Long Khanh Industrial Park was established in June 2008 under Decision No. 1783/QD-UBND of Dong Nai People's Committee, by Long Khanh Industrial Park Joint Stock Company - a subsidiary of Dong Nai Rubber Corporation. belongs to Vietnam Rubber Industry Group as an investor.

Long Khanh Industrial Park with a favorable geographical location, near national highways, ports and airports, is a truly attractive place for investors, including a number of foreign enterprises such as Dong Myung Vina Co., Ltd., Exact Wood Co., Ltd., Pro Ken Co., Ltd.…
Toy manufacturing industry, assembling sports equipment
Processing agricultural products, food, food
Shoe production, glass production; production of building materials, interior decoration
Electronics and microelectronics
Stamping frames, assembling, manufacturing motorcycles and spare parts
Long Khanh Industrial Park is located in Suoi Tre and Binh Loc communes, Long Khanh town, Dong Nai province. 2km from National Highway 1A, convenient road, waterway, rail and air traffic, meeting all investors' requirements for transportation and cargo traffic.

Distance from Bien Hoa city center: 40 km, Ho Chi Minh city: 70 km
Distance from Tan Son Nhat airport: 80 km, Long Thanh international airport: 40 km
Distance from Long Khanh station: 4 km, Dau Giay station: 8 km
From Go Dau port: 60 km, Phu My port: 65 km, Vung Tau port: 60km
Power supply:
The power supply system is taken from Long Khanh 110/22KV - 120 MVA transformer tramh invested and built by Long Khanh Electricity along the roads in the industrial park, ensuring sufficient supply for businesses and invested to the foot. factory fence.
Water supply:
Long Khanh Water Supply Joint Stock Company is responsible for providing clean water for the entire factory in the industrial park with a capacity of 8000m3/day.
Communications:
The communication system in the industrial park invested and built by Dong Nai Telecommunications, fully and quickly meets the needs of domestic and foreign communication (landline, mobile, fax, internet, etc.) ADSL ...) with high-speed transmission line, providing the Industrial Park with about 1,962 phone numbers

Drainage system:
Drainage pipes are installed along the internal traffic routes of the industrial park.
The centralized wastewater treatment plant has a capacity of 6400m3/day and night.
Traffic:
The main road is arranged with 4 lanes, the roadbed width is 40m, the internal roads have a width of 20-41.5m, meeting the standard vehicle load of 30 tons.
Investment incentives in Long Khanh industrial park
According to Decree 218/2013/ND-CP dated December 26, 2013, corporate income tax is 22%. Exemption for 02 years and 50% reduction of tax payable for the next 04 years for business income from implementing new investment projects in industrial parks. As of January 1, 2016 remaining 20%
Human resources, salaries, costs in Long Khanh industrial park
Abundant labor source with the average salary for unskilled workers is 170 USD/person/month, and for technical workers is about 250 USD/person/month.
Management costs, electricity, water, and wastewater treatment fees are calculated according to state regulations for Dong Nai city.
Evaluate
Advantage
Complete infrastructure.
Synchronized transportation system.
Convenient geographical location: near the airport, railway station, port
Name: Long Khanh Industrial Park - Dong Nai
Investor: Long Khanh Industrial Park Joint Stock Company
Code: LONGKHANH-IP-DNA - Operation period: 2008
Address: Suoi Tre and Binh Loc communes, Long Khanh town, Dong Nai province
Total area: 264ha
Workshop area: 1000m² Land: Minimum land plot:10,000 m2 Factory: Built up area:1,000m2
Construction density (%): 60 (%)
Price: 45 USD/m2 Not including VAT
Note:
Tax exemption for 02 years; 50% discount for the next 4 years (Decree 218/2013/ND-CP)
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investors | Long Khanh Industrial Park Joint Stock Company | |
| Location | Long Khanh town, Dong Nai province | |
| Acreage | total area | 264 ha |
| Factory land area | ||
| Space available | ||
| Ratio of green trees | ||
| Operating time | 50 years | |
| Current investors | ||
| Main job | Toy manufacturing industry, assembly of sports equipment; agricultural products, food, food processing, shoe manufacturing, glass manufacturing; production of construction materials and interior decoration; electronics and microelectronics, frame stamping, assembly, and manufacturing of motorbikes and accessories | |
| Occupancy | 60% | |
| LOCATION & DISTANCE: | ||
| Road | Distance from Bien Hoa city center: 40 km, Ho Chi Minh city: 70 km | |
| Air | Tan Son Nhat airport: 80 km, Long Thanh international airport: 40 km | |
| Train | Long Khanh Station: 4 km, Dau Giay Station: 8 km | |
| Sea port | Go Dau Port: 60km, Phu My Port: 65km, Vung Tau Port: 60km | |
| INFRASTRUCTURE: | ||
| Geological | Hard soil: 1,5-2,5kg/cm2 | |
| Internal traffic | Main road | Width: 41.5m, Number of lane: 4 lanes |
| Secondary branch road | Width: 20m, Number of lane: 2 lanes | |
| Electricity supply | Voltage | Power line: 110/22KV |
| Source capacity | 120 MVA | |
| Clean water | Wattage | 8000 m3/day |
| Highest capacity | ||
| Waste water treatment system | Wattage | 6400 m3/day |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 45 USD |
| Lease term | 2058 | |
| Type/Class | Level A | |
| Payment methods | 12 months | |
| Deposit | 10% | |
| Minimum area | 1ha | |
| Workshop | $3 | |
| Management fee | Management fee | 0.4 USD/m2 |
| Payment methods | yearly | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A (QCVN 40:2011/BTNMT) | |
| Other fees | Yes | |