Hai Son - Duc Hoa Dong industrial cluster has a total area of 261 hectares. With the advantage of competitive prices, reputation, experience, meticulous investment infrastructure, and convenient traffic location adjacent to Ho Chi Minh City, the industrial cluster attracts 55 operating businesses, achieving a revenue of 1,500 billion VND. copper.
The investor of the Industrial Cluster is Hai Son Company Limited. Hai Son Co., Ltd. was established in 2003 and is managed by Mr. Trinh Van Hai - General Director. After nearly 20 years of construction and development, Hai Son Group has now become a strong brand in the field of Investment - Exploitation - Construction of industrial parks and residential areas.

During the process of formation and development, the corporation invested and established member companies. To date, Hai Son Group's ecosystem has more than 10 member companies and affiliated companies to serve the company's operations.
With the motto "Quality and Friendliness", Hai Son Group always puts customers' interests first. The company's operating policies and principles always aim at a single goal: to bring customers the best products. sustainable and long-term value.
The total area of the Industrial Cluster is 261,215 hectares, of which:
Factory and warehouse land: 70%
Traffic land: 13%
Green land, water surface: 12%
Technical zones and other works: 5%
Strengths:
- Very good geology including soil, clay, gravel, under the foundation, so investment costs to build factories are reduced, 30% lower than other areas.
- Complete waste treatment system.
- Bordering Ho Chi Minh City, convenient for transportation of goods.
- Complete infrastructure, factory can be built immediately.
- The main road leading into the industrial park is 26 m wide, including the sidewalk, both sides of the sidewalk have shady trees, and the side roads are 22 m wide.
- Stable power supply (responsible for Duc Hoa Electricity)
- Belongs to Duc Hoa Dong commune - Duc Hoa district - Long An province.
- Long An is a land with a strategic economic location:

It is a buffer zone between the East and the Southwest
It is the economic gateway of the Mekong Delta region
The area is near important traffic intersections from the city. Ho Chi Minh City to the Western provinces
- In Long An province, as of early 2020, there were 1,009 projects with a total registered capital of 6.15 billion USD
- In the city's economic and social development strategies. Ho Chi Minh City in the coming time will aim to consider Long An as a satellite urban area of the City. Ho Chi Minh City, economic development in parallel with the city. HCM
- Long An is located in the golden triangle area, welcoming the city's population expansion trend. Ho Chi Minh City along with Binh Duong and Dong Nai. In the coming years, Long An will become one of the three industrial centers of the South
- Projects that have been and are being implemented include:
Expanding and upgrading National Highway 1A, National Highway 50, National Highway 62, National Highway N2 (from Cu Chi throughout Dong Thap Muoi region)
Ben Luc - Long Thanh Expressway connects Long An with Hiep Phuoc, Cat Lai, Cai Mep - Thi Vai port systems and Long Thanh airport
Expanding and upgrading DT 830 (dynamic axis of Ho Chi Minh City - Tien Giang - Long An)
Long An International Port
- Long An will develop 3 specialized industrial areas: Duc Hoa, Can Giuoc, Ben Luc to serve planning and relocation of manufacturing factories to 1 area for management. In addition, Long An province also applies industrial land planning in parallel with residential and service industries...
- Among them, Duc Hoa district is positioned as the center for developing supporting industries and processing
Understanding and appreciating the importance of the industrial real estate industry in Long An, Hai Son Group's Board of Directors has boldly invested and developed many projects in the province over the past many years. Hai Son Group always determines the direction of long-term development, investing in sustainable values and being responsible to the community.
Distance to key traffic hubs
From National Highway 1A: 11km
From Ho Chi Minh City center: 17 km
From Tan Son Nhat International Airport: 25 km
From Duc Hoa Town center: 3 km
Saigon Port: 28km
Saigon Station: 24km
4 km from Vam Co Dong river
Hai Son Industrial Park is connected to important traffic roads such as: National Highway 1A, Xuyen A Road, Saigon - Trung Luong Expressway, Provincial Roads 825, 830... Waterway traffic is very convenient for transporting goods, supplies from the Industrial Park to the Ports, neighboring provinces and Cambodia.
Traffic system

