Binh Long Industrial Park is located next to Highway 91, adjacent to the back river, 30 kilometers from Long Xuyen city and 49 kilometers from the economic zone attached to Tinh Bien global border gate. This is a prime location for waterway transportation and is located right in the capital of the agricultural and aquatic raw materials area of Long Xuyen quadrangle. Furthermore, Binh Long's infrastructure includes a river port built by the Ministry of Transport and Communications, capable of receiving ships with a tonnage of 1,000 - 2,000 tons. Industrial clusters are located in prime locations for waterway and land transportation. Notably, it is near agricultural and fishery raw material areas for investment, trading markets, near residential areas, and economic zones associated with global border gates, the country and its abundant labor market. land. Therefore, Binh Long infrastructure is considered one of the typical southern infrastructure.

The project is located in An Giang - a potential new land with a large clean land fund. An Giang is the first province in the west to have two cities in the province: Long Xuyen and Chau Doc. Long Xuyen city is a class II city in An Giang province. An Giang's real estate and land market is said to be relatively high and is a stopping point for many businessmen as the land fund in large cities is increasingly narrowed by There is a wave of investors going to localities with long-term growth potential and large clean land funds.
Not to mention, another important thing that creates the bustle of An Giang real estate is a rich product line, well-developed infrastructure and amenities in the area and outside. The average selling cost today in An Giang ranges from 2 - 6 million VND/m2, much less compared to Saigon. Saigon. Notably, nowadays the platforms and conditions for traveling between these locations are gradually becoming less difficult than before. The above things are the key highlights that make An Giang real estate more and more popular.

Binh Long Industrial Park is located next to Highway 91 and adjacent to the Phu Phu river. Far from Ho Chi Minh City. Long Xuyen is 30km, Chau Doc town is 23km and the economic zone associated with Tinh Bien border gate is 49km. Prime location for waterway transportation and located right in the capital of the agricultural and aquatic raw materials area of Long Xuyen quadrangle. Located in the west of Binh Phuoc province, far from Ho Chi Minh City. Mango field 47km, Ho Chi Minh city about 110km, Hoa Lu global immigration place 41km. The town borders Loc Ninh district to the north, and the other sides border Hon Quan district. Not to mention, there are many kilometers of inter-commune and inter-village roads that have been renewed and paved with asphalt to promote connectivity and facilitate product trading.
Binh Long Industrial Park includes all basic internal amenities to meet the needs of workers at the project:
Transport chain: very convenient on waterways, roads, railways, and airways. The main axis is 15m wide, the sidewalk is 18m wide on each side. The internal chain is 8m wide, each side of the road is 8m wide.
Electricity: The electricity distribution chain is taken from the national grid system with a capacity of 110/22kv.

Water: water distribution chain with capacity of 1, 600m3/day from Phan Thiet's water workshop is always committed to distributing enough water to workshops and factories in the infrastructure.
Wastewater treatment: wastewater treatment workshop with capacity of 6,000m3/day and night, of which phase 1: 2,000m3/day and night has entered operation. T
Waste treatment: waste treatment workshop is built separately
Communication chain: the infrastructure is built with a state-of-the-art telecommunications system that meets global standards to meet all requirements for domestic and international communication solutions.
External amenities of Binh Long Industrial Park project
With a central location, the Binh Long Industrial Park project is close to utility areas as well as quick and convenient regional links:
-33 km from Long Xuyen city
-My Thoi Port 40 km
- Distance from the city. Ho Chi Minh 215km
- Chau Phu Market 4km
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | Management Board of Industrial Parks of An Giang province | |
| Location | Chau Thanh district, An Giang province | |
| Acreage | total area | 131.75 |
| Factory land area | ||
| Vacant area | ||
| Ratio of green trees | ||
| Operating time | 2012 | |
| Current investors | ||
| Main job | Production and processing of sports shoes and garments; Producing animal feed, plastic, consumer goods; Processing agricultural - aquatic - livestock products; food, vegetables; Mechanical professions manufacturing machinery and equipment; | |
| Occupancy | 73% | |
| LOCATION & DISTANCE: | ||
| Road | Long Xuyen city center: 15km | |
| Air | ||
| Train | ||
| Sea port | My Thoi port: 20km | |
| INFRASTRUCTURE: | ||
| Geological | ||
| Internal traffic | Main road | |
| Secondary branch road | ||
| Electricity supply | Voltage | Power line: 110/22KV |
| Source capacity | 80MVA | |
| Clean water | Wattage | |
| Highest capacity | 10000/day | |
| Waste water treatment system | Wattage | 6000/day |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Deposit | ||
| Minimum area | ||
| Workshop | Factory rental price | |
| Rental term | ||
| Type/Class | ||
| Payment methods | ||
| Scale of factories | ||
| Deposit | ||
| Minimum area | ||
| Management fee | Management fee | 0.35 USD/m2 |
| Payment methods | annual | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Supplier | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A | |
| Other fees | Insurance: yes | |