Along with the economic development, Ho Chi Minh City is witnessing a rapid increase in industrial parks and manufacturing facilities. A modern and well-planned factory design has become a key factor in helping businesses optimize production efficiency and enhance competitiveness.
A scientifically designed industrial factory ensures efficient space utilization, worker safety, and long-term operational cost savings. Moreover, a design that complies with construction standards helps businesses meet legal regulations and minimize operational risks.
BIC specializes in providing turnkey design and construction services for industrial factories. With many years of experience and a team of skilled professionals, BIC is committed to delivering optimal, modern, and cost-effective solutions for investors seeking to build efficient and sustainable production facilities.
Investing in a professionally designed industrial factory brings significant advantages to businesses. Below are the key benefits of owning a modern, well-planned facility:
Smart factory design helps minimize construction costs through the selection of appropriate structural systems and materials, reducing waste. An efficient layout also conserves energy, optimizes production lines, and lowers long-term operation and maintenance expenses.
A well-prepared design allows smoother construction with fewer changes during execution. Modern factories often use prefabricated steel structures for quick assembly, significantly reducing build time. This enables investors to start operations earlier, recover capital faster, and meet production demand promptly.
Factories designed to proper standards meet all safety requirements in terms of structure and fire protection. Strong, compliant materials ensure durability and stable operation. Early attention to design accuracy helps prevent technical issues and guarantees optimal construction quality.
A functional and efficient layout ensures smooth workflow and enhances productivity. Well-organized production, storage, and office areas make management easier. Moreover, a modern design anticipates future expansion, allowing easy scaling without disrupting current operations.
A modern and well-maintained facility strengthens a company’s professional image in the eyes of clients and partners. Quality infrastructure reflects the investor’s scale, capability, and commitment. Additionally, a safe and comfortable work environment helps attract skilled labor and fosters a positive company culture.
.jpg)
To successfully deliver each project, BIC follows a professional and systematic process consisting of the following steps:
- Requirement gathering: BIC listens to the investor’s needs and project objectives (scale, functions, estimated budget, etc.).
- Site inspection: Engineers survey the site and collect data on soil conditions in Ho Chi Minh City and nearby areas.
- Preliminary consultation: Based on survey results, BIC proposes a preliminary concept including structural solutions, materials, and initial design orientation.
- Layout planning: Architects develop a functional master plan for production areas, warehouses, offices, and utilities.
- 3D concept visualization: A preliminary architectural perspective helps investors visualize the future factory’s appearance and functionality.
- Feedback and revision: BIC presents the concept to the investor, then refines it based on feedback before moving to detailed design.
- Technical drawings: The engineering team prepares detailed drawings of architecture, structure, electrical, plumbing, and fire protection systems, all complying with construction standards.
- Cost estimation: BIC provides a detailed cost breakdown so investors can plan their budgets accurately.
- Approval and permits: BIC assists investors in submitting design documents for authority review and obtaining construction permits before groundbreaking.
.jpg)
- Preparation: Mobilization of manpower, machinery, and materials after receiving permits.
- Foundation work: Soil treatment and foundation construction following approved structural drawings.
- Structural erection: Installation of the main steel or reinforced concrete frame, followed by roofing and gutter systems. Prefabricated steel structures are assembled quickly with high precision.
- Finishing works: Wall construction (brick or insulated panel), installation of doors, lighting, ventilation, water, electrical, and fire protection systems.
- Quality supervision: BIC engineers continuously monitor all construction stages to ensure safety, quality, and progress compliance.
- Technical inspection: Each stage and the final facility undergo strict inspection to verify performance and safety standards.
- Project handover: After successful inspection, the factory is handed over to the investor along with system operation guidance.
- Warranty and maintenance: BIC provides warranty service per contract and offers long-term maintenance support for worry-free operation.
