THANH THANH CONG INDUSTRIAL ZONE - NEED TO KNOW

Thanh Thanh Cong Industrial Zone is located in Trang Bang district, Tay Ninh province, has a total area of ​​1,020ha, owns a prime location, complete infrastructure, low rent. Currently, Thanh Thanh Cong Industrial Zone is an attractive investment destination and an ideal place to build factories and warehouses for production and business purposes.

GENERAL INFORMATION

An Hoi Hamlet, An Hoa Commune, Trang Bang District, Tay Ninh Province

GEOGRAPHICAL LOCATION

Thanh Thanh Cong Industrial Zone is located in Trang Bang district, Tay Ninh province, with a convenient traffic location, connected to Moc Bai border gate via National Highway 22.

Soil condition: Hard ground

Altitude above sea level: 5-10m

Climatic conditions: relatively mild, divided into 2 seasons: rainy season and dry season, the average temperature is 26-270C and little change, the average annual rainfall is from 1800-2200 mm.

Distance to the nearest big city:: 50km from the center of Ho Chi Minh City

Distance to provincial center: 50km from Tay Ninh city

Distance from nearest airport: Tan Son Nhat International Airport 44km

Distance to the nearest railway station: 50km from Saigon station

Distance to the nearest river port: 10.5km . from Thanh Phuoc port

Distance to the nearest sea port: 50km from the center of Ho Chi Minh City

KCN Thành Thành Công
THE INFRASTRUCTURE
Transportation System
Main axis system: 15m wide, 02 lanes. Internal traffic system: 8m wide, 02 lanes
Electricity
- Trang Bang power station (110/22 kV) - Expected internal power station (110/22 kV), with a design capacity of 2x63 MVA (in 2017)
Country
Water volume (m3/day.night): 52,000
Wastewater treatment
Maximum processing capacity (m3/day.night): - Normal project: 10,000 - Textile and garment project with dyeing: 40,000
Process rubbish
not yet
System of fire
Fire hydrants are installed along all internal roads, fully equipped with fire trucks and fire fighting equipment.
Communications
Internet: VNPT, Viettel, FPT…
Other information
Internet: VNPT, Viettel, FPT…
AREA & CURRENT CONDITION
Total planned area
1,020 hectares (ha)
Area available for rent
516 (ha)
+ Vacant land: 343.5ha + Land with factory: + Office: no
Smallest rental area
0 (m2)
Occupancy
33.47%
 
KCN Thành Thành Công

COST

Land lease
USD/m2

- Normal project: 40USD/m2 - Textile and garment project with dyeing: 48USD/m2

Rent warehouse
25 USD / m2

Minimum rental duration: 3 year minimum lease area: 1,408m2

Management fee

0.4USD/m2/year

Electricity price

Monday to Saturday: peak hours: 2,556 VND/kWh Normal hours: 1,405 VND/kWh off-peak hours: 902 VND/kWh

Sunday: normal hours: 1,405 VND/kWh

Water price

0.3USD/m3

Cost of wastewater treatment

Water treatment price (m3):

- Normal project: 0.3 USD/m3

- Project textile dyeing: 0,38USD / m3

Input processing standard: B Output processing standard: A

Solid waste treatment fee

ENDOW

Corporate income tax incentives

- Business lines in common fields: Preferential tax rate is 17% within 10 years from the time the enterprise has taxable income: the first 2 years tax rate: 0%; For the next 4 years, tax rate: 8.5%; For the remaining 4 years, tax rate: 17% - High-tech industries: 10% tax rate within 15 years from the time the enterprise has taxable income: the first 4 years, tax rate: 0%; The next 9 years, tax rate: 5%; The remaining 02 years, the tax rate: 10%

Preferential import tax

According to the provisions of Article 12, Decree 87/2010/ND-CP of the Government dated August 13, 2010

VAT incentives

Export processing enterprises do not have to pay VAT

Other offers

- Free legal support and advice.

- Labor recruitment support.

- Accompanying businesses throughout the investment process

RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook