Xuan Loc Industrial Park was started construction in 2005 in Xuan Loc district, Dong Nai province. Xuan Loc Industrial Park has a great advantage in transporting goods with its location next to National Highway 1, the Northern arterial traffic axis. – South of Vietnam
XUAN LOC INDUSTRIAL PARK - DONG NAI
Xuan Loc Industrial Park was started construction in 2005 in Xuan Loc district, Dong Nai province. Xuan Loc Industrial Park has a great advantage in transporting goods with its location next to National Highway 1, the Northern arterial traffic axis. – South of Vietnam and quite close distance from Xuan Loc Industrial Park to locations such as Gia Ray railway station, Ho Chi Minh City - Dau Giay - Long Thanh expressway and Phu My port.
Location: Xuan Tam and Xuan Hiep communes, Xuan Loc district, Dong Nai province
The operating lease term of the industrial park is until June 1, 2056.
Master plan of Xuan Loc Industrial Park:
Industries attracting investment:
Woven (not dyed); Garment; Footwear;
Electronic; Plastic product; Packaging; High quality wooden furniture;
Processing agricultural and forestry products; Agricultural medicine; Medicine; High quality construction materials;
Medical instruments; Sport equipment; Teaching equipment.
GEOGRAPHICAL LOCATION

Xuan Loc Industrial Park is located next to National Highway 1, the North - South arterial traffic axis, near the Ho Chi Minh City - Dau Giay - Long Thanh highway and Phu My port.
Distance to Long Khanh town: 20 km
Distance to City Expressway. Ho Chi Minh – Long Thanh – Dau Giay: 35 km
Distance to Bien Hoa city: 90 km
Distance to Ho Chi Minh City: 110 km
Port:
Distance to Phu My Port: 70 km
Distance to Go Dau Port: 73 km
Distance to Cai Mep port: 98 km
Distance to Cat Lai Port: 108 km
Airport:
Distance to Tan Son Nhat Airport: 114 km
Distance to Long Thanh Airport: 77 km
THE INFRASTRUCTURE

Traffic system
- Main axis system: Located along the main axis of National Highway 1, North-South traffic artery;
- Internal transportation system:
Load capacity from H18 – H30.
Road surface structure: Asphalt concrete
Roadbed from 7.5 - 17 m, 2-lane main road.
Sidewalks are 8 - 12 m wide
Rainwater and wastewater drainage systems are arranged along both sides of the road.
Water supply
Provided by Dong Nai Water Supply Company
Power supply
Electricity supplier from national power lines from 50 MVA lines and 22kV grid lines
Telecommunications system
Complete the system of technology corridors for telecommunications
Sewerage system
Capacity: 1,000 m3/day and night, biotechnology combined with physical chemistry
Wastewater after treatment: applies standards QCVN 40:2011/BTNMT, Colume A.
INVESTMENT COSTS
Land rental fee: includes land sublease fee, industrial space use fee and management fee.
Land sublease: according to Government regulations. Payment term: annually.
Industrial space use fee: One-time payment for the entire lease term until 2056: 1,628,200 VND/m2 (USD 70/m2)
Management fee: 16,282 VND/m2/year (» 0.7 USD/m2/year). Payment term: annually.
Water price:
Production agency: 11,500 (VND/m3)
Service businesses: 17,800 (VND/m3)
Electricity price: Current applicable price: details in Decision No. 4495/QD-BCT dated November 30, 2017 of the Minister of Industry and Trade.
Wastewater treatment fee (excluding VAT): Current fee is 0.35 USD/m3
(The above water price list does not include VAT and environmental protection fees for domestic wastewater)
INVESTMENT INCENTIVES
Corporate income tax
- Tax rate: 20%
100% tax exemption for the first 2 years
50% reduction in the next 4 years
Applicable to business income from implementing new investment projects in industrial parks
- Tax rate of 10% for 15 years
100% tax exemption for the first 4 years
50% reduction in the next 9 years
Applicable to establishing new businesses from investment projects in the following fields:
High technology as prescribed by law; scientific research and technological development;
Production of software products;
Prioritize the development and support of the manufacturing industry.
MINIMUM WAGE COST
The minimum wage cost in 2019 is Region 2, applicable in 2021 is 3,920,000 VND/month (168 USD/month) and is regulated according to Government regulations.
For detailed information, please refer to the parameter table below.
| Category |
Detail |
| OVERVIEW: |
| Infrastructure investor |
Sonadezi Long Binh Joint Stock Company |
| Location |
Xuan Tam and Xuan Hiep communes, Xuan Loc district, Dong Nai province |
| Acreage |
total area |
108ha |
| Factory land area |
|
| Vacant area |
|
| Ratio of green trees |
13% |
| Operating time |
50 years |
| Current investors |
|
| Main job |
Production of consumer goods; agricultural and forestry product processing (no starch processing); producing high-quality construction materials; production of agricultural chemicals, medical equipment and tools, drugs; manufacturing packaging and high-quality wooden furniture |
| Occupancy |
80,76% |
| LOCATION & DISTANCE: |
| Road |
110 km from Ho Chi Minh City, 90 km from Bien Hoa City |
| Air |
114 km from Tan Son Nhat airport, 77 km from Long Thanh airport |
| Train |
Have |
| Sea port |
Cat Lai port 108 km, Cai Mep port 98 km |
| INFRASTRUCTURE: |
| Geological |
Hard soil: 1,5-2,5kg/cm2 |
| Internal traffic |
Main road |
with 4 lanes |
| Secondary branch road |
with 2 lanes |
| Electricity supply |
Voltage |
110/22KV |
| Source capacity |
25MVA |
| Clean water |
Wattage |
7000 m3/day and night |
| Highest capacity |
|
| Waste water treatment system |
Wattage |
5600 m3/day and night |
| Internet and telecommunications |
ADSL, Fireber , VNPT, Viettel |
| LEASING PRICE: |
| Land |
Land rents |
70 USD |
| Rental term |
2056 |
| Type/Class |
Level A |
| Payment methods |
12 tháng |
| Deposit |
0.1 |
| Minimum area |
1ha |
| Workshop |
3 |
| Management fee |
Management fee |
0.4 USD/m2 |
| Payment methods |
hàng năm |
| Electricity price |
Peak |
0.12 USD |
| Normal |
0.067USD |
| Idle |
0.04 USD |
| Payment methods |
hàng tháng |
| Supplier |
EVN |
| Price of clean water |
Water price |
0.5 USD/m3 |
| Payment methods |
Monthly |
| Water supplier |
Charged by Gov. suppliers |
| Wastewater fee |
Price |
0.32 USD/m3 |
| Payment methods |
hàng tháng |
| Water quality before treatment |
Loại B |
| Water quality after treatment |
Loại A (QCVN 40:2011/BTNMT) |
| Other fees |
yes |