- Main road:
Hai Son - Tan Do Road is connected to Provincial Road 825 with a road surface of 11mx2 wide, a median strip of 2m wide, and a sidewalk of 4.5mx2 wide.
Road No. 2: has a 16m wide road surface, 5mx2 wide sidewalk, 36m road width, length 1,583m.
Road No. 4: has a 16m wide road surface, 5mx2 wide sidewalk, 36m wide road, 1,670m length.
Road No. 7: has a 16m wide road surface, 5mx2 wide sidewalk, 36m road width, 1,448m length.
Road No. 9: has a 16m wide road surface, 5mx2 wide sidewalk, 36m road width, 1,522m length.
Road No. 10: has a road surface of 16m wide, sidewalks of 5mx2, road width of 36m, length of 1,483m.
- Secondary roads:
Road No. 1: 14m wide road surface, 4mx2 wide sidewalk, 32m wide road, 660m length
Road No. 3: 14m wide road surface, 4mx2 wide sidewalk, 32m wide road, 1,306m length
Road No. 5: has 14m wide road surface, 4mx2 wide sidewalk, 32m wide road, length 1,383m
Road No. 6: has a 14m wide road surface, 4mx2 wide sidewalk, 32m wide road, 1,314m length
Street No. 8: has a 14m wide road surface, 4mx2 wide sidewalks, and a length of 1,356m.

Power system:
- Taken from Duc Hoa 110/22 KV - 40+63 MVA transformer station through the existing 22KV line along provincial road 825 leading to Hai Son Industrial Park.
Water system
- Underground water plant meets domestic water supply standards.
The fire protection system complies with current State regulations
Telecommunication services
- Design criteria:
Manufacturing factory area: 12 subscribers/ha
Service center area: 24 subscribers/ha
Technical construction area: 10 subscribers/ha
- Design goals and solutions:
Ensure communication needs such as fixed telephone subscriptions, mobile information, and Internet network of the entire area
Ensure the reliability of the communication system.
Construction of underground fiber optic cable from the regional telecommunications station to the central switchboard of the industrial park.
- Cable routes:
From the central switchboard, there are underground copper cable lines with PVC pipes running along one side of the sidewalk on Hai Son - Tan Do Street, Streets 2, 9 and 10 including main cables, branch cables, and point boxes. ...to the regions.
Install cable lines and point boxes with capacity larger than calculated subscriber needs to facilitate future subscriber development needs.
At the cable crossing spaces, there are manholes for pulling the cable over the road.
The center of the cable route is buried 0.8m deep compared to the finished sidewalk.
The capacity of cable routes depends on the information needs on the routes.
On cable routes, arrange cable cabinets on the sidewalk to facilitate connection for factories and enterprises.
Total length of underground cable routes to cable cabinets: 434 m.
Underground cable route to digital distribution box: 1,756m
Total number of subscribers of the entire industrial park: 2,327 subscribers.
Exemption for 02 years, 50% reduction for the next 04 years. Current corporate income tax 22%
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | ||
| Location | Duc Hoa Dong commune - Duc Hoa district - Long An province | |
| Acreage | total area | 261,215ha |
| Factory land area | ||
| Vacant area | ||
| Ratio of green trees | ||
| Operating time | ||
| Current investors | Hai Son Company Limited | |
| Main job | ||
| Occupancy | ||
| LOCATION & DISTANCE: | ||
| Road | From National Highway 1A: 11km | |
| Air | From Tan Son Nhat International Airport: 25 km | |
| Train | Saigon Station: 24km | |
| Sea port | Saigon Port: 28km | |
| INFRASTRUCTURE: | ||
| Geological | The geology is very good, including soil, clay, gravel, under the foundation, so the investment cost to build a factory is reduced, 30% lower than other areas. | |
| Internal traffic | Main road | |
| Secondary branch road | ||
| Electricity supply | Voltage | 110/22 KV – 40 63 MVA |
| Source capacity | ||
| Clean water | Wattage | |
| Highest capacity | ||
| Waste water treatment system | Wattage | |
| Internet and telecommunications | ||
| LEASING PRICE: | ||
| Land | Land rents | |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Deposit | ||
| Minimum area | ||
| Workshop | Factory rental price | |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Scale of factories | ||
| Deposit | ||
| Minimum area | ||
| Management fee | Management fee | Management fee: 0.03 USD/m²/month (excluding VAT) |
| Payment methods | ||
| Electricity price | Peak | |
| Normal | ||
| Idle | ||
| Payment methods | ||
| Supplier | ||
| Price of clean water | Water price | |
| Payment methods | ||
| Water supplier | ||
| Wastewater fee | Price | |
| Payment methods | ||
| Water quality before treatment | ||
| Water quality after treatment | ||
| Other fees | ||