ONG KE INDUSTRIAL PARK - DONG NAI

Project name: Ong Keo Industrial Park Investor: Tin Nghia Corporation Total area: 855.6 hectares Land area for lease: 535.3 hectares (50% occupancy rate) Location: Phuoc Khanh commune, Nhon Trach district, Dong Nai, Vietnam
GIỚI THIỆU KHU CÔNG NGHIỆP ÔNG KÈO - ĐỒNG NAI
 
Project name: Ong Keo Industrial Park
Investor: Tin Nghia Corporation
Total area: 855.6 hectares
Land area for lease: 535.3 hectares (50% occupancy rate)

Location: Phuoc Khanh commune, Nhon Trach district, Dong Nai, Vietnam

Contact the region
51km from Ho Chi Minh City center (65 minutes by car)
48km from Bien Hoa city center (80 minutes by car)
65km from Ba Ria city center (90 minutes by car)
48km from Thi Vai Port (80 minutes by car)
10.5km from Cat Lai Port (43 minutes by car)
30km from Tan Son Nhat Airport (80 minutes by car)
23.3km from Long Thanh Airport (38 minutes by car)

The infrastructure

Complete and synchronous investment infrastructure in terms of transportation systems, power supply, water supply and drainage, communications, and wastewater treatment stations:

Internal transportation system

Internal roads are designed and built to meet standards, with a width from 25m to 61m including 04 to 06 lanes, meeting the needs of transporting large tonnage container trucks.

All areas in the industrial park are linked to the internal road system, ensuring easy internal circulation.

Power supply

- Using the national grid, voltage level 22KV

- Electricity price

Normal hours: 1,555 VND/Kwh (From Monday to Saturday: 4am - 9.30am; 11:30am - 5pm; 8pm - 10pm; Sunday: 4am - 10pm).

Off-peak hours: 1,007 VND/Kwh (Weekdays: 22h - 04h).

Peak hours: 2,871 VND/Kwh (Monday to Saturday: 9:30 am - 11:30 am; 5:00 pm - 8:00 pm).

The unit price is subject to change according to the regulations of the State.

Water supply:

Nhon Trach underground water plant, capacity 20,000m3/day.

Water price: 11,500 VND/m3

In addition, the Industrial Park can also use water supplied from Thien Tan water plant, capacity of 200,000m3/day and night.

The unit price is subject to change according to the regulations of the State.

Wastewater treatment service

Wastewater treatment station with a capacity of 3,000m3/day/night (phase1)
Industrial wastewater standard: QCVN 40:2011/BTNMT.
Waste water treatment fee: $0.35/m3 (VAT not included)
The volume of wastewater is calculated as 80% of the volume of feed water
Telecommunication
- With the communication services of VNPT, FPT, Viettel.. to meet the needs of customers in the industrial park.
- Transmission speed parameters:
ADSL: maximum 8MB/s.
Fiber optic cable: maximum 90MB/s.
Warehouse and port services
- In the industrial park there is a port with a capacity of 30,000 tons, serving businesses in the industrial park, and the surrounding area is convenient for import and export of goods.
Investment costs
- Fee for using infrastructure: 130 - 160 USD/m2 until 2058 (depending on location and rented area) (VAT not included - 10%)
- Land rental: from 15,000 to 20,000 VND/m2/year (determined by the State from time to time) (Not subject to VAT)
- Management fee: 1.0 USD/m2/year (VAT not included – 10%)
Industries attracting investment:
​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​ Chemicals (excluding base chemicals); Medicine; Cosmetics; Food;
Power generation, Post and telecommunications, Mechanical engineering; paper manufacturing industry (excluding the pulp export process);
Plastic and rubber production (excluding latex processing);
Building materials; Textiles (not dyed); Leather shoes (no tanning);
Service industries,...
For detailed information, please refer to the parameter table below.
Category Detail
OVERVIEW: 
Infrastructure investors CREDITS CORPORATION
Location Phuoc Khanh commune, Nhon Trach district, Dong Nai province
Acreage total area 856 ha
Factory land area  
Space available  
Ratio of green trees 19%
Operating time 50 years
Current investors Sun Steel VN Co., Ltd., Sanrimjohap Vina Co., Ltd.,…
Main job Production and processing of lubricants, gas, liquefied petroleum gas; chemistry; medicine; cosmetics; food; electricity production, post and telecommunications, mechanical engineering; paper production industry; plastic and rubber production; building materials; textiles); leather shoes;…
Occupancy 50%
LOCATION & DISTANCE: 
Road 51km from Ho Chi Minh City center, 48km from Bien Hoa City center, 65km from Ba Ria City center
Air Tan Son Nhat Airport: 30 km, Long Thanh International Airport: 23.3 km
Train Saigon Station: 20 km
Sea port From Cat Lai Port: 11km, Thi Vai Port 48km
INFRASTRUCTURE: 
Geological Hard soil: 1,5-2,5kg/cm2
Internal traffic Main road 6 lanes
Secondary branch road 2 lanes
Electricity supply Voltage : 110/22KV
Source capacity  
Clean water Wattage 20000m3/day
Highest capacity 200000m3/day
Waste water treatment system Wattage 3000m3/day and night
Internet and telecommunications Communication services of VNPT, FPT, Viettel... meet the needs of customers in industrial parks
LEASING PRICE: 
Land Land rents 130-160 USD/m2 ( Tùy vị trí )
Lease term 2058
Type/Class Level A
Payment methods flexible
Deposit 10%
Minimum area 1ha
Workshop $5
Management fee Management fee 1 USD/m2
Payment methods annual
Electricity price Peak 0.12 USD
Normal 0.67 USD
Idle 0.044 USD
Payment methods Monthly
Supplier EVN
Price of clean water Water price 0.5USD/m3
Payment methods Monthly
Water supplier Nhon Trach water factory
Wastewater fee Price 0.35 USD/m3
Payment methods hàng tháng
Water quality before treatment Level B
Water quality after treatment Level A (QCVN 40:2011/BTNMT)
Other fees yes
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook