Name: Cau Quan Industrial Park - Tra Vinh
Address: Cau Quan town, Tieu Can district, Tra Vinh province.
Total area: 120 hectares
Price: 60 USD/m2 (Price does not include VAT and may change depending on actual time).

Investment attraction fields: Processing industry of agricultural and aquatic products; Supporting industries serve the industry - agriculture - fishery sectors; construction, electricity, electronics and other necessary materials and spare parts.
Cau Quan Industrial Park was built along Hau River and Provincial Road 915 in Cau Quan town, Tieu Can district, Tra Vinh province.

14 km from Can Tho City along the Hau river route,
9 km from the center of Tieu Can district and 32 km from Tra Vinh City along Highway 60.
To Ho Chi Minh City: 153 km; Can Tho: 61km
To Tan Son Nhat airport: 156km
To Saigon seaport: 154km
Internal transportation system:
+ Main road (4 lanes)
+ Side branch road (2 lanes)
Electricity: 110/22KV, 40 MVA

Wastewater treatment: according to factory standards, stable capacity of 2,000 m3/day and night
Water: The water plant has a stable capacity
Occupancy:
Rental costs
- Infrastructure management and maintenance fee: 0.3 USD/m2/year
- Electricity supply price: From 0.03 USD/kWh - 0.1 USD/kWh depending on time of electricity use
- Water supply price: 0.4 USD/m3
- Wastewater treatment fee: 0.28USD/m3 (wastewater amount is calculated as 80% of water consumption)
- Tra Vinh province's population is 1,009,168 people, accounting for 5.84% of the Mekong Delta area (according to the 2019 census), of which: 17.2% of the population lives in urban areas and 82% of the population lives in urban areas. 8% of the population lives in rural areas.
- Tra Vinh currently has 15 public vocational training establishments at all levels from elementary to college. In addition to these establishments, in recent times, vocational training in the province has also been carried out in the form of vocational training and tutoring at small production and business establishments; cooperatives, groups, production groups...
- Average income per capita reached 19,325 million VND, equivalent to 920 USD.
Investment incentives for Cau Quan industrial park
Secondary investors investing in factory construction in Cau Quan Industrial Park will enjoy a series of tax incentives and land use fees such as:
Corporate income tax incentives: Tax exemption for 2 years, 50% reduction of tax payable within the next 5 years from the date of taxable income for investment projects in industrial zones.
Preferential tax on import and export of goods. Special tax exemption for imported goods and products to create fixed assets for investment projects in projects that enjoy local import tax incentives.
Incentives on land tax and land use tax exemption and reduction: Land rental exemption for industrial park infrastructure investment projects during the basic construction period (no more than 3 years); The next 11 years for investment projects in the List of fields with special investment incentives.
| Category | Detail | |
|---|---|---|
| OVERVIEW: | ||
| Infrastructure investor | Dong Do Southern Construction Investment Joint Stock Company | |
| Location | Tan Phu District, Ho Chi Minh City | |
| Acreage | total area | 120 ha |
| Factory land area | ||
| Vacant area | ||
| Ratio of green trees | ||
| Operating time | ||
| Current investors | ||
| Main job | Processing industry of agricultural and aquatic products; Supporting industries serve the industry - agriculture - fishery sectors; construction, electricity, electronics and other necessary materials and spare parts | |
| Occupancy | 70% | |
| LOCATION & DISTANCE: | ||
| Road | To Ho Chi Minh city: 153 km; Can Tho city: 14km | |
| Air | To Tan Son Nhat Airport: 156km | |
| Train | ||
| Sea port | Saigon Sea Port: 154km | |
| INFRASTRUCTURE: | ||
| Geological | Hard soil: 1,5-2,5kg/cm2 | |
| Internal traffic | Main road | Number of lane: 4 lanes |
| Secondary branch road | Number of lane: 2 lanes | |
| Electricity supply | Voltage | Power line: 110/22KV |
| Source capacity | 40 MVA | |
| Clean water | Wattage | 40m3/ha/day |
| Highest capacity | ||
| Waste water treatment system | Wattage | 2.000m3/day (QCVN 40:2011/BTNMT) |
| Internet and telecommunications | ADSL, Fireber & Telephone line | |
| LEASING PRICE: | ||
| Land | Land rents | 50 USD |
| Rental term | 50 years | |
| Type/Class | Level A | |
| Payment methods | 12 months | |
| Deposit | 5% | |
| Minimum area | 1 ha | |
| Workshop | 4 USD | |
| Management fee | Management fee | 0.35 USD/m2 |
| Payment methods | 3 months/12 months | |
| Electricity price | Peak | 0.1 USD |
| Normal | 0.05 USD | |
| Idle | 0.03 USD | |
| Payment methods | Monthly | |
| Nhà cung cấp | EVN | |
| Price of clean water | Water price | 0.4 USD/m3 |
| Payment methods | Monthly | |
| Water supplier | Charged by Gov. suppliers | |
| Wastewater fee | Price | 0.28 USD/m3 |
| Payment methods | Monthly | |
| Water quality before treatment | Level B | |
| Water quality after treatment | Level A | |
| Other fees | yes | |