LONG HAU INDUSTRIAL PARK - LONG AN

Long Hau Industrial Park was formed in 2006. Up to now, the Industrial Park has attracted 172 investors from countries such as Japan, Korea, America, Malaysia, etc. with diverse industries such as mechanical engineering, construction materials. , fashion, pharmaceuticals, cold storage, food, etc.

OVERVIEW OF LONG HAU INDUSTRIAL PARK - LONG AN

Long Hau Industrial Park was formed in 2006. Up to now, the Industrial Park has attracted 172 investors from countries such as Japan, Korea, America, Malaysia, etc. with diverse industries such as mechanical engineering, construction materials. , fashion, pharmaceuticals, cold storage, food, etc.

With strategic location:

SPCT port cluster system 3km (can accommodate ships of 54,000 tons),

Ben Luc-Long Thanh Expressway 5km,

12km from Phu My Hung urban area,

District 1 Center: 19km;

Tan Son Nhat Airport: 21km;

Investing in Long Hau Industrial Park helps customers easily connect the technical and social infrastructure of Ho Chi Minh City and save maximum time transporting goods from the Western to Eastern provinces.

The infrastructure in the area is complete and has been put into operation, including: water supply plant, wastewater treatment plant, power station in the area, supermarket, polyclinic, accommodation area for workers, and customs. Many conveniences for customers during the operation.

In addition, the Industrial Park is currently operating according to ISO 14001:2015 certification for environmental quality management and ISO 9001:2015 product quality management to bring customers products and environments with many green areas. meet standards to contribute to increasing product value for customers.

Category Detail
OVERVIEW: 
Infrastructure investor  
Location  
Acreage total area 425
Factory land area  
Vacant area  
Ratio of green trees  
Operating time 50 years
Current investors  
Main job Food and seafood processing; supporting industry; logistics; logistics; high technology, R&D; mechanical assembly, precision mechanics, machinery and equipment; Production of building materials; Production and processing of some less toxic chemicals
Occupancy 90%
LOCATION & DISTANCE: 
Road 20km from Ho Chi Minh City
Air 25km from Tan Son Nhat international airport
Train 20km from Saigon station
Sea port 3km from Hiep Phuoc port, 25km from Cat Lai port
INFRASTRUCTURE: 
Geological Hard soil: 1,5-2,5kg/cm2
Internal traffic Main road Number of lane: 4 lanes
Secondary branch road Number of lane: 2 lanes
Electricity supply Voltage Power line: 110/22KV
Source capacity 37 MWA
Clean water Wattage 10.000m3/day
Highest capacity  
Waste water treatment system Wattage 5.000m3/day
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE: 
Land Land rents 100 USD
Rental term  
Type/Class Level A
Payment methods 12 months
Deposit 10%
Minimum area 1ha
Workshop $3
Management fee Management fee 0.4 USD/m2
Payment methods yearly
Electricity price Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Supplier EVN
Price of clean water Water price 0.4 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price 0.28 USD/m3
Payment methods Monthly
Water quality before treatment Level B
Water quality after treatment Level A (QCVN 40:2011/BTNMT)
Other fees Yes
RELATED NEWS
Zalo Zalo:0901.815.069 Zalo
Hotline:0901.815.069
Send SMS SMS: >Nhắn tin Facebook Nhắn tin Facebook