LONG KHANH INDUSTRIAL PARK - DONG NAI

Long Khanh Industrial Park was established in June 2008 under Decision No. 1783/QD-UBND of Dong Nai People's Committee, by Long Khanh Industrial Park Joint Stock Company - a subsidiary of Dong Nai Rubber Corporation. belongs to Vietnam Rubber Industry Group as an investor.

Overview of Long Khanh Industrial Park - Dong Nai

Long Khanh Industrial Park was established in June 2008 under Decision No. 1783/QD-UBND of Dong Nai People's Committee, by Long Khanh Industrial Park Joint Stock Company - a subsidiary of Dong Nai Rubber Corporation. belongs to Vietnam Rubber Industry Group as an investor.

Long Khanh Industrial Park with a favorable geographical location, near national highways, ports and airports, is a truly attractive place for investors, including a number of foreign enterprises such as Dong Myung Vina Co., Ltd., Exact Wood Co., Ltd., Pro Ken Co., Ltd.…

Some key areas in the industrial park:

Toy manufacturing industry, assembling sports equipment

Processing agricultural products, food, food

Shoe production, glass production; production of building materials, interior decoration

Electronics and microelectronics

Stamping frames, assembling, manufacturing motorcycles and spare parts

Geographical location of Long Khanh Industrial Park

Long Khanh Industrial Park is located in Suoi Tre and Binh Loc communes, Long Khanh town, Dong Nai province. 2km from National Highway 1A, convenient road, waterway, rail and air traffic, meeting all investors' requirements for transportation and cargo traffic.

Distance from Bien Hoa city center: 40 km, Ho Chi Minh city: 70 km

Distance from Tan Son Nhat airport: 80 km, Long Thanh international airport: 40 km

Distance from Long Khanh station: 4 km, Dau Giay station: 8 km

From Go Dau port: 60 km, Phu My port: 65 km, Vung Tau port: 60km

Infrastructure of Long Khanh industrial park

Power supply:

The power supply system is taken from Long Khanh 110/22KV - 120 MVA transformer tramh invested and built by Long Khanh Electricity along the roads in the industrial park, ensuring sufficient supply for businesses and invested to the foot. factory fence.

Water supply:

Long Khanh Water Supply Joint Stock Company is responsible for providing clean water for the entire factory in the industrial park with a capacity of 8000m3/day.

Communications:

The communication system in the industrial park invested and built by Dong Nai Telecommunications, fully and quickly meets the needs of domestic and foreign communication (landline, mobile, fax, internet, etc.) ADSL ...) with high-speed transmission line, providing the Industrial Park with about 1,962 phone numbers

Drainage system:

Drainage pipes are installed along the internal traffic routes of the industrial park.

The centralized wastewater treatment plant has a capacity of 6400m3/day and night.

Traffic:

The main road is arranged with 4 lanes, the roadbed width is 40m, the internal roads have a width of 20-41.5m, meeting the standard vehicle load of 30 tons.

Investment incentives in Long Khanh industrial park
According to Decree 218/2013/ND-CP dated December 26, 2013, corporate income tax is 22%. Exemption for 02 years and 50% reduction of tax payable for the next 04 years for business income from implementing new investment projects in industrial parks. As of January 1, 2016 remaining 20%

Human resources, salaries, costs in Long Khanh industrial park

Abundant labor source with the average salary for unskilled workers is 170 USD/person/month, and for technical workers is about 250 USD/person/month.

Management costs, electricity, water, and wastewater treatment fees are calculated according to state regulations for Dong Nai city.

Evaluate

Advantage

Complete infrastructure.

Synchronized transportation system.

Convenient geographical location: near the airport, railway station, port

Details of Long Khanh Industrial Park - Dong Nai

Name: Long Khanh Industrial Park - Dong Nai

Investor: Long Khanh Industrial Park Joint Stock Company

Code: LONGKHANH-IP-DNA - Operation period: 2008

Address: Suoi Tre and Binh Loc communes, Long Khanh town, Dong Nai province

Total area: 264ha

Workshop area: 1000m² Land: Minimum land plot:10,000 m2 Factory: Built up area:1,000m2

Construction density (%): 60 (%)

Price: 45 USD/m2 Not including VAT

Note:

Tax exemption for 02 years; 50% discount for the next 4 years (Decree 218/2013/ND-CP)

Category Detail
OVERVIEW: 
Infrastructure investors Long Khanh Industrial Park Joint Stock Company
Location Long Khanh town, Dong Nai province
Acreage total area 264 ha
Factory land area  
Space available  
Ratio of green trees  
Operating time 50 years
Current investors  
Main job Toy manufacturing industry, assembly of sports equipment; agricultural products, food, food processing, shoe manufacturing, glass manufacturing; production of construction materials and interior decoration; electronics and microelectronics, frame stamping, assembly, and manufacturing of motorbikes and accessories
Occupancy 60%
LOCATION & DISTANCE: 
Road Distance from Bien Hoa city center: 40 km, Ho Chi Minh city: 70 km
Air Tan Son Nhat airport: 80 km, Long Thanh international airport: 40 km
Train Long Khanh Station: 4 km, Dau Giay Station: 8 km
Sea port Go Dau Port: 60km, Phu My Port: 65km, Vung Tau Port: 60km
INFRASTRUCTURE: 
Geological Hard soil: 1,5-2,5kg/cm2
Internal traffic Main road Width: 41.5m, Number of lane: 4 lanes
Secondary branch road Width: 20m, Number of lane: 2 lanes
Electricity supply Voltage Power line: 110/22KV
Source capacity 120 MVA
Clean water Wattage 8000 m3/day
Highest capacity  
Waste water treatment system Wattage 6400 m3/day
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE: 
Land Land rents 45 USD
Lease term 2058
Type/Class Level A
Payment methods 12 months
Deposit 10%
Minimum area 1ha
Workshop $3
Management fee Management fee 0.4 USD/m2
Payment methods yearly
Electricity price Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Supplier EVN
Price of clean water Water price 0.4 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.28 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A (QCVN 40:2011/BTNMT)
Other fees Yes
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook