PHUOC DONG INDUSTRIAL PARK - DETAILS

Phuoc Dong Industrial Park (Go Dau District & Trang Bang Town, Tay Ninh Province, Vietnam) is planned according to Decision No. 1477/QD-UBND of the People's Committee of Tay Ninh Province. The total area of ​​Phuoc Dong Industrial Park is 2191.97 ha, located in the Complex of 3,285 ha. Altitude: 12–17 m above sea level. Flat terrain, hard ground.

Location - Geography - Traffic

Phuoc Dong Industrial Park is located in two districts and towns, Go Dau District and Trang Bang Town, Tay Ninh Province, Vietnam. Located in the heart of Tay Ninh province is the main connection point between Ho Chi Minh City and Phnom Penh, two important economic and cultural centers of Vietnam and Cambodia. Tay Ninh is the western gateway of Vietnam connecting Cambodia and Thailand markets through Moc Bai international border gate and other national border gates.

DT 782 is the most important and largest road connecting to Phuoc Dong Industrial Park. DT 782-784 is one of the important roads of the province in socio-economic development. According to the plan, DT 782 is a grade II technical motorway with a design speed of 100 km/h; asphalt concrete road surface with 4 lanes, 15m wide, with median strip between. This route connects with National Highway 22B, which is very convenient for transporting goods to Ho Chi Minh City. The project is invested with the State budget.

Road distance:

Trans-Asia Road (National Highway 22): 10 km

Ho Chi Minh City Center: 60 km

Tay Ninh City Center: 35 km

Moc Bai International Border Gate: 20 km

Distance to the harbour:

Thanh Phuoc transshipment port: 10 km

Cat Lai Port: 80 km

Tan Son Nhat International Airport: 60 km

kcn phước đông

Planning - Layout

Phuoc Dong Industrial - Urban - Service Complex is divided into three phases: Phuoc Dong Industrial Park phase 1 and phase 2 focus on leasing land/industrial factory, phase 3: Urban areas - resettlement. Currently, Phuoc Dong Industrial Park phase 1 has been filled with 90% of the land rental rate.

Phuoc Dong Industrial Park Phase 2 is being deployed for infrastructure leasing, attracting high-tech and less labor-intensive industries such as assembling, manufacturing electronic components, computers and semiconductors; telecommunications cables and materials; electrical equipment; pharmaceuticals, medical equipment; exact mechanics; industries producing new materials, nanotechnology and industries with advanced technology that do not pollute the environment.

Electricity distribution system

4 internal stations: Station 1 (2 x 63MVA); Station 2 (2 x 63MVA + 40 MVA); Station 3 (2 x 63MVA) and Station 4 (2 x 63MVA).

Trang Bang Station 110KV (2x40MVA)

Thanh Duc Station (40MVA)

Water supply system

High quality water source from Dau Tieng reservoir (1.58 billion m3)

Raw water from the East canal 220,000 m3/day-night

Internal station, capacity 120,000m3/day-night

Waste water treatment system

Meets standard A according to QCVN 40:2011/BTNMT

Large and modern solid waste collection and sorting center.

Internal station, capacity 90,000m3/day-night

Telecommunications system

ADSL broadband service, Optical fiber.

Telecommunications with IDD.

Drainage system

Wastewater is discharged into Ba Tuoi stream and Cau Duc stream.

High ground position to prevent flooding.

Good geology

Altitude: 12-17 m above sea level.

The terrain is flat, the soil is hard, thus saving construction costs.

Transportation system

Main road: 6 lanes with a width of 60m.

Internal roads: 2-4 lanes with a width of 18-29m.

Utility services

Customs office in the zone.

ICD, Logistics Shipping Center

Banks, Post Offices, Trade Centers

School, Hospital, Dormitory and Housing

  •  

RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook