Kim Huy Industrial Park in Binh Duong province has a scale of more than 213 hectares and was put into operation in 2006, promising to bring great values in terms of operating capabilities, meeting production needs and attracting domestic and foreign investment capital. foreign.

Not only is it convenient in terms of transportation infrastructure, the location of Kim Huy Industrial Park in Binh Duong is one of the extremely attractive destinations for investors, especially foreign investors. Therefore, this is one of the prominent industrial parks in the Southern industrial parks.
Kim Huy Industrial Park is located in Binh Chuan, Thuan An district, Binh Duong province. This industrial park in the South has a total area of more than 213 hectares, invested by Kim Huy Industrial Park Development Company Limited. This location is adjacent to vital traffic routes such as Ring Road 3, Ring Road 4, My Phuoc - Tan Van Expressway, Avenue Road,... Dense, modern, planned traffic routes are convenient for businesses to connect and circulate materials and goods.

The area has a temperate climate (20 - 35oC), no storms, no earthquakes, high soil load bearing intensity, very convenient and saves construction costs.
This place is located near the economic - cultural - political centers of Binh Duong province as well as the Southern region. The favorable location of Kim Huy Industrial Park will bring many opportunities and amenities to investors, specifically:
Distance from City. Ho Chi Minh 40 km
18km from Tan Cang
58km from Tan Son Nhat airport
35 km from Saigon station
45km from Cat Lai port
The industrial park's infrastructure is modernly equipped, including:
Internal road: the main road is 40m wide divided into 4 lanes, the secondary road is 20m wide divided into 2 lanes, built to ensure smooth and convenient travel and transportation.

Water: capacity of 4000m3/day and night providing clean water to plots of land.
Standard high voltage power source 110/22KV
Post and telecommunications: pre-installed telephone lines to the boundaries of land plots and fully provided according to customer needs, with no quantity limit. The fiber optic cable system can connect to broadband telecommunications applications (ADSL) and leased line systems (Lease Line).
Wastewater treatment plant with a capacity of 2000m3/day and night, ensuring reception and treatment to meet prescribed standards before being discharged into the environment.
Fire prevention and fighting: professional fire prevention and fighting team in the industrial park. Water supply faucet system along internal roads, 24/7 industrial park security force is trained in fire prevention and anti-riot skills.
Labor support and consulting center located in the industrial park to support investors in recruitment and advise on labor policies; Promote labor recruitment programs, introduce jobs and create conditions to support labor in industrial parks.
Commercial and service area: providing support services such as housing areas for experts, banks, delivery services, canteens for workers, medical care services, entertainment areas ,….
Kim Huy Industrial Park is a multi-industry industrial park. This industrial park will be a difficult choice to ignore for investors looking for cheap industrial parks in Binh Duong province.
Kim Huy Industrial Park has a total area of more than 52.86 hectares and was completed and put into operation in 2002.

In there:
Land for factory and warehouse construction: 144.69 hectares
Land for construction of operating and service center: 5.04 hectares
Parking lot: 2.58 hectares
Green land: 22.28 hectares
Traffic land: 29.73 hectares
Land for key technical infrastructure projects: 5.97 hectares
Other land: 3.35 hectares
Total implemented investment capital is 194 billion VND.
Mechanical processing and assembly industry.
Garment, electricity, electronics.
Industrial production of high-quality wooden products;

Packaging manufacturer.
Other high-tech industries and clean industries.
Utilities of Kim Huy Industrial Park
Utilities in the industrial park include:
Administrative center of Binh Duong province
Commercial centers, Sports centers, Service areas, Markets,...
Support land consulting services and factory tours.
Law consulting center, consulting on procedures, conditions, business licenses,...
Banking system nationwide.
Binh Duong Notary Office
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | Kim Huy Industrial Park Development Company Limited | |
| Location | Phu Tan Ward, Thu Dau Mot City, Binh Duong Province | |
| Acreage | total area | 213.63 |
| Factory land area | ||
| Vacant area | ||
| Ratio of green trees | ||
| Operating time | 50 years | |
| Current investors | ||
| Main job | Garment industry, high-quality leather shoes; mechanical production and assembly; production of high-quality wooden products; Some occupations do not pollute the environment | |
| Occupancy | 100 | |
| LOCATION & DISTANCE: | ||
| Road | 40 km from Ho Chi Minh City | |
| Air | 40 km from Tan Son Nhat airport | |
| Train | 35 km from Saigon station | |
| Sea port | Cat Lai Port 45 km | |
| INFRASTRUCTURE: | ||
| Geological | Hard soil: 1,5-2,5kg/cm2 | |
| Internal traffic | Main road | Width: 40m, Number of lane: 4 lanes |
| Secondary branch road | Width: 20m, Number of lane: 2 lanes | |
| Electricity supply | Voltage | Power line: 110/22KV |
| Source capacity | ||
| Clean water | Wattage | 4000m3/ngày đêm |
| Highest capacity | ||
| Waste water treatment system | Wattage | 2000m3/ngày đêm |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 35 USD |
| Rental term | 2056 | |
| Type/Class | Level A | |
| Payment methods | 12 months | |
| Deposit | 0.1 | |
| Minimum area | 1ha | |
| Workshop | $3 | |
| Management fee | Management fee | 0.4 USD/m2 |
| Payment methods | yearly | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A (QCVN 40:2011/BTNMT) | |
| Other fees | Yes | |