NHON TRACH III INDUSTRIAL PARK - DONG NAI

Nhon Trach 3 Industrial Park is an important industrial park of Dong Nai province. With a total area of 700 hectares, Nhon Trach 3 is a diverse industrial park dedicated to occupations, such as garments, glass production, mechanical engineering, electronics, medical equipment, food processing, cosmetics, etc. banking products and services.

OVERVIEW OF NHON TRACH III INDUSTRIAL PARK - DONG NAI

Nhon Trach 3 Industrial Park is an important industrial park of Dong Nai province. With a total area of 700 hectares, Nhon Trach 3 is a diverse industrial park dedicated to occupations, such as garments, glass production, mechanical engineering, electronics, medical equipment, food processing, cosmetics, etc. banking products and services. The industrial park is located near important economic centers in the south of Vietnam and is equipped with infrastructure systems, electricity, water... This is a multi-industry industrial park including many items and works. important mutual support with complete and complete investor support services. Thanks to state-of-the-art facilities and support services, Nhon Trach 3 industrial park has welcomed many domestic and foreign invested companies here.

Industries attracting investment:

​- Shoes, Leather, Textile, Garment;

- Electricity, Electronics, Mechanical, Construction Materials;

- Wood processing, Paper, Paper packaging, Ceramics, Glass, Plastic products;

- Food, Animal feed, Pharmaceuticals, Flavors, Cosmetics, Products from natural and synthetic rubber.....

LOCATION

Located in the north of Bien Hoa city in the direction of Highway 51, centrally located to major cities of the southern key economic region.

Distance to big city: Distance from City. HCM 30Km (via Cat Lai ferry); Distance from City. Bien Hoa 45Km

Nearest seaport: 22Km from Phu My Port (Guaranteed for 56,000 ton ships); 25Km from Cat Lai Port

Nearest airport: 10 km from Long Thanh International Airport; Tan Son Nhat airport 70 km

Nearest railway station: 45 km from Bien Hoa station (Dong Nai Province); In the planned industrial park, there is a railway station to serve the transfer of goods and passengers connecting the North - South railway line.

THE INFRASTRUCTURE

Roads: The internal road system in the Industrial Park is relatively completely invested.

Power supply: Use national grid power. Voltage level 22Kv. In addition, the industrial park can also use electricity from Formosa company's supply, with a capacity of 150MW.

Water supply: Nhon Trach underground water plant: capacity 20,000m3/day and night; Thien Tan water plant, capacity 200,000m3/day and night.

Communication: The communication system is invested synchronously throughout the industrial park, businesses can register to connect easily and quickly. High-speed ADSL internet system, maximum speed 4MB.

Waste treatment: Waste is collected and transported to centralized treatment areas according to regulations

Wastewater treatment: Wastewater treatment station has total capacity: 14,000m3/day and night. (Phase 1 capacity is 2,000m3/day and night).

Wastewater that needs to be treated from factories: industrial wastewater, including domestic wastewater and production wastewater.

Universities: Lac Hong University, Sonadezi College of Technology and Management, Dong Nai Industrial Technical College...

Housing for workers: There are housing areas for workers, housing for experts and managers

Other facilities: In the industrial park, there are currently 2 separate drainage systems, a rainwater drainage system and an industrial wastewater drainage system.

 

EXPENSE

Rental price without infrastructure: N/A USD/m2

Rental price with infrastructure: 65 USD/m2

Electricity price: According to EVN's price

Water price: According to current regulations of the Provincial People's Committee

Labor price: Reference price: 100 - 400 USD/person/month

Solid waste treatment fee: According to regulations of the Provincial People's Committee and the Industrial Park Management Board

Wastewater treatment fee: According to regulations of the Provincial People's Committee and the Industrial Park Management Board

Management fee: According to regulations of the Provincial People's Committee and the Industrial Park Management Board

Other costs: N/A

INVESTMENT INCENTIVES:

Investment incentives: Land rental prices and preferential infrastructure usage fees are regulated by the Provincial People's Committee.

Investment projects in industrial parks have a tax rate of 20% for a period of 10 years, from January 1, 2016, a tax rate of 17% will apply. Tax exemption for 2 years and 50% reduction in tax payable for the next 4 years. Exemption from import tax for imported goods to create fixed assets of investment projects.

Projects in the category of high technology and supporting industries are exempted from tax for 4 years and have a 50% reduction in tax payable for the next 9 years.

GENERAL COMMENT

Strengths: The industrial park has a good location, suitable for many types of investment, especially clean industries. Preferential policies and good investment support services.

Weaknesses: Traffic is not convenient due to the distance from important traffic hubs

Challenges: Environmental treatment, labor attraction policies

Category Detail
OVERVIEW:
Infrastructure investor  
Location  
Acreage total area 688 ha
Factory land area  
Vacant area  
Ratio of green trees  
Operating time 1997
Current investors  
Main job  
Occupancy 70%
LOCATION & DISTANCE:
Road From Ho Chi Minh City center: 44 km; Bien Hoa city: 30km
Air Tan Son Nhat Airport: 44 km, Long Thanh International Airport: 7 km
Train Bien Hoa Station: 30 km
Sea port Vung Tau port: 60km, Phu My port: 27km; Go Dau port: 23 km
INFRASTRUCTURE:
Geological  
Internal traffic Main road  
Secondary branch road  
Electricity supply Voltage Power line: 110/22KV
Source capacity 50 MVA
Clean water Wattage  
Highest capacity 10000m3/ngày
Waste water treatment system Wattage 7000m3/ngày
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE:
Land Land rents 60 USD
Rental term  
Type/Class  
Payment methods  
Deposit  
Minimum area  
Workshop Factory rental price  
Rental term  
Type/Class  
Payment methods  
Scale of factories  
Deposit  
Minimum area  
Management fee Management fee 0.35 USD/m2
Payment methods Annual
Electricity price Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Supplier EVN
Price of clean water Water price 8.000VNĐ/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.3 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A
Other fees Insurance: yes
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook