Hoa Binh Industrial Park was formerly known as Hoa Binh Industrial Cluster (renamed from Nhi Thanh Industrial Cluster according to Investment Certificate No. 50121000065, first issued on September 10, 2008), approved by the Economic Zone Management Board. Long An issued Investment Certificate No. 50221000262 dated August 4, 2011 to Hoa Binh Infrastructure Construction Investment Joint Stock Company with a total investment capital of 592 billion VND on a planned land area of 117.67 hectares, of which the area of industrial land for lease is 86.18 hectares.
.jpg)
The industrial park is located in the administrative boundaries of Nhi Thanh commune, Thu Thua district, Long An province, serving as an important traffic gateway connecting Ho Chi Minh City with the provinces of the Mekong Delta and the Southwest, connecting Convenient transportation connection to important transportation routes and central areas:
+ 22 km from Ho Chi Minh City
+ 35 km from Tan Son Nhat airport
+ 47 km from Cat Lai Port
+ 5 km from Bourbon Port - Ben Luc
In terms of nature, Hoa Binh Industrial Park is a multi-industry industrial park, which focuses on attracting investment in a number of main areas including: Electronics and telecommunications manufacturing industry; Food Processing; Production of pharmaceutical and cosmetic products; Garment production and mechanical engineering.
Power supply system: Power produced at Hoa Binh Industrial Park is guaranteed to be provided by the national grid through Thu Thua 110kV/22kV transformer station with a capacity of 2x25 MVA
.jpg)
Water supply system: Sourced from Binh Anh water supply plant with total capacity of 60,000 m3/day and night, under the management of Long An Water Supply Joint Stock Company
Wastewater treatment system: Hoa Binh Industrial Park is invested in building a centralized wastewater treatment station with a treatment capacity of 4,000 m3/day and night, which can treat wastewater to standard A according to environmental standards. of Vietnam
Communication system: Invested in underground construction, ready to connect to each land lease location in the Industrial Park
Road system: The road system within the industrial park is invested synchronously and completely, directly connecting to Provincial Road 818 and only about 500m from the National Highway 1A intersection, creating a convenient traffic connection. benefit other localities and the central area.
Infrastructure usage fee: 155-168 USD/m2/depending on land lot location
Management fee: 900 VND/m2/month
Annual land use fee: According to regulations of Long An Provincial People's Committee
Clean water price: 11,750 VND/m3. Changed according to the water supply tariff of Long An Water Supply Joint Stock Company
Wastewater treatment fee: 7,330 VND/m3, varies depending on receiving wastewater conditions
Electricity supply price: According to EVN's prescribed price + 10% surcharge for industrial park management fee (in case of factory rental)
Note: The above prices do not include VAT and are subject to change without prior notice
Investment incentives: 100% corporate income tax exemption for the first 02 years, 50% tax reduction for the next 04 years
After more than 10 years of operation, Hoa Binh Industrial Park has built complete infrastructure and leased out with over 32 domestic and foreign capital investment projects, achieving an occupancy rate of over 89%. the entire industrial park area with a series of typical projects such as the keychain manufacturing and processing project of ASG Global Co., Ltd. (Korea); Pharmaceutical production project of Viet Pharmaceutical Joint Stock Company (Viet Dong Duoc); Suitcase and handbag production project of JS Vina Company Limited (Korea); Footwear accessories production project of Force Tech Co., Ltd. (China) and a series of other projects
| Hạng mục | Chi tiết | |
|---|---|---|
| OVERVIEW: | ||
| Nhà đầu tư hạ tầng | Công ty cổ phần đầu tư xây dựng hạ tầng Hòa Bình | |
| Địa điểm | ||
| Diện tích | Tổng diện tích | |
| Diện tích đất xưởng | ||
| Diện tích còn trống | ||
| Tỷ lệ cây xanh | ||
| Thời gian vận hành | ||
| Nhà đầu tư hiện tại | Công ty cổ phần đầu tư xây dựng hạ tầng Hòa Bình | |
| Ngành nghề chính | ||
| Tỷ lệ lấp đầy | 89% | |
| LOCATION & DISTANCE: | ||
| Đường bộ | Cách thành phố Hồ Chí Minh 22 km | |
| Hàng không | Cách sân bay Tân Sơn Nhất 35 km | |
| Xe lửa | ||
| Cảng biển | Cách Cảng Cát Lái 47 km, Cách Cảng Bourbon - Bến Lứt 5 km | |
| INFRASTRUCTURE: | ||
| Địa chất | ||
| Giao thông nội khu | Đường chính | |
| Đường nhánh phụ | ||
| Nguồn điện | Điện áp | 110kV/22kV |
| Công suất nguồn | 2x25 MVA | |
| Nước sạch | Công suất | 60.000 m3/ngày đêm |
| Công suất cao nhất | ||
| Hệ thống xử lý nước thải | Công suất | 4.000 m3/ngày đêm |
| Internet và viễn thông | ||
| LEASING PRICE: | ||
| Đất | Giá thuê đất | |
| Thời hạn thuê | ||
| Loại/Hạng | ||
| Phương thức thanh toán | ||
| Đặt cọc | ||
| Diện tích tối thiểu | ||
| Xưởng | Giá thuê xưởng | |
| Thời hạn thuê | ||
| Loại/Hạng | ||
| Phương thức thanh toán | ||
| Scale of factory | ||
| Đặt cọc | ||
| Diện tích tối thiểu | ||
| Phí quản lý | Phí quản lý | 900 VNĐ/m2/tháng |
| Phương thức thanh toán | ||
| Giá điện | Giờ cao điểm | |
| Bình thường | ||
| Giờ thấp điểm | ||
| Phương thức thanh toán | ||
| Nhà cung cấp | ||
| Giá nước sạch | Giá nước | 11.750 VNĐ/m3 |
| Phương thức thanh toán | ||
| Nhà cung cấp nước | ||
| Phí nước thải | Giá thành | 7.330 VNĐ/m3 |
| Phương thức thanh toán | ||
| Chất lượng nước trước khi xử lý | ||
| Chất lượng nước sau khi xử lý | ||
| Phí khác |
||