CAI MEP INDUSTRIAL PARK - VUNG TAU

Cai Mep Industrial Park was established under Decision No. 399/2002/QD-TTg dated May 10, 2002 of the Prime Minister with a scale of 670 hectares in Phuoc Hoa commune, Tan Thanh district, Ba Ria - Vung Tau province.

General information about Cai Mep Industrial Park

Cai Mep Industrial Park was established under Decision No. 399/2002/QD-TTg dated May 10, 2002 of the Prime Minister with a scale of 670 hectares in Phuoc Hoa commune, Tan Thanh district, Ba Ria - Vung Tau province. Now Phuoc Hoa and Tan Phuoc Wards, Phu My Town, Ba Ria - Vung Tau Province, the industrial park's operating term ends on May 10, 2052.
On October 27, 2005, the Ministry of Construction approved the Planning of Cai Mep Industrial Park according to Decision No. 2005/QD-BXD.

Accordingly, the area of industrial land for lease on the total area of the entire area is 462.5352 hectares, the goal of attracting investment in projects in heavy industrial fields that need specialized ports such as: gas processing industry , Petroleum; Metallurgical; mechanical manufacturing industries; maritime transportation services; Food Processing

Cai Mep Industrial Park has an extremely convenient location in terms of traffic:

+ Adjacent to Mo Nhat, Cai Mep, Thi Vai rivers, adjacent to Rach Ong

+ The north is adjacent to Phu My II Industrial Park

+ Adjacent to Cai Mep deep-water port

+ 47 km from Long Thanh International Airport

+ 70 km from Ho Chi Minh City and 40 km from Vung Tau city

Infrastructure of Cai Mep Industrial Park

Power supply system: Electricity produced in Cai Mep Industrial Park is supplied through a 110KV/ 22KV line connected from the National grid.

Water supply system: Clean water is supplied from Toc Tien water plant through pipeline D300-D500

Wastewater treatment system: According to design, the Industrial Park has two wastewater treatment stations in the North and South areas with treatment capacities of 7,500 m3 and 5,500 m3/day and night, respectively. Phase 1 of the North Division's wastewater treatment system has been put into operation with a capacity of 4,000 m3/day and night, capable of treating wastewater with input standards reaching column B according to environmental technical regulations. of Vietnam

Internal roads: Main roads and branch roads in Cai Mep Industrial Park have widths of 19.5 m, 24m, 35m, are designed with many lanes, meeting the transportation capacity in the area well.

Industrial gas supply system: There is a gas supply system available for customers who need to use gas
Other infrastructure facilities: The rainwater drainage system is designed with sewer lines sized D500-D1500, communication and fire protection systems are ready to connect and serve.

Land rental costs at Cai Mep Industrial Park

Infrastructure usage fee: 80 USD/m2/lease term

Maintenance fee for industrial park infrastructure: 0.5 USD/m2/year

Wastewater treatment fee: 0.5 USD/m3

Electricity supply price: According to regulations of the Ministry of Industry and Trade

Clean water supply price: According to regulations of the People's Committee of Ba Ria - Vung Tau province

Note: The above prices do not include VAT and may change depending on the rental time

Current status of investment attraction in Cai Mep Industrial Park

Currently, Cai Mep Industrial Park has leased an area of over 150 hectares, reaching an occupancy rate of about 60% (The rental area does not include the area of 04 projects that were in operation before the establishment of the Industrial Park, then merged into Cai Mep Industrial Park). Some typical large projects include the 28.1 hectare Interflour Flour Milling Factory project; LPG gas liquefaction plant project and Condensate's project with a scale of 40.8 hectares, AGC Vietnam Co., Ltd.'s project...

Category Detail
OVERVIEW: 
Infrastructure investor Saigon Construction Corporation
Location Tan Thanh, Ba Ria - Vung Tau
Acreage total area 670
Factory land area 462.5
Vacant area  
Ratio of green trees  
Operating time 2002
Current investors  
Main job  
Occupancy 70%
LOCATION & DISTANCE: 
Road To Ho Chi Minh City 60km
Air To International Airport Long Thanh 45km
Train To Station Bien Hoa 55km
Sea port To Seaport Phu My 1km
INFRASTRUCTURE: 
Geological  
Internal traffic Main road  
Secondary branch road  
Electricity supply Voltage 110/22 KV
Source capacity 64MVA
Clean water Wattage  
Highest capacity 60000m3/ngày đêm
Waste water treatment system Wattage 8000m3/ngày đêm
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE: 
Land Land rents 65 USD
Rental term  
Type/Class  
Payment methods  
Deposit  
Minimum area  
Workshop Factory rental price  
Rental term  
Type/Class  
Payment methods  
Scale of factories  
Deposit  
Minimum area  
Management fee Management fee 0.35 USD/m2
Payment methods Hàng năm
Electricity price Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Payment methods EVN
Price of clean water Water price 0.4 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.28 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A
Other fees Insurance: yes
Bảo hiểm: có
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook