Song May Industrial Park is a key project of Dong Nai, developed by Song May Industrial Park Development Joint Venture Company. The project is located in Bac Son commune, Trang Bom district, Dong Nai province, with an extremely beautiful location. Song May Industrial Park where the Estella Urban Area project is located can be considered one of the oldest and most important industrial parks in the area. Song May Industrial Park not only serves as a simple industrial project to serve economic development, but the project also plays an important role in promoting infrastructure completion. Besides, the project also plays a key role in creating connections between neighboring districts and key economic zones. This industrial park officially operated since 1998, with more than 100,000 workers working. The project brings jobs to many people.
Project name: Song May Industrial Park
Investor: Song May Industrial Park Development Joint Venture Company
LOCATION: Road 767, Bac Son commune, Trang Bom district, Dong Nai province
Total area: 473.95ha (Phase 1: 250ha; Phase 2: 223.95ha)
Project type: Industrial park.
Song May Industrial Park possesses an extremely prime location because it is located on Road 767, Bac Son commune, Trang Bom district, Dong Nai province, so the project inherits many advantages in terms of transportation infrastructure as well as the ability to connect connect. With its location advantage, the project is very close to Tri An intersection and directly connected to National Highway 1A. Coming to Song May Industrial Park, it only takes 10 minutes to travel from Bien Hoa, 15 minutes from Trang Bom district administrative center. More specifically, from here you can easily move to other large industrial parks in Dong Nai such as: Ho Nai Industrial Park, Bau Xeo Industrial Park, Giang Dien Industrial Park,... and in the very near future, Long Thanh International Airport . Surrounding Song May Industrial Park is an extremely crowded and economically bustling existing residential area.
Invested and developed by one of the long-standing investors such as Song May Industrial Park Development Joint Venture Company, therefore, the project's internal utilities have been researched and built fully and modernly. First is the traffic system with main roads from 22 - 35m wide, which can have 2 - 4 lanes. There is also an internal traffic road 15 - 22m wide, with a capacity of up to 30 tons for 4 lanes. Next is the electrical system, the project uses the 110V/22KV national electrical system with a total capacity of 61,281 KVA. Regarding the water supply system, the maximum capacity is 10,000m³/day, fully meeting the needs of the entire industrial park. Finally, there is the water treatment system, with a treatment plant that can treat 2000m³ per day and night.
Song May Industrial Park is located in Bac Son commune, Trang Bom district, Dong Nai province, with a convenient location near Tri An intersection, so the project has extremely rich external amenities. From Song May Industrial Park, we have a number of external amenities such as:
Schools: Huynh Van Nghe Secondary School, Mechanical and Irrigation College...
Chu An Market (less than 2km).
Adjacent to National Highway 1A
Distance from city center. Bien Hoa only: 15km
Distance from train station and city airport. Bien Hoa: 16km
From Dong Nai port: 18km
Category | Detail | |
---|---|---|
OVERVIEW: | ||
Infrastructure investor | Song May Industrial Park Development Joint Stock Company (SINPACO) | |
Location | Bac Son commune, Trang Bom district, Dong Nai province | |
Acreage | total area | 250 ha |
Factory land area | ||
Vacant area | ||
Ratio of green trees | ||
Operating time | 50 years | |
Current investors | ||
Main job | Food and food processing industry; manufacturing and assembly industry of electrical, electronic and peripheral equipment; textile and garment industry, leather shoes; mechanical industry, precision mechanics;… | |
Occupancy | 80% | |
LOCATION & DISTANCE: | ||
Road | Far from Bien Hoa City center: 15km, Ho Chi Minh City center: 45km | |
Air | Tan Son Nhat airport: 55 km, Bien Hoa airport: 15 km | |
Train | Bien Hoa Station: 15 km | |
Sea port | Saigon port: 35 km, Go Dau port: 60 km, Vung Tau port: 100 km | |
INFRASTRUCTURE: | ||
Geological | Hard soil: 1,5-2,5kg/cm2 | |
Internal traffic | Main road | Number of lane: 4 lanes |
Secondary branch road | Number of lane: 2 lanes | |
Electricity supply | Voltage | Power line: 110/22KV |
Source capacity | 61 MVA | |
Clean water | Wattage | 13000m3/day |
Highest capacity | ||
Waste water treatment system | Wattage | 4000m3/day |
Internet và viễn thông | ADSL, Fireber & Telephone line | |
LEASING PRICE: | ||
Land | Land rents | 50 USD |
Rental term | 2049 | |
Type/Class | Level A | |
Payment methods | 12 months | |
Deposit | 10% | |
Minimum area | 1ha | |
Workshop | $3 | |
Management fee | Management fee | 0.4 USD/m2 |
Payment methods | yearly | |
Electricity price | Peak | 0.1 USD |
Normal | 0.05 USD | |
Idle | 0.03 USD | |
Payment methods | Monthly | |
Supplier | EVN | |
Price of clean water | Water price | 0.4 USD/m3 |
Payment methods | Monthly | |
Water supplier | Charged by Gov. suppliers | |
Wastewater fee | Price | 0.28 USD/m3 |
Payment methods | Monthly | |
Water quality before treatment | Level B | |
Water quality after treatment | Level A (QCVN 40:2011/BTNMT) | |
Other fees | Yes |