.jpg)
To ensure quality and compliance, industrial factory design must adhere to the following key standards:
- Zoning: Clearly separate production, storage, office, and service areas. Transport routes for goods should not overlap with pedestrian walkways to ensure safety.
- Production requirements: Layout must align with the company’s manufacturing processes to ensure continuous, efficient workflow.
- Foundation design: Must suit local soil conditions. Foundations must meet TCVN standards for load-bearing and settlement. Proper materials and anti-moisture measures ensure long-term stability.
- Structural frame: Main columns, trusses, and beams should be designed using pre-engineered steel or reinforced concrete depending on project scale. The structure must withstand loads, wind, and weather conditions typical of Ho Chi Minh City.
- Roof slope and material: Adequate slope (15–20%) ensures good drainage. Use galvanized or insulated steel sheets for durability and heat resistance. Roof ventilators and skylights (polycarbonate panels) improve ventilation and daylighting.
- Walls and panels: Can be built with concrete blocks or insulated panels for faster installation and thermal control. Anti-moisture treatment is essential for long-term durability.
- Electrical and lighting: Comply with industrial electrical safety standards. Lighting levels must meet the required illumination for each workspace. Electrical systems should be properly grounded and protected.
- Water supply, drainage, and environment: Provide adequate clean water, wastewater, and stormwater systems. Wastewater from restrooms and production must be treated before discharge.
- Fire safety: Install smoke detectors, fire extinguishers, sprinkler systems, emergency exits, and signage according to fire codes to ensure maximum safety.
- Worker safety: Proper ventilation, temperature control, noise reduction, and protective barriers must be included in design.
- Green design: Modern factories emphasize sustainability, maximizing natural light, ventilation, and green areas to enhance the working environment and environmental responsibility.
.jpg)
- From 20,000 – 70,000 VND/m², depending on project size and complexity.
- Includes architectural, structural, MEP, and fire protection drawings, plus construction documentation.
Note: BIC offers free initial consultation and site survey. Design fees apply only after contract signing.
- Turnkey factory construction: 2,000,000 – 3,500,000 VND/m², including materials and labor.
- Covers foundation, frame, roofing, walls, utilities, office (if any), and auxiliary works such as internal roads and landscaping.
- BIC guarantees the use of certified materials, adherence to design, and full compliance with safety standards.
- Project scale and area
- Structural type and material choice (steel or concrete)
- Special functional requirements (GMP, cold storage, etc.)
- Site location and construction accessibility
- Construction timeline and urgency
(For an accurate quotation, please contact BIC for on-site evaluation and customized cost estimation.)
- Area: ~25,000 m²
- Features: Designed to meet GMP standards, including cold storage and processing zones.
- Scope: Full design-build by BIC, ensuring reliable operation for export production.
- Area: ~10,000 m²
- Features: Complies with GMP-WHO standards for pharmaceutical manufacturing.
- Scope: Full architecture, structure, and specialized MEP design by BIC.
- Area: >40,000 m²
- Features: Large-span pre-engineered steel frame, 12m roof height, equipped with two overhead cranes.
- Scope: Completed in 6 months, exceeding schedule while meeting strict international safety and quality standards.
- Area: ~13,000 m²
- Features: Modern architecture combining glass and aluminum composite panels for a premium office façade; steel-framed production area.
- Scope: Turnkey design-build by BIC in 2024, ensuring both aesthetics and functionality.
If you are planning to build a modern, high-quality factory in Ho Chi Minh City, contact BIC today for expert consultation.
As a trusted design build contractor, BIC is committed to supporting clients from concept to completion.
- Hotline: 0901.815.069 (24/7 Free Consultation)
- Email: thumua@bicons.vn
- Office Address: 78 Street 39, Quarter 5, Hiep Binh Ward, Ho Chi Minh City
Let BIC help your business own a modern, cost-efficient, and sustainable industrial factory perfectly tailored to your production needs. Contact us today to receive expert advice and a preferential quotation for your project!