Cai Mep Industrial Park was established under Decision No. 399/2002/QD-TTg dated May 10, 2002 of the Prime Minister with a scale of 670 hectares in Phuoc Hoa commune, Tan Thanh district, Ba Ria - Vung Tau province. Now Phuoc Hoa and Tan Phuoc Wards, Phu My Town, Ba Ria - Vung Tau Province, the industrial park's operating term ends on May 10, 2052.
On October 27, 2005, the Ministry of Construction approved the Planning of Cai Mep Industrial Park according to Decision No. 2005/QD-BXD.

Accordingly, the area of industrial land for lease on the total area of the entire area is 462.5352 hectares, the goal of attracting investment in projects in heavy industrial fields that need specialized ports such as: gas processing industry , Petroleum; Metallurgical; mechanical manufacturing industries; maritime transportation services; Food Processing

+ Adjacent to Mo Nhat, Cai Mep, Thi Vai rivers, adjacent to Rach Ong
+ The north is adjacent to Phu My II Industrial Park
+ Adjacent to Cai Mep deep-water port
+ 47 km from Long Thanh International Airport
+ 70 km from Ho Chi Minh City and 40 km from Vung Tau city
Power supply system: Electricity produced in Cai Mep Industrial Park is supplied through a 110KV/ 22KV line connected from the National grid.
Water supply system: Clean water is supplied from Toc Tien water plant through pipeline D300-D500

Wastewater treatment system: According to design, the Industrial Park has two wastewater treatment stations in the North and South areas with treatment capacities of 7,500 m3 and 5,500 m3/day and night, respectively. Phase 1 of the North Division's wastewater treatment system has been put into operation with a capacity of 4,000 m3/day and night, capable of treating wastewater with input standards reaching column B according to environmental technical regulations. of Vietnam
Internal roads: Main roads and branch roads in Cai Mep Industrial Park have widths of 19.5 m, 24m, 35m, are designed with many lanes, meeting the transportation capacity in the area well.
Industrial gas supply system: There is a gas supply system available for customers who need to use gas
Other infrastructure facilities: The rainwater drainage system is designed with sewer lines sized D500-D1500, communication and fire protection systems are ready to connect and serve.
Infrastructure usage fee: 80 USD/m2/lease term
Maintenance fee for industrial park infrastructure: 0.5 USD/m2/year
Wastewater treatment fee: 0.5 USD/m3
Electricity supply price: According to regulations of the Ministry of Industry and Trade
Clean water supply price: According to regulations of the People's Committee of Ba Ria - Vung Tau province
Note: The above prices do not include VAT and may change depending on the rental time
Currently, Cai Mep Industrial Park has leased an area of over 150 hectares, reaching an occupancy rate of about 60% (The rental area does not include the area of 04 projects that were in operation before the establishment of the Industrial Park, then merged into Cai Mep Industrial Park). Some typical large projects include the 28.1 hectare Interflour Flour Milling Factory project; LPG gas liquefaction plant project and Condensate's project with a scale of 40.8 hectares, AGC Vietnam Co., Ltd.'s project...
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | Saigon Construction Corporation | |
| Location | Tan Thanh, Ba Ria - Vung Tau | |
| Acreage | total area | 670 |
| Factory land area | 462.5 | |
| Vacant area | ||
| Ratio of green trees | ||
| Operating time | 2002 | |
| Current investors | ||
| Main job | ||
| Occupancy | 70% | |
| LOCATION & DISTANCE: | ||
| Road | To Ho Chi Minh City 60km | |
| Air | To International Airport Long Thanh 45km | |
| Train | To Station Bien Hoa 55km | |
| Sea port | To Seaport Phu My 1km | |
| INFRASTRUCTURE: | ||
| Geological | ||
| Internal traffic | Main road | |
| Secondary branch road | ||
| Electricity supply | Voltage | 110/22 KV |
| Source capacity | 64MVA | |
| Clean water | Wattage | |
| Highest capacity | 60000m3/ngày đêm | |
| Waste water treatment system | Wattage | 8000m3/ngày đêm |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 65 USD |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Deposit | ||
| Minimum area | ||
| Workshop | Factory rental price | |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Scale of factories | ||
| Deposit | ||
| Minimum area | ||
| Management fee | Management fee | 0.35 USD/m2 |
| Payment methods | Hàng năm | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Payment methods | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A | |
| Other fees | Insurance: yes | |
| Bảo hiểm: có |