joint Stock Company and co-management and operation of Industrial Development Joint Stock Company. This location has smooth road, waterway and air traffic.

In addition, with a location not far from Ho Chi Minh City, products and services from here can easily be close to the urban development business area. Location with mild weather (20 - 30oC), lack of storms, lack of earthquakes, strong soil load bearing capacity, very smooth and saves money. Prime location of copper infrastructure An 2 will bring many opportunities and conveniences for investors, details are:

Far from Ho Chi Minh City. Saigon 40 km

Distance to the provincial connection center: 4 km from Binh Duong administrative center

37 km from Tan Son Nhat airport

39 km from Ho Chi Minh City port

32km from Tsunami station

Internal amenities of Dong An 2 Industrial Park project

Infrastructure amenities include:

Atm, office on behalf of the bank.

pccc chain complete.

The electricity and water chain fully meets customer needs.

High-speed internet chain.

Physical examination room.

Villas, restaurants, hotels, swimming pools, golf courses, tennis courts for investors and experts

Ready-built factories

Freight forwarding solution: complete import and export documents for equipment, raw materials, transport containers from port to workshop and vice versa.

Labor distribution and management solutions. Comprehensive and responsive solution according to user requirements, including employee recruitment, mainstream education on stability, values, industrial style, labor management, labor relations management. ..

Industrial enjoyment solutions

External amenities of Dong An 2 Industrial Park project

The project is located in the center of bustling industrial zones, so moving and connecting to the area is extremely quick and convenient:

-Hoa Loi Ward People's Committee 2.8km

-An Phuoc General Clinic 7.7km

-Phu Chanh A Market 4.7km

-Becamex Hoa Loi Apartment 3.2km

Category Detail
OVERVIEW: 
Infrastructure investor Hung Thinh Trading - Production - Construction Joint Stock Company
Location Hoa Phu Ward, Thu Dau Mot City, Binh Duong Province
Acreage total area 210
Factory land area  
Vacant area  
Ratio of green trees  
Operating time 2006
Current investors Currently, there are many Korean, Taiwanese, Swiss, Malaysian, Japanese, American investors... investing in developing factories in Dong An II industrial park, typically: Cadisun-Co., Ltd. Cosmolink, Nam Kim Steel Company, Tien Phong Plastic Company, Adora Pa Company
Main job Production of electronic components; processing industry; processing consumer goods and food; mechanical industry and construction materials
Occupancy 100%
LOCATION & DISTANCE: 
Road To Ho chi Minh City 40 km
Air To Airport Tan Son Nhatt 37 km
Train To station Song Than 25 km
Sea port To seaport Sai Gon 39 km
INFRASTRUCTURE: 
Geological Hard soil: 1,5-2,5kg/cm2
Internal traffic Main road Width: 30m, Number of lane: 2 lanes
Secondary branch road Width: 22m, Number of lane: 2 lanes
Electricity supply Voltage Power line: 110/22KV
Source capacity 54 MVA
Clean water Wattage 12000m3/day
Highest capacity  
Waste water treatment system Wattage 3000m3/day
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE: 
Land Land rents 60 USD
Rental term 2056
Type/Class Level A
Payment methods 12 months
Deposit 0.1
Minimum area 1ha
Workshop $3
Management fee Management fee 0.4 USD/m2
Payment methods yearly
Electricity price Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Supplier EVN
Price of clean water Giá nước 0.4 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.28 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A (QCVN 40:2011/BTNMT)
Other fees Yes
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook