Vinh Loc 2 Industrial Park (Vinh Loc Ben Luc Industrial Park) is located close to National Highway 1 in Voi La hamlet, Long Hiep commune, Ben Luc district, Long An province.
.jpg)
Vinh Loc 2 Industrial Park has a planning area of phase one of 561.5 hectares, divided into two phases:
Phase 1 is 259.8 hectares, including 225.98 hectares of industrial land and 33.6 hectares of residential land. Phase 2 is planned to expand an additional 301.7 hectares
Vinh Loc 2 Industrial Park is invested by an experienced investor who has successfully developed Vinh Loc Industrial Park (Vinh Loc 1 Industrial Park) in Ho Chi Minh City with the Vinh Loc Industrial Park project, 207 hectares, 100% occupancy rate in Binh Tan District, Ho Chi Minh City
Location of Vinh Loc 2 Industrial Park - Long An
Vinh Loc 2 Industrial Park has a convenient location, located at Highway 1A KM No. 1929, 1930, Voi La hamlet, Long Hiep commune, Ben Luc district, Long An province, bordering Binh Chanh district, Ho Chi Minh City:
- 25km from Ho Chi Minh City
- Tan Son Nhat International Airport - Ho Chi Minh City 28km
- 26.6 km from Saigon station
- 27.5 km from Saigon - Ho Chi Minh City Port, 04km from Ben Luc Long An Port
- 22km from Phu My Hung urban area - Ho Chi Minh City
Ben Luc 2 Industrial Park is built on land with flat terrain, the foundation has quite good load-bearing capacity, and the infrastructure system is being completed including:
- Traffic: All internal roads in the industrial park are planned in accordance with the requirements of industrial park standard procedures (from 2 to 4 lanes for large vehicles), hot asphalt concrete roads, main roads with highways. width from 30-47m, side road width from 8-16m, wide sidewalks with trees and shade.
![]()
- Electricity distribution system:
Phase 1: Power is supplied from the National grid through Go Den power station (110/22KV) to serve all electrical purposes of the Enterprise: production, business, living, lighting. bright …..
- Phase 2: Power is supplied from the Industrial Park's internal power station (110/22KV) to meet the electricity needs of all businesses operating in the Park, serving public lighting and the power needs of the Area. resettled population and worker accommodation.
- Water supply: Phase 1: capacity 5,000 - 7,000 m3/day.night supplied from Go Den water plant. Phase 2: capacity of 7,000 - 12,000 m3/day.night is provided from the water exploitation and treatment station of Vinh Loc 2 industrial park and parallel to the station from Go Den will follow the water supply pipeline of the industrial park to Take advantage of the rented land and rented factory of the factory to ensure adequate supply of quality water for investors renting land in the industrial park.
- Wastewater treatment: Vinh Loc 2 Industrial Park has built a wastewater treatment plant with a total design capacity of 8,000m3/day and night. Meets industrial wastewater standards QCVN 24:2009/BTNMT, column A.
- Communication system: complete, capable of synchronous connection with national and international telecommunications networks, communication systems, and high-speed internet connections.
Some main industries are encouraged to attract investors in Vinh Loc Ben Luc Industrial Park, Long An province
- Garment and garment industry accessories
- Knitting, production of consumer goods, plastics, chemicals, school - medical equipment & tools, household goods, pharmaceuticals - medicinal herbs, cosmetics, footwear (making & processing);
- Electricity, refrigeration, electronics, telecommunications equipment, information technology;
- Precision mechanics - CNC, machine manufacturing mechanics, agricultural mechanics, printing, mold processing;
- Processing, agricultural, forestry and seafood products, food, animal feed, food, beverages, confectionery;
- Production of light materials, interior decoration, wood - sophisticated fine arts, construction materials, packaging (paper, plastic, glass...).
- Nguyen Minh Steel Company Limited, Nam Hung Steel Company
- HURO PROBIOTICS JOINT STOCK COMPANY,
- W&W TEXTILE JOINT STOCK COMPANY,
- Western Bibica Confectionery Company,
- AGRIUM FERTILIZER COMPANY - CANADA
Costs for renting land and factories in Vinh Long 2 Industrial Park
- All land lots in Vinh Long 2 Industrial Park are planned to be built adjacent to at least 2 roads: 1 main road (road width from 30 - 47m) and 1 secondary road (road width from 8 - 16m); Very convenient for transportation of large vehicles, emergency exits and construction of technical infrastructure projects of the enterprise.
- Land rental price with infrastructure: 55-70 USD / m 2 of land for rent with a minimum of 1 hectare
- Factory rental price from: 5-8USD/m2 month
- Electricity and water production prices: according to current regulations of Long An Provincial People's Committee
- Labor salary in 2019: refer to labor recruitment unit price in Long An province and Ho Chi Minh City: 200-350 USD/person/month
- Management fee: 0.4 USD/m2/year
Some tax incentives and other incentives for investors when establishing new projects in industrial parks
• Tax exemption for 02 years; 50% discount for the next 4 years
• The rate of planning for the construction of infrastructure and public utilities is high (34.46%) including roads, green land, water supply and drainage ditch systems, commercial centers, offices,...
• High factory construction density up to (70%); The maximum building height of the factory is 5 floors, the warehouse area is 4 floors.
• Flexible pricing policy and payment methods.
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | Vinh Loc Industrial Park Investment & Construction Joint Stock Company - Ben Luc | |
| Location | Voi La Hamlet, Long Hiep Commune, Ben Luc District, Long An Province | |
| Acreage | total area | 561,5 ha |
| Factory land area | 225 hectares (phase 1) | |
| Vacant area | 100 ha | |
| Ratio of green trees | ||
| Operating time | 50 years | |
| Current investors | Nguyen Minh Steel Company, HURO PROBIOTICS JOINT STOCK COMPANY, W&W TEXTILE JOINT STOCK COMPANY, Western Bibica, AGRIUM FERTILIZER- CANADA | |
| Main job | Garment and garment accessories, Knitting, consumer goods production, plastics, chemicals, school - medical equipment & tools, household goods, pharmaceuticals - medicinal materials, cosmetic chemicals, footwear (building & processing); Electricity, refrigeration, electronics, telecommunications equipment, | |
| Occupancy | 50% | |
| LOCATION & DISTANCE: | ||
| Road | To Ho Chi Minh City: 30 km | |
| Air | To Tan San Nhat: 28 km | |
| Train | Yes | |
| Sea port | From Saigon port: 27 km, Bourbon port (Ben Luc): 4 km | |
| INFRASTRUCTURE: | ||
| Geological | Hard soil: 1,5-2,5kg/cm2 | |
| Internal traffic | Main road | Width: 47&30m, Number of lane: 4 lanes |
| Secondary branch road | Width: 20&8m, Number of lane: 2 lanes | |
| Electricity supply | Voltage | Power line: 110/22KV |
| Source capacity | ||
| Clean water | Wattage | 5.000 m3/nday |
| Highest capacity | 12.000 m3/day | |
| Highest capacity | Wattage | 8.000 m3/day |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 55-70 USD |
| Rental term | 2061 | |
| Type/Class | Level A | |
| Payment methods | 12 months | |
| Deposit | 10% | |
| Minimum area | 1ha | |
| Workshop | $5 | |
| Management fee | Management fee | 0.4 USD/m2 |
| Payment methods | yearly | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A (QCVN 40:2011/BTNMT) | |
| Other fees | Yes | |